{"efta_number": "EFTA01366501", "page_count": 1, "url": "https://epstein-data.com/EFTA01366501", "pdf_url": "https://epstein-data.com/pdf/EFTA01366501.pdf", "pages": [{"efta_number": "EFTA01366501", "page_number": 0, "text_content": "Amendment #4\nPage 72 of 868\nTable of Contents\nadditional costs for our business and may reduce electricity generation during the time in which we bring the affected projects into compliance, which could have a\nmaterial adverse effect on our business, financial condition, results of operations, cash flows and CAFD.\nSubstantially all of our assets are also subject to the rules and regulations applicable to power generators generally. If we fail to comply with these mandatory reliability\nstandards, we could be subject to sanctions, including substantial monetary penalties, increased compliance obligations and disconnection from the grid\nOur Sponsor, and third parties with whom we have entered into or expect to enter into call rights agreements, may incur additional costs or delays in\ncompleting the construction of certain power generation facilities, which could materially adversely affect our growth strategy.\nOur growth strategy is dependent to a significant degree on acquiring new clean energy projects from our Sponsor and third parties. Our Sponsor's or such third parties\"\nfailure to complete such projects in a timely manner, or at all, could have a material adverse effect on our growth strategy. The construction of clean energy facilities\ninvolves many risks including:\n⚫ delays in obtaining, or the inability to obtain, necessary permits and licenses;\n⚫ delays and increased costs related to the interconnection of new power generation facilities to the transmission system;\n⚫the inability to acquire or maintain land use and access rights;\n•\nthe failure to receive contracted third-party services;\ninterruptions to dispatch at our facilities;\n.\nsupply interruptions;\nwork stoppages;\n. labor disputes;\n•\nweather interferences;\n⚫ unforeseen engineering, environmental, geological and hydrological problems;\n⚫ unanticipated cost overruns in excess of budgeted contingencies;\n⚫ failure of contracting parties to perform under contracts, including engineering, procurement and construction contractors; and\noperations and maintenance costs not covered by warranties or that occur following expiration of warranties.\nAny of these risks could cause a delay in the completion of projects under development, which could have a material adverse effect on our growth strategy.\nMaintenance, expansion and refurbishment of power generation facilities involve significant risks that could result in unplanned power outages or reduced\noutput.\nOur facilities may require periodic upgrading and improvement. Any unexpected operational or mechanical failure, including failure associated with breakdowns and\nforced outages, and any decreased operational or management performance, could reduce our facilities' generating capacity below expected levels, thereby reducing our\nrevenues and jeopardizing our ability to pay dividends to holders of our Class A common stock at\n64\nhttp://cfdocs.btogo.com:27638/cf/drv7/pub/edgar/2015/07/20/0001193125-15-256461/d78... 7/20/2015\nCONFIDENTIAL - PURSUANT TO FED. R. CRIM. P. 6(e)\nCONFIDENTIAL\nDB-SDNY-0058029\nSDNY_GM_00204213\nEFTA01366501\n", "char_count": 3084}]}