{"efta_number": "EFTA01367263", "page_count": 1, "url": "https://epstein-data.com/EFTA01367263", "pdf_url": "https://epstein-data.com/pdf/EFTA01367263.pdf", "pages": [{"efta_number": "EFTA01367263", "page_number": 0, "text_content": "Amendment #4\nPage 834 of 868\nTable of Contents\nInversiones Eólicas de Orosí Dos, S.A.\n(A Costa Rican Entity)\nNotes to Financial Statements\nDecember 31, 2014 and 2013\n(amounts expressed in US dollars)\n1. Corporate information\nInversiones Eólicas de Orosi Dos, S.A (\"Orosi\" or \"the Company\") was organized as a corporation on August 13, 2008 under the laws of the Republic of Costa Rica.\nOrosi is domiciled in Quebrada Grande de Liberia, Guanacaste, Costa Rica. The Company is a 100% owned subsidiary of Inversiones Eólicas de Costa Rica, S.A., which\nin turn is controlled by Globeleq Mesoamerica (Wind) Limited (\"GME Wind\") an entity domiciled in Bermuda and Crosi's ultimate parent is Actis Infrastructure Fund 2LP.\nThe Company's main activity relates to the construction and future operation of a 50 megawatt wind farm (the Project\") in the province of Guanacaste, Costa Rica. On\nAugust 1, 2013 Orosí entered into a Power Purchase Agreement (PPA) with Instituto Costarricense de Electricidad (\"ICE\") to build, operate and transfer the wind farm,\nwhich is comprised of 25 wind turbine generators of 2 megawatts each. Orosi began the Project's construction in December 2013 and it is expected that energy\ngeneration will start during the third quarter of 2015. The approximate total investment in the construction of the Project is US$119 million, and it is being financed with the\nCompany's own capital and through third-party borrowings (Note 11).\nAs previously indicated, the PPA with ICE was agreed under the build-operate-transfer (BOT) modality with the following significant terms:\nThe purpose of the PPA is for Orosi to undertake the financing, construction, operation, and maintenance of the wind park. The wind park has to be transferred to ICE\nfree of any and all encumbrances at the end of the PPA period.\n⚫ The PPA period is 20 years, which enter into effect upon notice from ICE of the \"Order to Proceed\" (a term defined in the PPA), which happened on October 24, 2013.\nOrosi will generate power under the operational and quality standards established by ICE in the PPA, and has to deliver all power generated to ICE, with the exception\nof that which is required to supply the power plant's own needs.\nThe initial tariff is established in the PPA and a portion is adjusted for inflation on a semi-annual basis.\nOn November 22, 2013 the Company signed a turkey Engineering, Procurement and Construction agreement (EPC) with Gamesa Wind US LLC (\"Gamesa\") by which\nGamesa, as the main sub-contractor, committed to design, engineer, manufacture, procure, install, start-up, construct and test the wind farm. The total EPC price is\nUS$97,220,640, including subsequent change orders for a net amount of USD$1,500,000. The EPC contract includes design-defect and performance warranties in favor\nof Orosi which are supported by a stand-by letter of credit for US$14,358,096.\nThe Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in\nconnection with the acquisition of the Company as explained in Note 25.\nF-514\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058791\nSDNY_GM_00204975\nEFTA01367263\n", "char_count": 3325}]}