{"efta_number": "EFTA01222235", "page_count": 84, "url": "https://epstein-data.com/EFTA01222235", "pdf_url": "https://epstein-data.com/pdf/EFTA01222235.pdf", "pages": [{"efta_number": "EFTA01222235", "page_number": 0, "text_content": "NO.  \nCH* 1049 \nDate  Feb. 7, 2011 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \n45 Mars Hill, Fredencksted. St. Croix 00840 \nCyril E. King Airport, St. Thomas 00802 \nTel (340) 773-1082 Fax: (340) 778-4620 \nTel: (340) 774.3320 Fax: (340) 714-9532 \nPERMISSION IS HEREBY GRANTED TO:  * \nLLC \nTO (Construct, Repair, etc.):  Construct Pool w/ Cabana. Deck & Eouioment Room \nDescription of structure:  As Per Approved Plans \nLocation:  Pending. Little St. James Island \nApproximate cost of work:  S383.300.00\nPerson(s) in charge of work: \nREMARKS:  As Per IRC 2009 and VI Code Title. 29, Ch.. 5 Code Compliance \nFEE: 50.00 \ntssio.aer fPtanning and Natural Resources \ne?2,5-i /\n7)- • \n- /O4_ \n/O - \n- \nEFTA01222235\n", "char_count": 782}, {"efta_number": "EFTA01222235", "page_number": 1, "text_content": "erc_.,dc. \nNo. \n375-08 \nBUILDING PERMIT \nDate \nmay 16. 20fIR \nGOVERNMENT OF THE VIRGIN ISLANDS \n0 _____ \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \n' DIVISION OF PERMITS \nCYRIL E. KING TERMINAL BUILDING. 2nd FLOOR \nFAX. (340) 714-9532 \nCHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 \nTEL: (340) 774-3320 \nPERMISSION IS HEREBY GRANTED TO \nTO (ccnnium.repmr.emi \nL.S.J., LLC \nInstallation of Mechanical Equipment \nDescription of structure: \nReinf. Conc. \nLocation: \nApproximate cost of work: $ \nPerson(s) in charge of work: \nREMARKS: \nBuilding Code \n#Little St. James \nFEE: S  11,704.42 \n1,200,000\nLafayette Contractors \nezfri prz.enir ' Gzr- 63 - ME-\nN- 2 -07 \nett, \nentura, Territorial Director \nCommissioner of Planning and Natural Resources \nEFTA01222236\n", "char_count": 754}, {"efta_number": "EFTA01222235", "page_number": 2, "text_content": "No. \n113-08\nFAX: (340) 714-9532 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \n- \n0 - \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \nCYRIL E. KING TERMINAL BUILDING. 2nd FLOOR \nCHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 \nPERMISSION IS HEREBY GRANTED TO \nLSJ, LLC \nDate Dec. 20, 2007 \nTEL: (340) 774.3320 \nTO(cwutructrepair.em) \nConstruct Mechanical Building \nDescription of structure: \nReinf. Conc. \nLocation: \n#Little St. James \nApproximate cost of work: S \nPerson(s) in charge of work: \n$2,000,000 \nLafayette Contractors, LLC \nREMARKS: \nConstruction shall be done in accordance with Ti \nSection 292 of the V.I. \nBuilding Code \nFEE: S \n20.00 \nern pear - 7'4 zr- 53-04 \n//- 7 -07 \n-O4\\_— \ni\nMaureen Bur —Ven ura, Territorial Director \nllCommissioner of Planning and Natural Resources \nEFTA01222237\n", "char_count": 822}, {"efta_number": "EFTA01222235", "page_number": 3, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nCoastal Zone Management Program \n8100 Lindberg Bay. Ste. #61 \nCyril F., King Airport. Terminal Building Second Floor \nSt. Thomas, Virgin Islands 00802 \nTel.: (340) 774.3320 \nFax: (340) 714-9524 \nCERTIFICATE OF OCCUPANCY \nCZM PERMIT NO. CZT-61-06 (U \nPursuant to Title 12, Chapter 21, Section 910-13, of the Virgin Islands Rules and Regulations, a \n\"Certificate of Occupancy\" is hereby approved for: \nName: \nLSJ. LLC. \nStructure:  Office building & covered pool natio \nLocated at:  Parcel No. C. Estate Little St. James \nRed Hook \nQuarter, Island of:  \nSt. Thomas, \n US Virgin Islands. \nAlicia Barnes \nCommissioner \nFORM CZM-22 (Revised May 2001) \n9// ,- 34 /7 \nate \nEFTA01222238\n", "char_count": 780}, {"efta_number": "EFTA01222235", "page_number": 4, "text_content": "No. \n084-07 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \n— \no — \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \nCYRIL E. KING TERMINAL BUILDING, 2nd FLOOR \nFAX: (340) 714.9532 \nCHARLOTTE AMALIE, ST. THOMAS, V.I. 00802 \nTEL: (340) 774-3320 \nDate Nov. 17, 2006 \nPERMISSION IS HEREBY GRANTED TO \nLSJ,LLC \nTO gkostrud. repat \nConstruct Office \nDescription of structure: \n8\" CMU \nLocation: \n/Little St. James \nApproximate cost of work: $ \nPerson(s) in charge of work: \nREMARKS: \nConstruction shall be done in accordance with Titl \nSection 292 of the V.I. \n'900,000 \nRRCI Constructors,LLC \nBuilding Code \nFEE: $  \n6,453.31 \n4  \n/ \neatt74:  \nk : SC ii___ \nCottenIse oner of \nNatural Resources \nEFTA01222239\n", "char_count": 727}, {"efta_number": "EFTA01222235", "page_number": 5, "text_content": "• \nMINOR COASTAL ZONE MANAGEMENT PERMIT NO. CZT-61-06L \nL \nAUTHORITY \nThis permit is issued by the Commissioner of the Department of \nPlanning and Natural Resources, and is administered and monitored by the Department \npursuant to Title 12, Chapter 21, Virgin Islands Code. As herein, \"Permitter\" is the \nGOVERNMENT 01? THE VIRGIN ISLANDS and the \"Permittee\" is LSS, LLC. \nH. \nSCOPE \nThis permit allows the site preparation and construction of a 2,500 square \nfeet of office space, patio and pool to an existing residence located at Parcel C Little St. \nJames, St. Thomas, Virgin Islands. \nDI \nTERM \nThis permit is effective upon its signing by the Commissioner of the \nDepartment of Planning and Natural Resources, pursuant to Virgin Islands Code, Title \n12, Chapter 21. Authorization for construction under this permit will expire if the \nPermittee fails to commence work within twelve (12) months from the date this permit \nbecomes effective. \nIV. \nV. \nDOCUMENTS INCORPORATED BY REFERENCE \nEXHIBIT A: CZM permit application dated July 10, 2006 \nEXHIBIT B: Required document submittal (deed, tax letter and maps) \nEXHIBIT C: Site plan and drawings \nGENERAL CONDITIONS \nA. \nLiability The Permittee agrees