{"efta_number": "EFTA01366649", "page_count": 1, "url": "https://epstein-data.com/EFTA01366649", "pdf_url": "https://epstein-data.com/pdf/EFTA01366649.pdf", "pages": [{"efta_number": "EFTA01366649", "page_number": 0, "text_content": "Amendment #4\nTable of Contents\nPage 220 of 868\nThe counterparty to the PPA is MASSB. The PPA is scheduled to terminate during December 2034 and provides for a flat tariff of MYR 1.14/kWh (approximately\n$0.33/kWh) with the payment of penalties in case of any failure to purchase power by the counterparty. The PPA for Corporate Season provides for adjustments to the\nfeed-in tariff rate on the total solar energy generated in a year if SEDA determines that the project has achieved cost parity, as described below.\nMalaysia contract terms\nEach of our three Malaysian projects, Fortune 11, Silverstar Pavilion and Corporate Season, have similar corporate governance structures and arrangements with their\nofftake purchasers as described below.\nCorporate governance. With respect to each of our three Malaysian projects, our arrangements provide us with the right to nominate and appoint a majority of the\nmembers of the respective boards of directors (except for Fortune 11 in which we can nominate and appoint all directors), each of which has control over its respective\nproject and most matters relating to its management and operations.\nFeed-in tariff adjustments. The PPAs for our Malaysian projects provide for adjustments to the feed-in tariff rate on the total solar energy generated in a year if SEDA\ndetermines that the project has achieved \"cost parity.\" For these purposes, cost parity will occur when the feed-in tariff rate is equal to or less than the displaced costs\n(ie, the average cost of generating and supplying 1 kWh from resources other than the renewable resources through the supply line up to the point of interconnection\nwith the renewable energy installation). Once the applicable project is determined to have achieved cost parity, instead of being paid the feed-in tariff rate, the offtake\ncounterparty will pay us a tariff based on the prevailing displaced cost for the remaining duration of the PPA. In addition, if the total solar energy generated in a year\nexceeds the planned amount for that year, the rate paid for the excess energy may be a price lower than the initial feed-in tariff rate.\nCall Right and ROFO Projects\nWe have call rights to acquire projects from our Sponsor and third parties. We also have ROFO rights with our Sponsor.\nSupport Agreement\nThe Support Agreement establishes: (i) a minimum commitment from our Sponsor to provide us with $1.4 billion of FTM CAFD, which will be satisfied either through (x)\nthe option to acquire the identified Call Right Projects, which currently represent an aggregate capacity of approximately 4,296.4 MW, or (y) the option to acquire\nadditional projects from our Sponsor's development pipeline that will in the future be designated as Call Right Projects; and (ii) a right of first offer on the SunEdison\nROFO Projects\nWe will have the right to acquire Call Right Projects set forth in the table below at prices to be determined by good faith negotiation between us and our Sponsor. The\nSupport Agreement provides that we will work with our Sponsor to mutually agree on the fair market value, but if we are unable to, we and our Sponsor will engage a\nthird-party advisor to determine the fair market value, after which we have the right (but not the obligation) to acquire such Call Right Project. Until the price for a Call\nRight Project is mutually agreed to by us and our Sponsor, in the event our Sponsor receives a bona fide offer for a Call Right Project from a third party, we will have the\nright to match any price offered by such third party and acquire such Call Right Project on the terms our Sponsor could obtain from the third party. After the price for a Call\nRight Asset has been agreed and until the total aggregate Projected FTM CAFD commitment has been satisfied, our Sponsor may not market, offer or sell that Call Right\nAsset to any third party without our consent. The Support Agreement will further provide that our Sponsor is required to offer us additional qualifying Call Right Projects\nfrom its pipeline on a quarterly\n212\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058177\nSDNY_GM_00204361\nEFTA01366649\n", "char_count": 4241}]}