{"efta_number": "EFTA01366877", "page_count": 1, "url": "https://epstein-data.com/EFTA01366877", "pdf_url": "https://epstein-data.com/pdf/EFTA01366877.pdf", "pages": [{"efta_number": "EFTA01366877", "page_number": 0, "text_content": "Amendment #4\nPage 448 of 868\nTable of Contents\n(c)\nThe Company ended the construction of Runatullo Ill Hidroelectric plant in November 2014 and Runatullo il Hidroelectric plant in December 2014. These constructions are financed by Banco Intemacional\ndel Perú S.A.A.\nThe amount of borrowing costs capitalized during the year ended December 31, 2014 was S/.10,909,000. The rate used to determine the amount of borrowing cost eligible for capitalization was 8.08\npercent which is the average effective interest rate of the specific borrowings.\nCorresponds to the reclassification of the financial commissions for struduring the loans, to the account \"Loans and borrowings, see note 7.\n(d)\n7.\nLoans and borrowings\n(a) Following is the composition of this caption:\nAnnual\ninterest\nrate\nMaturity\nCurrency\nGuarantee\nMarch 31,\n2015\nS/(000)\nDecember 31,\n2014\nS/.(000)\nLoans(b)\nBanco Internacional del Perú\nS.A.A(b)\n8.5%\nApril 2026 US$\nProperty\n52,339\n48,710\nBanco Internacional del Perú\nSAA(b)\n8.7%\nApril 2028 US$\nProperty\n69,992\n65,139\nBanco Internacional del Perú\n3 month\nS.A.A. (b)\nCayman Branch(c)\nLibor +6%\nApril 2028\nUS$\nProperty\n69,992\n65,139\nBanco BTG Pactual S.A -\n9%\nDecember 2019 US$\nProperty\n18,583\nBanco Internacional del Perú\nS.A.A.\n6.8%\n-\nSI.\nProperty\nStructuring fees\n1,109\n212,015\n(3,862)\n1,674\n180.662\nTotal\n208,153\n180,662\nMaturities\nCurrent portion\nNon-current portion\nTotal\n1,109\n207,044\n1,674\n178,968\n208,153\n180,662\n(b)\n(c)\nIn order to comply with the financial obligations above mentioned, the Company constituted a trust fund with La Fiduciaria.\nOn March 16, 2015, the Company received the last disbursement of the syndicated loan for US$2,218,000 (equivalent to S/. 6,873,000), that was used to\npay obligations with the suppliers involved in the construction of the Hydroelectric Plants.\nCorresponds to the commercial loan for US$6,000,000 (equivalent to S/.18,378,000) obtained on February 5, 2015, that was used to start commercial\noperations of the Runatullo II and III Hydroelectric Plant.\nF-128\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058405\nSDNY_GM_00204589\nEFTA01366877\n", "char_count": 2222}]}