to assume full and complete responsibility for all \nliability to any person or persons, including employees, as a result of its control of \n• the area described in Paragraph 2 of this permit, and all improvements thereon \n(which area and improvements are herein after referred to as \"the premises\") and \nto hold the Permittor five and harmless from civil or other liability of any kind \nduring the time the Permittee is in control of the premises pursuant to this permit. \n13. \nPersonal Prope y and Damage All personal property of any kind or description \nwhatsoever located on the premises will be there at the Permittee's sole risk. \nC. \nAssignments or Transfer \nThis permit may not be transferred or assigned except \nas provided in Section 910-15 of the Regulations of the Coastal Zone \nMana\n... [truncated, 2181 chars — for the full page use /api/corpus/document/EFTA01222235/5 or ?id=EFTA01222235&page=5]", "char_count": 2181}, {"efta_number": "EFTA01222235", "page_number": 6, "text_content": "E. \nReliance oninfonnation and Data \nThe Permittee affirms that the information, \nand data which he/she provided in connection with his/her permit application is* \ntrue and accurate, and acknowledges that if subsequent to the effective date of this \npermit such information and data proves to.be false or inaccurate, the permit nay \nbe modified, suspended or revoked in whole or in part, and that the Commissioner \nmay, in addition, institute appropriate legal action. \nF. \nDevelopment to be Commenced \nAny and all development approved by this \nCoastal Zone Management Permit shall be commenced within twelve (12) months \nfrom the date this permit becomes effective. Failure to perform substantial work \nwithin such period and thereafter until completion of construction will cause the \npermit to lapse and render it null and void unless the Committee grants an \nextension. \nG. \nNotification of Completion Upon completion of any activity authorized or \nrequired by this Coastal Zone Management Permit, the Permittee shall promptly \nso notify the Director of the Division of CZM (\"The Director\") and where the \nservice of a professional engineer were required in undertaking the activity, a \ncertification of compliance provided by the project engineer that the plans and \nspecifications of the project and all applicable Virgin Islands Code requirements \nhave been met, shall be filed with the Director. \nH. \nInspection The Commissioner or his authorized agents or representatives shall \nhave the power to enter at reasonable time during projects working hours upon \nany lands or waters for which a Coastal Zone Permit has been issued. The \nPermittee shall permit such entry for the purpose of inspection and ascertaining \ncompliance with the terms and conditions of said Coastal Zone Management \nPermit.: The Permittee shall provide access to such records as the Commissioner \nin the performance of his duties under the Act may require the Pennittee to \nmaintain. Such records may be examined and co\n... [truncated, 2739 chars — for the full page use /api/corpus/document/EFTA01222235/6 or ?id=EFTA01222235&page=6]", "char_count": 2739}, {"efta_number": "EFTA01222235", "page_number": 7, "text_content": ".11 \nK. \nNotices All notices sent or required to be sent hereunder must be certified mail, \nreturn receipt requested. If addressed to the Permittor, same shall be sent to the \nCommissioner of the Department of Planning and Natural Resources, \nGovernment of the Virgin• Islands, Cyril E. King Airport, Terminal Building-\nSecond Floor, St. Thomas, Virgin Islands 00802, or to such place as the Permittor \nmay herein after designate by certified mail. If addressed to the•Pennittee, same \nshall be sent to LSJ, LLC, 6100 Red Hook Quarter, Suite B, St. Thomas, Virgin \nIslands 00802, or to such place as the Permittee may hereinafter designate by \ncertified mail, return receipt requested. \nL. \nNonwaiver \nOne or more waivers by the Permittor of any covenant or condition \nof this permit shall not be construed as a waiver or breach of the covenant or \ncondition, and the consent or approval of the Permittor to or of any acts by the \nPermittee requiring the Permittor's consent or approval shall not be construed as \napproval of any subsequent similar act by the Permittee. \nM. \nRevocation \nIt is specifically understood that all foregoing covenants and \nagreements, as well as other terms and special conditions hereby agreed to by \nPermittee, are to be well and faithfully kept by Permittee and that any failure by \nPermittee to keep same will result in revocation of this permit. \nN. \nOther Approval \nIf the development covered under this permit requires separate \nand distinct approval from the United States Government or the Government of \nthe Virgin Islands or any agencies, departments, commissions or bureaus thereof, \nthen no development or occupancy is allowed under this permit until such permits \nor approvals have been obtained. \nO. \nAbandonment \nIf the Permitter abandons, deserts or vacates the premises or \ndiscontinues its operations at the premises for a period totaling six (6) consecutive \nmonths, then the permit will terminate automatically and be rendered null and \nvoid. \nP. \nDa\n... [truncated, 2831 chars — for the full page use /api/corpus/document/EFTA01222235/7 or ?id=EFTA01222235&page=7]", "char_count": 2831}, {"efta_number": "EFTA01222235", "page_number": 8, "text_content": "VI. \nSPECIAL CONDITIONS \nA. \nThe Division of Coastal Zone Management shall be notified at least two (2) \nworking days before work commences. \nB. \nThis permit is valid only for work as stated in Paragraph 2, Scope. \nC. \nThe Coastal Zone Management permit placard shall be placed in a conspicuous \nlocation on site as soon as work commences. \nD. \nAll other necessary permits, including construction permits from the Division of \nBuilding Permits, shall be obtained prior to the commencement of work. \nE. \n\"Upon discovery of any archaeological or historical site, or human burial site or \nremains upon private lands, the owner or his representative shall immediately \nnotify the Virgin Islands State Historic Preservation Office verbally and in \nwriting.