{"efta_number": "EFTA01366885", "page_count": 1, "url": "https://epstein-data.com/EFTA01366885", "pdf_url": "https://epstein-data.com/pdf/EFTA01366885.pdf", "pages": [{"efta_number": "EFTA01366885", "page_number": 0, "text_content": "Amendment #4\nPage 456 of 868\nTable of Contents\nHidroeléctrica Santa Cruz S.A.C.\nNotes to the interim financial statements\nAs of March 31, 2015 (unaudited) and December 31, 2014 (audited)\n1.\nIdentification and business activity\n(a)\n(b)\nIdentification\nHidroeléctrica Santa Cruz S.AC. (hereafter \"the Company\") is a Peruvian entity incorporated on December 21, 2006, in the city of Lima, subsidiary of Latin\nAmerica Power Perú S.A.C. (a Subsidiary of Latin America Power Holding B.V., domiciled in the Netherlands), which holds 65.7 percent of the voting shares\nof the Company's capital stock (a 30.54 percent direct participation, and a 35.16 percent indirect participation through HSC Holding S.A.C.).\nBusiness activity\nThe Company is dedicated to the generation and sale of electricity to local private and state-owned companies, as well as to engineering activities, and\nactions related to its business activity. Its legal domicile is Av. del Pinar N° 152, Oficina N° 508, Santiago de Surco, Lima, Peru.\nAs of March 31, 2015 and 2014, the Company is developing the Santa Cruz III Hydroelectric Plant, which is located all along the Santa Cruz River (Caraz,\ndepartment of Ancash). Said plant will have 2.8 MW of generation capacity. Construction started in January 2015 and commercial operations are estimated\nto start by July 2016.\nOn January 12, 2012, and February 15, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi I\nHydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi\ndistrict, province of Tarma, department of Junin.\nOn April 18, 2012, and May 5, 2012, the Company started the commercial operations of Group 1 and Group 2, respectively, of the Huasahuasi II\nHydroelectric Plant, which has 10.0 MW of generation capacity. Said plant is located in the basins of the Huasahuasi and Huacuas rivers, Huasahuasi\ndistrict, province of Tarma, department of Junin.\nIn 2010, the Company started operations of the Santa Cruz II Hydroelectric Plant, which has 7.4 MW of generation capacity.\nIn 2009, the Company started operations of the Santa Cruz I Hydroelectric Plant, which is located on the Santa Cruz River (15 km north of the city of Caraz,\ndepartment of Ancash), which has 6.0 MW of generation capacity.\nIn 2008, the Company entered the Regime of Investment Promotion on Electricity Generation by Using Renewable Energy Resources (hereafter \"RER\"),\nthrough which the Company supplies the\nNational Interconnected Electric System (SEIN\" under its Spanish acronym) with energy generated by its four hydroelectric plants that are currently\noperating. For this purpose, the Company and the Peruvian government signed RER contracts, which have a 20-year period maturity, which establish that,\nthrough the mechanism of RER Auctions, the Company receives a fixed fee, adjusted for WPSSOP3500 rate (finished goods less food and energy), per\nmegawatt established for each hydroelectric plant.\nF-136\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058413\nSDNY_GM_00204597\nEFTA01366885\n", "char_count": 3252}]}