{"efta_number": "EFTA01366574", "page_count": 1, "url": "https://epstein-data.com/EFTA01366574", "pdf_url": "https://epstein-data.com/pdf/EFTA01366574.pdf", "pages": [{"efta_number": "EFTA01366574", "page_number": 0, "text_content": "Amendment #4\nPage 145 of 868\nTable of Contents\ncombined 148.5 MW of capacity. The aggregate consideration paid for the 100% equity interests was $108.8 million in cash.\nFERSA Transaction\nIn May 2015, Global signed an agreement to acquire from FERSA the wind projects Bhakrani, Gadag and Hanumanhatti located in India, representing 101.6 MW of\ncapacity in the aggregate. The aggregate consideration expected to be paid for the 100% equity interests is $33.1 million in cash. This acquisition is expected to close\nconcurrently with this offering.\nLAP Transaction\nIn May 2015, our Sponsor agreed to acquire six hydro-electric projects controlled by LAP, which will be transferred to us in connection with this offering or shortly\nthereafter. The projects are located in Peru, representing capacity of 72.5 MW in the aggregate. The aggregate consideration expected to be paid for the 100% equity\ninterest in the six projects is $103.1 million in cash\nRenova Transaction\nIn July 2015, Global signed three agreements with Renova to acquire three wind and hydro-electric projects. The projects are located in Brazil and have capacity of 336.2\nMW in the aggregate. The aggregate consideration paid for this acquisition is expected to be $413.4 million, comprised of cash of $187.1 milion and 11,313,850 shares of\nClass A common stock of Global with a value of $226.3 million, assuming an initial public offering price of $20.00 per share of Class A common stock, which is the\nmidpoint of the range set forth on the cover page of this prospectus. The Renova Transaction (except for our ESPRA project) is expected to close concurrently with this\noffering\nGME Transaction\nIn June 2015, Global signed an agreement with GME to acquire four wind projects. The projects are located in Honduras, Costa Rica and Nicaragua, representing\ncapacity of 326.0 MW in the aggregate. The aggregate consideration paid for this acquisition is expected to be $326.4 million, comprised of cash of $315.9 million and\n526,316 shares of Class A common stock of Global with a value of $10.5 million, assuming an initial public offering price of $20.00 per share of Class A common stock,\nwhich is the midpoint of the range set forth on the cover page of this prospectus. The GME Transaction is expected to close following completion of this offering. We\nexpect the acquisition of an 82.0 MW solar project (Choluteca) and a 50.0 MW wind project (Orosi), which are part of the GME Transaction, will be completed when the\nprojects achieve COD, which is expected to occur in the second half of 2015.\nSolarpack Transaction\nIn April 2015, Global signed an agreement for the acquisition from Solarpack Corporación Tecnológica, S.L. of the 26.4 MW capacity Alto Cielo solar project located in\nUruguay. The Solarpack Transaction has not been included in these pro forma financial statements as it is not material as compared to our historical combined financial\nstatements. We expect the Solarpack Transaction will be completed when the project achieves COD, which is expected to occur in the second half of 2015.\n137\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058102\nSDNY_GM_00204286\nEFTA01366574\n", "char_count": 3279}]}