\" \nF. \nSilt fencing shall be installed with steel posts and wire fence support as described \nin the 2002 Environmental Protection Handbook. \nG. \nSite disturbance shall be limited to areas designated on the approved drawings. \nH. \nExcavation shall be limited to the footprint of the structure to be constructed. \n1. \nA protective berm shall be installed around all excavated areas to prevent silt run \noff \n4 \nEFTA01222243\n", "char_count": 1173}, {"efta_number": "EFTA01222235", "page_number": 9, "text_content": "C) \nOn this 9\" `day of k\\)fras a,,1/4  , 2006 the Department of Planning and Natural Resources \nhereby issues Minor CZM Permit No. CZT-61-06L. \ncan C. Plaskett, Esq. \nCommissioner \nI, the unders \nd, have read and understood all terms and conditions established in Permit No. \nCZT-6 \nhereby agree to be bound by the terms and conditions contained therein. \n4 S \n5 \natWI! \nEFTA01222244\n", "char_count": 384}, {"efta_number": "EFTA01222235", "page_number": 10, "text_content": "No. \n084-07 \nBUILDING PERMIT \nDate \nJuly 13, 2007 \nGOVERNMENT OF THE VIRGIN ISLANDS \n0 \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \nCYRIL E. KING TERMINAL BUILDING. 2nd FLOOR \nFAX: (340) 714-3632 \nCHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 \nTEL (340) 774-3320 \nPERMISSION IS HEREBY GRANTED TO \nTO (construct. repair. etc. ) \nDescription of structure: \nL.S.J., LLC \nRevision to elk #084-07 \nLocation: \nApproximate cost of wort S \nPerson(s) in charge of wort \nLittle St. James \nS514.000 \nPneleci rlecL \nREMARKS: \nConstruction shall be done in accordance with Tit1,29, Section 292 of the V.I. \nBuilding Code \nFEE: S igaZin \n474.00 \nteen Bur - entura, Territorial Director \nCommissioner of Planning and Natural Resources \nEFTA01222245\n", "char_count": 752}, {"efta_number": "EFTA01222235", "page_number": 11, "text_content": "(TOVKRNMINI ()I; I IF. UNITRI) STA'I'NS VIRGIN ISI.ANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nCoastal Zone Management Program \n45 Mas I lilt. Frederiksied \nNI. Croix. I &N. Virgin Islands nON411-141.1 \nl'34M 77.1. 1082 \nI:as:13411177 I• (141 \ncycil P.. k int.. \nnl. lerminal Ind? 2nd 1.1~r \nStillman'''. Virgin Islaals 0051P \nId:1MM 774-3320 \nFax 13411 7144524 \nREQUEST VOR AMMOMENT/ MOINEICATIQN \nMINOR ~TAIL ZONE PERMITS No. eir - 53 - O41L \nThis nines! is pontoon M 'homer Å I. 'lb le I2 of the Virgin \nIslands <'isle and the 'mdal fame Managemem Rules aml Regulations. \nI. Name. Mailing address and telephone number of applicant \nS 7.) 1.1-e- 7 RØ. IS« 175, Sr 711010.f.\nV! 4_0 0 041 .; 39 o - 7 /I- 10S-S \n2. WOW, lille. mailing address and telephone number of Hie owner of Me properly. L.S. 7,a Ltt \nlitmtlik i. VI ooSoll • Seto 774-gosY \nUlTa Jr. Timar \n3. Location of activity. l'Iol No. \nISLAUD \ndisdale \n317) ticyit \nIsland U. likwar \n4. Summary or proposed activity. Include all incidental impnweinems such as oldigles, roads, de. (I Ise additional \nsheets if necessary). SEE. ~4,,gframi 4H4T A \nThis modilication if approved is sidijd;t in the conditions of Pcrmii No. (I• 77 Ss -04'L \ntpersetled by the modi heal ion. \ng/1-51O 7 \nhi / \nIhmr \nSi) \nu-e. \nY Pi. aft 873\" \nMai an« rllll \n?riv Ownei \nI /ale\ng/2-1A 7 \nThe ('ommissioner reviewed die requesled aniencli»enl / modification:Ind determined dial il will / will mu \nsignificandy modify. die sy;('pe. nature or elianiclerislies of the proposed developmenl. \ne \nl e\nInspector \nI \nApplirai ion Approved \n( 1/4Y\" \nApplical ion l)isappnwed \n( \nSEE finxteuia, fhp,r6e. or ArrogAlfix \nMer \nEFTA01222246\n", "char_count": 1673}, {"efta_number": "EFTA01222235", "page_number": 12, "text_content": "I:maim:dim] Sheet A In Applicalion Ihr Mcalilicaticaa\nell 53-041 \nPage I ol'2 \nCONTIM InTioN SHEET A \nI. Documents Comprising Application \nIbllowing documents comprise this Application: \n1. Cover Letter Dated September 25, 2007 \n2. Power of Attorney \n3. This Continuation Sheet A \n4. WM Drawing Package (bound: Muguire Group) consisting of: \nDrawing. No. \nTitle \na. CZM C I00 \nExisting Conditions and Location Map \nb. CZM C101 \nOverall Site Plan \ne. CZM O102 \nSite Plan mid ESCP \nd. WM C201 \nGrading and Utility Plan \ne. WM ('501 \nOn Site Sewage Disposal System & Site \nDetails \nCZM Al00 \nBasement Plan \ng. CZM A101 \nFirst Floor Plan \nh. CZM A20 I \nBuilding Elevations \ni. CZM SI 00 \nFoundation Plan \nj. WM SIGI \nBasement Wall Plan \nlc. CM 8102 \nFirst Floor Framing Plan \nI. WM 5103 \nFirst Floor Wall Plan \nCZM SI 04 \nRoot. Framing Plan \n5. Exhibit 1: Drawing 8-1 1.00: 1994 Drawing of Wm. Karr showing original \nbuilding foot print as compared to the limn print or the building covered by this \nApplication (shown in red). \n6. Exhibit 2: \"Little SI. James Island Mechanical Building Addendum-  evaluating \nenvironmental issues with reference to \"Base Line Environmental Study\" as \ndescribed below. \nII. Proposed Modifications: \nThe proposed modification to the existing permit consists of the following changes to \nthe following use within a compound or buildings which had previously been authorized \nunder Minor Permit No. ('ZT 53-04L: \nI. The original permit mentioned above, among other things. authorized the \nconstruction ol'an RD-Generator Building of the size and dimensions which arc \nshown in black on