{"efta_number": "EFTA01366648", "page_count": 1, "url": "https://epstein-data.com/EFTA01366648", "pdf_url": "https://epstein-data.com/pdf/EFTA01366648.pdf", "pages": [{"efta_number": "EFTA01366648", "page_number": 0, "text_content": "Amendment #4\nPage 219 of 868\nTable of Contents\nOur Malaysia projects\nSilverstar Pavilion\nOur Silverstar Pavilion project is located in Sepang, Malaysia at the Kuala Lumpur International Airport. This 5.1 MW capacity project commenced commercial operations\nduring the fourth quarter of 2013. This product utilizes fixed tilt technology. To comply with local ownership laws, the project's common equity is held 52% by the local\npartner and 48% by us. Our economic interest in the project is 51% with the remaining 49% held by the local partner. Provisions of the corporate governance documents\nprovide us with sufficient influence with respect to significant corporate and other operating matters.\nThe counterparty to the PPA is Malaysia Airports (Sebang) Sdn. Bhd., or \"MASSB,\" which is a wholly owned subsidiary of Malaysia Airports Holdings Berhad, or \"MAHB.\"\nMAHB owns five international and 16 domestic airports and is controlled by the Malaysian government. MAHB's stock is listed on the main market of Bursa Malaysia and\nis rated A3 from Moody's and its senior debt program is rated AAA from RAM (Ratings Malaysia).\nThe PPA is scheduled to terminate during the fourth quarter of 2034 and provides for a flat tariff of MYR 1.37/kWh (approximately $0.39/kWh) with the payment of\npenalties in case of any failure to purchase power by the counterparty. The PPA for Silverstar Pavilion provides for adjustments to the feed-in tariff rate on the total solar\nenergy generated in a year if SEDA determines that the project has achieved cost parity, as described below.\nFortune 11\nOur Fortune 11 project is located in Sepang, Malaysia at the Kuala Lumpur International Airport. This 4.8 MW capacity project commenced commercial operations during\nthe fourth quarter of 2013. This project utilizes tracking technology. To comply with local ownership laws, the project's common equity is held 52% by the local partner and\n48% by us. We also own redeemable preference shares and shareholder loans such that we have 95% of the economic interest in the project with the local partner\nhaving the remaining 5% economic interest. In addition, provisions of the corporate governance documents provide us with sufficient influence with respect to significant\ncorporate and other operating matters.\nThe counterparty to the PPA is Tenaga Nasional Berhad, or \"TNB,\" which is Malaysia's largest utility company and is majority-owned by the Malaysian government. TNB\nhas a credit rating of BBB+ from S&P, Baa1 from Moody's and AAA from RAM (Ratings Malaysia) for long-term foreign and local debt.\nThe PPA is scheduled to terminate during the fourth quarter of 2034 and provides for a flat tariff of MYR 0.90/kWh (approximately $0.26/kWh) with a payment of penalties\nin case of any failure to purchase power by the counterparty. The PPA for Fortune 11 provides for adjustments to the feed-in tariff rate on the total solar energy generated\nin a year if SEDA determines that the project has achieved \"cost parity,\" as described below.\nCorporate Season\nOur Corporate Season project is located at the satelite terminal of the Kuala Lumpur International Airport in Sepang, Malaysia. This 2.5 MW capacity project commenced\ncommercial operations during December 2013. This project utilizes fixed tilt rooftop installation technology. To comply with local ownership laws, the project's common\nequity is held 52% by the local partner and 48% by us. We also own redeemable preference shares and shareholder loans such that we have 62% of the economic\ninterest in the project with the local partner having the remaining 38% economic interest. In addition, provisions of the corporate governance documents provide us with\nsufficient influence with respect to significant corporate and other operating matters.\n211\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058176\nSDNY_GM_00204360\nEFTA01366648\n", "char_count": 3987}]}