{"efta_number": "EFTA01366502", "page_count": 1, "url": "https://epstein-data.com/EFTA01366502", "pdf_url": "https://epstein-data.com/pdf/EFTA01366502.pdf", "pages": [{"efta_number": "EFTA01366502", "page_number": 0, "text_content": "Amendment #4\nTable of Contents\nPage 73 of 868\nforecasted levels or at all. Degradation of the performance of our solar facilities above levels provided for in the related PPAs may also reduce our revenues.\nUnanticipated capital expenditures associated with maintaining, upgrading or repairing our facilities may also reduce profitability.\nWe may also choose to refurbish or upgrade our facilities based on our assessment that such activity will provide adequate financial returns. Such activities require time\nfor capital expenditures before repowering, and key assumptions underpinning a decision to make such an investment may prove incorrect, including assumptions\nregarding costs, timing, available financing and future power prices. This could have a material adverse effect on our business, financial condition, results of operations\nand cash flows.\nMoreover, spare parts for wind and hydro-electric turbines and solar facilities and key pieces of equipment may be difficult to acquire or be unavailable to us. Sources of\nsome significant spare parts and other equipment are located outside the jurisdictions in which we operate. In addition, with respect to wind and hydro-electric projects,\nfrom time to time we may use less well known turbine suppliers, or may purchase wind and hydro-electric turbines and spare parts with less established track records. If\nwe were to experience a shortage of or inability to acquire critical spare parts we could incur significant delays in returning facilities to full operation, which could\nnegatively impact our business financial condition, results of operations and cash flows.\nOur Sponsor and other developers of energy projects depend on a limited number of suppliers of solar panels, inverters, wind turbines, water turbines and\nother system components. Any shortage, delay or component price change from these suppliers could result in construction or installation delays, which\ncould affect the number of projects we are able to acquire in the future.\nOur solar projects are constructed with solar panels, inverters and other system components from a limited number of suppliers. Similarly, there are a limited number of\nsuppliers of wind and water turbines and other related system components. This makes us susceptible to quality issues, shortages and price changes. If our Sponsor or\nthird parties from whom we may acquire energy projects in the future fail to develop, maintain and expand relationships with these or other suppliers, or if they fail to\nidentify suitable alternative suppliers in the event of a disruption with existing suppliers, the construction or installation of new solar, wind, hydro-electric or other clean\npower generation projects may be delayed or abandoned, which would reduce the number of available projects that we may have the opportunity to acquire in the future.\nThere have also been periods of industry-wide shortage of key components, including solar panels, in times of rapid industry growth. The manufacturing infrastructure for\nsome of these components has a long lead time, requires significant capital investment and relies on the continued availability of key commodity materials, potentially\nresulting in an inability to meet demand for these components.\nIndia recently considered an anti-dumping duty on solar cells and panels imported from China, Taiwan, Malaysia and the United States. However, there are currently no\nanti-dumping duties levied on such imported solar cells and panels. Moreover, we are not aware of any additional threatened tariffs and/or duties by governments on solar\ncells or other components and materials used in the development of solar generation facilities in the countries in which we operate or may operate in the future. However,\nsuch tariffs or duties could be imposed in the relevant jurisdictions in the future. The imposition of such tariffs or duties could hinder or reduce future development of solar\ngeneration facilities in the affected market and limit the number of solar projects we are able to acquire in such markets.\nA shortage of key commodity materials could also lead to a reduction in the number of projects that we may have the opportunity to acquire in the future, or delay or\nincrease the costs of acquisitions.\n65\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058030\nSDNY_GM_00204214\nEFTA01366502\n", "char_count": 4474}]}