Exhibit I with the ctincnt building superimposed over it in red. \nEFTA01222247\n", "char_count": 1692}, {"efta_number": "EFTA01222235", "page_number": 13, "text_content": "CMinflation Shed A to Application ('or Modification \nWI' 53-041. \nPage 2 of 2 \n2. Construction was started on the buildings which comprised the projects approved \nby Minor Permit No. CZT 53-041.. including excavation Ibr the 12O-Generator \nbuilding at issue here. \n3. That work has been halted in order to revise the plan for that building to reduce its \nsize and improve its efficiency as the mechanical room structure for the uses on \nthe island. \n4. Accordingly. the lbotprint of the building covered by this application is smaller \nand has been relocated in a way which is more favorable to the environment in \nthat is it rull covered, calls ror less excavation that the previous building. and is \nless visible. and much more fimetional than the original approved building. \n5. While the overall amount of construction has been reduced. the fundamental \ndesign and composition of the stnicturc is similar to that which was previously \nsubmitted and approved. i.e. concrete and block. \nIllimpact to the Environment \nI. The Applicant is filing an environmental assessment report with this Application \nentitled \"Little St. James Island Environmental Base Line Study\" which evaluates \nexisting conditions for the entire island or Little St James. \n2. This filing or this document is consistent with the understanding reached with \nCZM stall' this June that the applicant submit such a study so that these \napplications for a minor permit as a tool for viewing such an application in the \ncontext of the overall environment of the island. \n3. The Base Line Study discusses the current conditions of the area covered by (his \napplication as well as the balance of the island. \n4. Also enclosed is Addendum #1 to the Base Line Study entitled \"little St. James \nIsland Mechanical Building Addendum\" which gives a summary of how the \nchanged location and size at' this building will or will not impact existing \nconditions as described in the Base Line Study. \n5. In summary, the Addendum shows that with\n... [truncated, 2523 chars — for the full page use /api/corpus/document/EFTA01222235/13 or ?id=EFTA01222235&page=13]", "char_count": 2523}, {"efta_number": "EFTA01222235", "page_number": 14, "text_content": "GRANT OF AUTHORIZATION \nThe Undersigned, Jeffrey E. Epstein, being the sole member of L.S.J., LI.C, \nlimited liability company organized under the laws of the State of Delaware (the \n\"Company\") which is the owner of record title to the real property located in the United \nStates Virgin Islands and known as Little St. James Island (the \"Real Property) hereby \nauthorizes each of A. James Casner III, Esq., Stryker Duensing Casner & Dollison,. \nBox 6785, St. Thomas, USVI, 00804, and W. John Amerling, 6501 Rai Hook Plaza, \nSuite 201, St. Thomas VI, 00802, each acting individually, for, on behalf of, and in the \nname of the Company, to execute all such applications, affidavits, permits, and other \ndocuments, and to pay such costs, fees and expenses, and to take all such other action, as \nmay be necessary, appropriate, and/or desirable in connection with any and all of the \nCompany's applications to the Department of Planning and Natural Resources of the \nUnited States Virgin Islands and any other agency of the Territory which has jurisdiction \nover the land use and development of property in the Territory for any and all \ndevelopment and building permits, including, but not limited to CZM permits, earth \nchange permits, driveway and dock permits, as well as with any and all applications \nand/or requests of the Company made to the United States Corps of Engineers and the \nUnited States Enviromnental Protection Agency, with respect to the Real Property. \nThis Grant of Authorization supercedes all prior Grants of Authorization and, \nunless sooner revoked in writing, will remain in full force \nect until Mardi I, \nJeffrey E. Epstein \nSole Member of L.S.J., LLC \nWitnesses \nEFTA01222249\n", "char_count": 1703}, {"efta_number": "EFTA01222235", "page_number": 15, "text_content": "Supplemental Filing of L.S.J., LLC: October 16.2007 \nAs requested, the following is a brief summary of the proposed changes covered by the \nApplication for modification to Permit CZT-53-04L dated September 25, 2007: \n• \nThe mechanical building shown on A.3.00 of the original drawings of Mr. Karr dated \nSeptember 10, 2004 is being changed to substitute the building shown on A 100 and A101 \nof the current application \n• \nDrawings A100 and A 101 change the structure shown on A.3.00 as follows: \no The building foot print has been reduced from 16,500 square feet to 11,748 square \nfeet \no The cistern and R0 tank shown on A.3.00 have been consolidated into one larger \ncistern which has now been placed in the basement of the new building \no The tank storage area shown on A.3.00 has been placed in a deeper and safer area \nbelow ground in the basement of the new building \no A locker room has been added to the balance of the basement in the new building \no The ro, electrical, storage and other rooms shown on A.3.00 have been rearranged \non the floor above the cistern and fuel tank areas to provide for more efficient use \nof space as shown in A101 of the current filing \n• As is shown in Exhibit I to the current filing, the new building requires less excavation \nbecause it is not set back as far into the hill as the previous building \n• The new building, like the old, will have a sod roof over the roof slab which will be \nvegetated; accordingly the new building in elevation will be very similar to that shown \nin the Karr drawings \n1 \nEFTA01222250\n", "char_count": 