{"efta_number": "EFTA01302901", "page_count": 1, "url": "https://epstein-data.com/EFTA01302901", "pdf_url": "https://epstein-data.com/pdf/EFTA01302901.pdf", "pages": [{"efta_number": "EFTA01302901", "page_number": 0, "text_content": "Page\n5of-\nDate: 7/6/19\nLocation: 9 East 71st Street New York, NY-St\nCase #: 31E-NY-3027571\n•Preparer: SA Margaret Girard\nFloor\nDirection\nA-216\n216\n• Date 7/11/19 • Prepaner: sos Kimberly meder\nGrill, Typical A\nWindows, North Elevation\nA-20\nA-264\n523\n5165\nNew Brick and CMU\nEsting Window Openings\nEast Facade, Typ\nSee Exterior Restoration Dwgs, R2 & R7\nW\nHO\nAt Pathrub\nCeramic Tile At Bathtub\n-263\n5-03\nnical Equipment\nOFD\n-Line of Existing Masy to\nRemoved\nEE\nElevator\nStriped Doveter\n70cm wide\nDeart\nA-261\nA-261\nA-201\nTO Scale\n9 E 71\nNEW\nYORK\nMechanical Equipment\n5-05\nCo\nшаху\n서!1.47\nto be lined\nあり\n(no borde\nstr\nH\ned Bank\nTo be lined.\n75\n1\nCeramic Tile At Shower\nOHTO\nROOM\nROOM NAME\nENLARGED\nLEVATIONS\nMAN\nService Stair\nCorridor\nA-261\nFlegor Venue\nA-31\nMex Ferigment Ren\nBedriven\n4.3599\nActewm\nCheet\nAal\n513\nPeshroom\nDing Ame\nBechrooms\nClaver\nDedrarn\nVerubuis\nA-208\nKicher\nA-214\nVesthule\n421\\\nPedroc\nClums\nThe Office of\nTHIERRY W. DESPONT\n335 Greenwich Street\n(212) 334-9444\nMECHANICAL ENGINEERS\nJohn L. Aler\nConlung Engineers\n31 Knight Sm\nNorwalk, CT 06851\n(203) 866-5538\nSTRUCTURAL ENGINEERS\nOve Arup & Partars\n260 Fih Avenue\nNew York, NY\n(212) 779-2221\nFacsimile (212) 779-2228\nDATE\nREVISIONS\nJune 22, 1990 Revisions\nAugust 31, 1990 Revisions\nDECEMBER 17, 1990\nMILLWORK PACKAGE\nSHEET 6\nMarch 1, 1991\nREVISION MAY 7,1991\nREVISION AUGUST 14, 1991\nFIFTH FLOOR PLAN\nPLAN LEVEL T\nDATE MAY 21, 1990\nDRAINING\nA-106\nSDNY_GM_00167748\nEFTA 00191353\nEFTA01302901\n", "char_count": 1456}]}