{"efta_number": "EFTA01366933", "page_count": 1, "url": "https://epstein-data.com/EFTA01366933", "pdf_url": "https://epstein-data.com/pdf/EFTA01366933.pdf", "pages": [{"efta_number": "EFTA01366933", "page_number": 0, "text_content": "Amendment #4\nPage 504 of 868\nTable of Contents\nInversiones Eólicas de Orosĺ Dos, S.A.\n(A Costa Rican Entity)\nNotes to Interim Condensed Financial Statements\nMarch 31, 2015\n(expressed in US dollars)\n1.\nCorporate information\nInversiones Eólicas de Orosi Dos, S.A. (\"Orosi\" or \"the Company\") was organized as a corporation on August 13 2008 under the laws of the Republic of Costa\nRica. Orosi is domiciled in Quebrada Grande de Liberia, Guanacaste, Costa Rica. The Company is a 100% owned subsidiary of Inversiones Eólicas de Costa\nRica, S.A, which in turn is controlled by Globeleq Mesoamerica (Wind) Limited (\"GME Wind) an entity domiciled in Bermuda and Orosi's ultimate parent is Actis\nInfrastructure Fund 2LP.\nThe Company's main activity relates to the construction and future operation of a 50 megawatt wind farm (\"the Project\") in the province of Guanacaste, Costa Rica.\nOn August 1 2013 Orosi entered into a Power Purchase Agreement (PPA) with Instituto Costarricense de Electricidad (ICE) to build, operate and transfer the\nwind farm, which is comprised of 25 wind turbine generators of 2 megawatts each. Orosi began the Project's construction in December 2013 and it is expected that\nenergy generation will start during the third quarter of 2015. The approximate total investment in the construction of the Project is US$119 million, and it is being\nfinanced with the Company's own capital and through third-party borrowings.\nAs previously indicated, the PPA with ICE was agreed under the build-operate-transfer (BOT) modality with the following significant terms:\nThe purpose of the PPA is for Orosí to undertake the financing, construction, operation, and maintenance of the wind park. The wind park has to be transferred\nto ICE free of any and all encumbrances at the end of the PPA period.\n⚫ The PPA period is 20 years, which enter into effect upon notice from ICE of the \"Order to Proceed\" (a term defined in the PPA), which happened on October 24,\n2013.\n⚫ Orosi will generate power under the operational and quality standards established by ICE in the PPA, and has to deliver all power generated to ICE, with the\nexception of that which is required to supply the power plant's own needs.\n⚫ The initial tariff is established in the PPA and a portion is adjusted for inflation on a semi-annual basis.\nOn November 22, 2013 the Company signed a turkey Engineering, Procurement and Construction agreement (\"EPC) with Gamesa Wind US LLC (\"Gamesa\") by\nwhich Gamesa, as the main subcontractor, committed to design, engineer, manufacture, procure, install, start-up, construct and test the wind farm. The total EPC\nprice is US$97,220,640, including subsequent change orders for a net amount of USD$1,500,000. The EPC contract includes design-defect and performance\nwarranties in favor of Orosi which are supported by a stand-by letter of credit for US$14,358,096.\nThe Company does not have traded debt or equity in the public markets. The accompanying financial statements have been prepared for use in a securities filing in\nconnection with the acquisition of the Company as explained in Note 12.\nF-184\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058461\nSDNY_GM_00204645\nEFTA01366933\n", "char_count": 3313}]}