1560}, {"efta_number": "EFTA01222235", "page_number": 16, "text_content": "NO. \n018-12 \nDate 10/14/2011 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \n45 Mars Hill, Frederlcksted, St. Croix 00840 \nCyril E. King Airport, St. Thomas 00802 \nTel: (340) 773.1082 Fax: (340) 778-4620 \nTel: (340) 774.3320 Fax: (340) 714.9632 \nPERMISSION IS HEREBY GRANTED TO:  \nTO (Construct, renair, etc):  \nConstruct New Sheds\nDescription of structure:  \nAs per Approved Plans\nLocation: \nParcel No. C Little St Jones \nApproximate cost of work:  \n$48,921.00\nPerson(s) in charge of work:  \nTBD\nREMARKS: As per 11W 2009 and VI Code Title 29 Ch.5 Code Compliance. **As per Amendment to Act \n7075, permit for the installation of solar thermal system is not required. \n7 \nFEE: $  785.63\nCom \nBlanco( Planning and Natural Rosoureas \nEFTA01222251\n", "char_count": 815}, {"efta_number": "EFTA01222235", "page_number": 17, "text_content": "No. \nDate \n08/26/2011 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \n45 Mars Hill, Frederlcksted, St. Croix 00840 \nCyril E. King Airport, St. Thomas 00802 \nTel: (340) 773-1082 Fax: (340) 778-4620 \nTel: (340) 774-3320 Fax: (340) 714-9532 \nPERMISSION IS HEREBY GRANTED TO: LSA LW \nTO (Construct, repair, etc):  Addition-Cabanna\n• \nDescription of structure  As Per Approved Plans\nLocation:  Plot \"C\" Little St James \nApproximate cost of work:  123,0\" 4°\nPerson(s) in charge of work:  TBD\nREMARKS: As per *IRC 2009 and VI Code Tide 29, Ch. S Code Compliance: ** As per amendment \nto Ad 7075, permit for the installation of solar thermal system is not required \nFEE: $  34840\nommlast \nand Natural Resourcin \nEFTA01222252\n", "char_count": 788}, {"efta_number": "EFTA01222235", "page_number": 18, "text_content": "No. \n230-09 \nBUILDING PERMIT' \nGOVERNMENT OF THE VIRGIN ISLANDS \nDate \njune I, 2009 \n— \no — \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \nCYRIL E. KING TERMINAL BUILDING. 2nd FLOOR \nFAX (340) 714.9532 \nCHARLOTTE AMALIE. ST. THOMAS. V.I. 00802 \nTEL. (340) 774-3320 \nPERMISSION IS HEREBY GRANTED TO \nTO (Conseuct. repair, etc.) \nDescription of structure: \nJeffrey Epstein \nRenovation A Addition \n8\" Blka te/ Stone Finish \nLocation: \n/Little St. James \nApproximate cost of work: $ \nA1911233.99 \nPerson(s) In charge of work: \nUndecided \n \n• • \nREMARKS: Construction shall be done in  accordance  with.  Titre \n292 of the V 7 \nBuilding Code \nFEE:  423.00 \nrreen 13u \n_WSJ, \nritorial Director \nCommissioner of Planning and Natural Resources \nEFTA01222253\n", "char_count": 771}, {"efta_number": "EFTA01222235", "page_number": 19, "text_content": "No.  BP-SIT-0265-10 \nDate 6/23/2010 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \n45 Mars Hill, Frederickstecl, St. Croix 00840 \nCyril E. King Airport, St. Thomas 00802 \nTel: (340) 773.1082 Fax: (340) 778.4620 \nTel: (340) 774-3320 Fax: (340) 714-9532 \nPERMISSION IS HEREBY GRANTED TO: * LSJ. LLC \nTO (Construct, Repair, etc.):  Kitchen Renovation and Laundry Addition \nDescription of structure:  As Per Approved Plans \nLocation: Little St. James Island \nApproximate cost of work:  $187,000.00\nPerson(s) in charge of work:  TBD\nREMARKS:  As Per IRC 2009 & VI Code Title 29 Comoliance \nFEE:  $0.00\nTernlorialYre or for Comm \nai:17 \nner of Planning and \nural Resources \nEFTA01222254\n", "char_count": 753}, {"efta_number": "EFTA01222235", "page_number": 20, "text_content": "Buildin8 Permit \nEARTH CHANGE PERMIT Na \nLOCATION: Pending, Little St. James Island \nBUILDING PERMIT NO. BP-STT-0265-10 \nDATE ISSUED: 6/23/2010 \nFT FCTRICAL PERMIT Na \nDATE ISSUED: \nPLUMBING PERMIT NO.: \nDATE ISSUED: \nEFTA01222255\n", "char_count": 231}, {"efta_number": "EFTA01222235", "page_number": 21, "text_content": "No. \n011-12 \nDate \n10/13/2011 \nBUILDING PERMIT \nGOVERNMENT OF THE VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF PERMITS \n46 Mars Hill, Fredericksted, St. Croix 00840 \nCyril E. King Airport, St. Thomas 00802 \nTel: (340) 773.1082 Fax: (340) 7784620 \nTel: (340) 774-3320 Fax: (340) 714.9632 \nPERMISSION IS HEREBY GRANTED TO: \nI-SJ, LW. \nTO (Construct, repair, etc): \nAddition-Music Room\nDescription of structure  \nAs Per Plans Submitted \nLocation:  \nLittle St James \nApproximate cost of work:  \n71,680.00 \nPerson(s) in charge of work:  TBD\nREMARKS:  As per IRC 2009 and VI Code Title 29, Ch. 5 Code Compliance: **As per Amendment to \nAct 7075, permit for the installation of solar thermal system is not required. \nFEE: $  246. 75 \nCorn \nMono \nPlanning and Natural Resources \nEFTA01222256\n", "char_count": 813}, {"efta_number": "EFTA01222235", "page_number": 22, "text_content": "GOVERNMENT OF THE. UNITED STATES VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \n8100 Lindberg Bay STE. 861 \nCYRIL E. KING AIRPORT TERMINAL 13GILDING -2ND FLOOR \nST. THOMAS, VIRGIN ISLANDS 00802 \nTEL.: (340) 774-3320 \nPERMIT TO OPERATE \nManager \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. I. 00802 \nDear Mr. Gordon: \nFAX - (340) 714-9549 \nEnclosed you will find Permit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10 \nfor the operation of the following equipment respectively: \n1. one (1) Ideal Manufacturing Fast-Way concrete hatching \nplant, model # BPL-4, serial # 8-0707467-4 and one (1) hopper, \n2. one (1) conveyor, \n3. one (1) silo scale, model # 210, serial # E08307-0131, \n4. one (1) Ideal Manufacturing Fast-Way silo, model # 54 7000, \nserial # 0207279-4, \n5. one (1) 18-bag Filter system (baghouse), \n6. one (1) Kohler gasoline fired engine, model # CH15T, serial # 3626912831, \n7. one (1) Lombardini diesel fired engine, model # 9LD 625-2, serial # 5485286, \n8. one (1) Lombardini diesel fired engine, model # 9LD 625-2, serial # 401154. \nThese