{"efta_number": "EFTA01366644", "page_count": 1, "url": "https://epstein-data.com/EFTA01366644", "pdf_url": "https://epstein-data.com/pdf/EFTA01366644.pdf", "pages": [{"efta_number": "EFTA01366644", "page_number": 0, "text_content": "Amendment #4\nPage 215 of 868\nTable of Contents\nKlipheuwel\nOur Klipheuwel project is located in the town of Caledon in the Western Cape Province of South Africa. This project consists of nine wind turbines. This 17.6 MW capacity\nproject commenced commercial operations during the second quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 65% ownership interestin\nthis project, with our local partners holding the remaining 35% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic\nbenefits from this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of\nEnergy. The project is part of the REIPPP program.\nThe counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the first quarter of 2034 and provides for a tariff of ZAR 1.23/kWh (approximately\n$0.12/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project,\nwith payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the\nseller and a joint venture of third-party providers (Group Five Construction and Iberdrola Engineering & Construction ZA) for an interim period, after which affiliates of our\nSponsor will assume the seller's portion of O&M responsibilities.\nAries\nOur Aries project is located in the town of Kernhardt in the Northern Cape Province of South Africa. This project utilizes fixed tilt technology. This 7.5 MW capacity project\ncommenced commercial operations during the first quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 70% ownership interest in this project\nwith our local partners holding the remaining 30% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic benefits\nfrom this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of Energy.\nThe project is part of the REIPPP program.\nThe counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the fourth quarter of 2033 and provides for a tariff of ZAR 2.76/kWh (approximately\n$0.27/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project,\nwith payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the\nseller and a third party provider (Juwi Solar ZA) for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.\nKonkoonsies\nOur Konkoonsies project is located in the town of Pofadder in the Northern Cape Province of South Africa. This project utilizes fixed tilt technology. This 7.5 MW capacity\nproject commenced commercial operations during the first quarter of 2014. Upon completion of the BioTherm Transaction, we will have a 70% ownership interest in this\nproject with our local partners holding the remaining 30% ownership interest. The terms of the BioTherm Transaction provide that we are entitled to receive economic\nbenefits from this project while we await the closing conditions of the transaction to be satisfied, including the receipt of an approval from the South African Department of\nEnergy. The project is part of the REIPPP program.\nThe counterparty to the PPA is Eskom. The PPA is scheduled to terminate during the fourth quarter of 2033 and provides for a tariff of ZAR 2.76/kWh (approximately\n$0.27/kWh), 100% of which is inflation adjusted for the term of the PPA. The PPA also provides that Eskom will purchase all of the electricity generated by the project,\nwith payments required at the contracted rate for energy deemed delivered if the grid is unavailable beyond a specified period. O&M will be provided by affiliates of the\nseller and a third party provider (Juwi Solar ZA) for an interim period, after which affiliates of our Sponsor will assume O&M responsibilities.\n207\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058172\nSDNY_GM_00204356\nEFTA01366644\n", "char_count": 4499}]}