pieces of equipment are located at Little St. James Island. \nThis Permit to Operate is valid for a period of three (3) years. \nBe advised that, in accordance with 12 V.I. R. & REGS. § 206-28(a) (1995), the Commissioner \nmay modify, suspend or revoke an authority to construct or permit to operate on any of the \nfollowing grounds: \n(I) \n(2) \n(3) \n(4) \nMaterially false or inaccurate statements in the application or supporting papers; \nFailure by the perrnittee to comply with any terms and conditions of the permit; \nExceeding the scope of the project as described in the application; \nNewly discovered information or significant physical changes since the permit was \nissued; and \nEFTA01222257\n", "char_count": 1827}, {"efta_number": "EFTA01222235", "page_number": 23, "text_content": "Manager \nL.S.J., LLC \nPermit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10 \nPage 2 of 5 \n(5) \nNon-compliance with any provisions of the Virgin Islands Code and Rules and \nRegulations directly related to the permitted activity. \nI. \nGENERAL CONDITIONS \nA. \nPermit to operate this source of air pollution does not relieve the L.S.J., LLC \n(\"Permittee\") of the responsibility for compliance with the provisions of any \nfederal or territorial laws, rules or regulations. \nB. \nThis permit will become valid once it is signed by the Commissioner \nor his designee. \nC. \nAn application for renewal of a Permit to Operate shall be filed by the owner or \noperator at least sixty (60) calendar days prior to the expiration of the existing \nPermit to Operate (on or before November 25, 2014), in accordance with 12 \nV.I. R. & REGS. § 206-27(b)(3) (1995). \nD. \nRevisions to this permit will not alter its effective date or expiration date. \nE. \nIf this permit is challenged by third parties, the effectiveness of the permit stands \nuntil any judicial court decides the contrary. \nF. \nIn the event of a successful challenge to any portion of this permit, all other \nportions of the permit shall remain valid and effective. \nH. \nOPERATING REQUIREMENTS \nA. \nThe equipment described above shall be operated only in accordance with the \nconditions set forth in this permit as well as the conditions described in the \napplication and supporting documentation. \nB. \nPrior to operation at any other location, the Permittee must submit a separate \napplication for a permit to operate the equipment at each new location or \nconstruction project that will be conducted on non-contiguous property. \nC. \nThe Permittee shall control process emissions, particularly during transport, \nloading and handling of raw materials on and off the plant site, to conform to \nthe requirements of 12 V.I. R. & REGS. § 204-22 (1995) regarding visible \nemissions and 12 V.I. R. & REGS. § 204-25 (1995) pertaining to fugitive \nemissi\n... [truncated, 2019 chars — for the full page use /api/corpus/document/EFTA01222235/23 or ?id=EFTA01222235&page=23]", "char_count": 2019}, {"efta_number": "EFTA01222235", "page_number": 24, "text_content": "Manager \nL.S.J., LLC \nPermit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10 \nPage 3 of 5 \nD. \nThe Permittee shall report to the Virgin Islands Department of Planning and \nNatural Resources (VIDPNR-DEP) any physical change or changes in operation \nthat increase the amount of air pollutants or process production. \nE. \nOperation of the source must not result in the contravention of any federal or \nterritorial ambient air quality standards. \nF. \nDuring operation, any source responsible for contravening ambient air quality \nstandards will be required to be modified to bring operation into compliance. \nG. \nThe Permittee shall operate the baghouse according to the manufacturer's \ninstructions and if equipped with pressure drop gauge assure that it is both \nfunctional and accurate. \nH. \nPrior to start-up of baghouse, visual inspections shall be conducted on all \nventing ducts/lines, fittings (including dust shroud), and the blower. \nIII. \nMONITORING AND RECORDKEEPING \nA. \nThe Permittee shall maintain a record of the number of hours of operation of the \nbatch plant and the emissions unit/s such as the baghouse. The number of hours \nof operation shall be recorded on a daily basis. \nB. \nThe Permittee shall maintain a record of the quantity of fuel burned (in gallons) \nby each emission unit, the raw materials used (in pounds) and concrete produced \n(in batch) by the batch plant. The quantity shall be recorded on a daily basis. \nC. \nThe Permittee shall keep a daily record of the flowrate, visual conditions of \nexhaust material, temperature, quantity of dust removal and incidents of filter \nmedia failure/replacement of the baghouse. \nD. \nBaghouse pressure and temperature gauges, flow meters and other associated \ninstruments will be checked daily for proper functioning. Any detected \nequipment failures shall be remedied as soon as possible. \nE. \nBaghouse ducts, hoods, framework and housing shall be checked daily for signs \nof wear from corrosion, erosion, excessive heat a\n... [truncated, 2218 chars — for the full page use /api/corpus/document/EFTA01222235/24 or ?id=EFTA01222235&page=24]", "char_count": 2218}, {"efta_number": "EFTA01222235", "page_number": 25, "text_content": "Manager \nL.S.J., LLC \nPermit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10 \nPage 4 of 5 \nshall be maintained on site for a minimum of five (5) years after collection and \nshall be made available to representatives of the VIDPNR-DEP upon request. \nG. \nAdditionally, the Permittee shall establish and maintain a log of all the below \noccurrences for each source; said log shall include but not be limited to the date, \ntime, cause of occurrence, and corrective action taken. The requisite log shall be \nreadily available for inspection by the VIDPNR-DEP and USEPA, and kept on \nsite for a period of no less than five (5) years. \nIV. \nREPORTING REQUIREMENTS \nA. \nThe Permittee must report by telephone, within twenty-four (24) hours, all \nscheduled maintenance or upset conditions and breakdown situations that cause \nor have caused excess emission(s) or other violations(s), spill(s), leakage(s), loss \nof material, or any violation of territorial or federal laws, rules, or regulations. \nB. \nThe Permittee must report any pre-existing or newly discovered spill or \ncontamination situation both by phone and in writing. \nC. \nThe Permittee must report to the VIDPNR-DEP via telephone and/or telefax \nimmediately upon determination, any non-compliance with operating \nrequirements directly related to emission limits, or any non-compliance with the \nconditions of this permit. The Permittee shall submit to the VIDPNR-DEP, \nwithin seven (7) days of the occurrence, a written report detailing the nature of \nthe non-compliance. The written report shall include but not be limited to the \ntime and place of the occurrence, who first reported the occurrence, amounts \nand type of material involved, corrective action taken, other agencies notified \n(who and when), any proposed mitigation, and proposed time frame for any \nmitigation. \nD. \nAny operation of the equipment which may cause off-property effects, including \nodors, shall be immediately reported to the VIDPNR-DEP by the Pennittee, in \n\n... [truncated, 2378 chars — for the full page use /api/corpus/document/EFTA01222235/25 or ?id=EFTA01222235&page=25]", "char_count": 2378}, {"efta_number": "EFTA01222235", "page_number": 26, "text_content": "EIMIN, \nManager \nL.S.J., LLC \nPermit to Operate Nos. STT-8-020-D-10 thru STT- STT-8-020-K-10 \nPage 5 of 5 \nB. \nThe VIDPNR-DEP reserves the right to inspect the Permittee's facilities. The \nPermittee shall give the VIDPNR-DEP whatever aid is necessary to perform \ninspections in a safe and timely manner. The Permittee shall keep the area clean \nwhere the generator is located. \nC. \nA person who has been granted a permit under the provisions of the 12 V.I. R. & \nREGS. § 206-20(c) (1995), shall firmly affix such Permit to Operate, an \napproved facsimile, or other approved identification bearing the permit number \nupon the article, machine, equipment, or other contrivance in such a manner as \nto be clearly visible and accessible in accordance with 12 V.I. R. & REGS. § \n206-20(d) (1995). In the event that the article, machine, equipment, or other \ncontrivance is so constructed or operated that the Permit to Operate cannot be so \nplaced, then the permit should be maintained so as to be readily available at all \ntimes on the operating premises. \nD. \nThe Permittee is required to be in compliance with 12 V.I. R. & REGS. § 206-\n27 (1995). \nYour cooperation in complying with these regulations will be most appreciated. \nSincerely, \nNadine Noorhasan, \nDirector \nNN:ACO:ao \nEnclosure: eight (8) certificates \nEFTA01222261\n", "char_count": 1326}, {"efta_number": "EFTA01222235", "page_number": 27, "text_content": "Government Of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \n0 AUTHORITY TO CONSTRUCT • PERMIT TO OPERATE \na. • Permit Renewal \nb. a New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. 1.00802 \nPermit No.: STT-8-020-D-10 \nDate: December 16, 2010 \nPhone: (340) 775-8100 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air Pollution \nControl Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of the following: one (1) one (1) Ideal Manufacturing Fast-Way concrete \nhatching plant, model # BPL-4, serial # 8-0707467-4 and one (1) hopper. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with the \nstatements and supporting data entered therein, all of which are filed with the Department and \nare considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year period \nending on: January 24, 2014. \n04 ' 1 Nadine Noorhasan, \nDirector \nEFTA01222262\n", "char_count": 1230}, {"efta_number": "EFTA01222235", "page_number": 28, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nDAUTHORITY TO CONSTRUCT \nPERMIT TO OPERATE \na. • Permit Renewal \nb. a New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V.I. 00802 \nPermit No.: STT-8-020-E-10 \nDate: December 16, 2010 \nPhone: (340) 775-8100 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 06, Sub-Section 20, this Pemdt is issued to: \nL.S.J., LLC \nFor the operation of the following: one (1) conveyor. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 011 for a three (3) year \nperiod ending on: January 24, 2014. \n'Nadine Noorhasan, \nDirector \nEFTA01222263\n", "char_count": 1110}, {"efta_number": "EFTA01222235", "page_number": 29, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nOAUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. a New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. 1.00802 \nPermit No.: STT-8-020-F -10 \nPhone: (340) 775-8100 \nDate: December 16, 2010 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of: one (1) silo scale, model # 210, serial # F08307-0131. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24, 2014. \nadine Noorhasan, \nDirector \nEFTA01222264\n", "char_count": 1136}, {"efta_number": "EFTA01222235", "page_number": 30, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \noAurHoRrry TO CONSTRUCT \n■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. a New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. 'Thomas, V. I. 00802 \nPermit No.: STT-8-020-G -10 \nDate: December 16, 2010 \nPhone: (340) 775-8100 \nPursuant to the provisions of Title 12 of the Virgin islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of: one (1) Ideal Manufacturing Fast-Way silo, model # S4 7000, \nserial # 0207279-4. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24, 2014. \nyz Nadine Noorhasan, \nDirector \nEFTA01222265\n", "char_count": 1169}, {"efta_number": "EFTA01222235", "page_number": 31, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nDAUTHORITY TO CONSTRUCT ■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. El New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. I. 00802 \nPermit No.: STT-8-020-H -10 \nPhone: (340) 775-8100 \nDate: December 16, 2010 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of: one (1) 18-bag Filter system (baghouse). \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24, 2014. \nNadine Noorhasan,Er \nDirector \nEFTA01222266\n", "char_count": 1127}, {"efta_number": "EFTA01222235", "page_number": 32, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \n❑AUTHORITY TO CONSTRUCT \n■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. o New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. I. 00802 \nPermit No.: STT-8-020-1 -10 \nPhone: (340) 775-8100 \nDate: December 16, 2010 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nLLC \nFor the operation of: one (1) Kohler gasoline fired engine, model # CH15T, serial \n# 3626912831. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24, 2014. \nNadine Noorhasan, \nDirector \nEFTA01222267\n", "char_count": 1151}, {"efta_number": "EFTA01222235", "page_number": 33, "text_content": "61 . _ \n%aka: \nGovernment of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nDAUTHORITY TO CONSTRUCT \n■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. 0 New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. I. 00802 \nPermit No.: STT-8-020-.1 -10 \nDate: December 16. 2010 \nPhone: (340) 775-8100 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of: one (1) Lombardini diesel fired engine, model # 9LD 625-2, \nserial # 5485286. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in conformity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24. 2014.\na.,- Nadine Noorhasan,\nDirector \nEFTA01222268\n", "char_count": 1181}, {"efta_number": "EFTA01222235", "page_number": 34, "text_content": "Government of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nOAUTI-IORITY TO CONSTRUCT \n■ PERMIT TO OPERATE \na. ■ Permit Renewal \nb. K New Permit \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V. I.00802 \nPermit No.: STT-8-020-K -10 \nDate: December 16, 2010 \nPhone: (340) 775-8100 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the operation of: one (1) Lombardini diesel fired engine, model # 9LD 625-2, \nserial # 401154. \nLocated at: Little St. James Island \nIn accordance with the renewal request dated: October 29, 2010 and in confonnity with \nthe statements and supporting data entered therein, all of which are filed with the \nDepartment and are considered a part of this permit. \nThis permit shall be effective from the date of: January 24, 2011 for a three (3) year \nperiod ending on: January 24, 2014. \no'\" Nadine Noorhasan, \nDirector \nEFTA01222269\n", "char_count": 1166}, {"efta_number": "EFTA01222235", "page_number": 35, "text_content": "GOVERNMENT OF THE UNITED STATES VIRGIN ISLANDS \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \n8100 Lindberg Bay STE. #6I \nCYRIL E. KING AIRPORT TERMINAL BUILDING -2ND FLOOR \nST. THOMAS, VIRGIN ISLANDS 00802 \nTEL.: (340) 774.3320 \nFAX - (340) 714-9549 \nAUTHORITY TO CONSTRUCT \nMEM, Manager \nL.S.J., LLC \n6100 Red Hook \nQuarters 13-3 \nSt. Thomas, V. I. 00802 \nDear Mr. Gordon: \nEnclosed you will find Authority to Construct #'s STT-8-020-L-10 and STT-8-020-M-\n10 respectively for the installation of: one (1) 500 kW Caterpillar diesel generator, \nmodel # LC7, serial # G7A03132, engine model # C18, serial # EST01043 (Generator \n# 1) and one (1) 500 kW Caterpillar diesel generator, model # LC7, serial # \nG7A03133, engine model # C18, serial # EST01042 (Generator # 2), for standby use \nonly. \nThese pieces of equipment are located at Little St. James Island, V.I. \nThis Authority to Construct Permit is valid for a period of one (1) year. \nBe advised that, in accordance with 12 V.I. R. & REGS. § 206-28(a) (1995), the \nCommissioner may modify, suspend or revoke an authority to construct or permit to \noperate on any of the following grounds: \nMaterially false or inaccurate statements in the application or supporting papers; \nFailure by the Perrnittee to comply with any terms and conditions of the permit; \nExceeding the scope of the project as described in the application; \nNewly discovered information or significant physical changes since the permit \nwas issued; and \nNon-compliance with any provisions of the Virgin Islands Code and Rules and \nRegulations directly related to the permitted activity. \nThis Authority to Construct Permit is not a Permit to Operate. This is a permit to \nconstruct only. \nEFTA01222270\n", "char_count": 1762}, {"efta_number": "EFTA01222235", "page_number": 36, "text_content": ", Manager \nL.S.J., LLC \nAuthority to Construct #'s STT-8-020-L-10 and STT-8-020-M-10 \nPage 2 of 6 \nAuthority to construct or operate this source does not relieve L.S.J., LLC (\"the \nPermittee\") of the responsibility of compliance with the provisions of any federal, \nterritorial laws, rules or regulations. [12 V.I. R. & REGS. § 206-26(a)(I) (1995)] \nThis source shall operate as a minor source and is subject to 40 Code of Federal \nRegulations (CFR), Part 60, Subpart IIII, \"Performance Standards for Stationary \nCompression-Ignition of Internal Combustion Engines\". \nA. Operating Requirements \nI. The pieces of equipment described above shall be constructed and \noperated only in accordance with the conditions set forth in this permit as \nwell as the conditions described in the application, manufacturer's \nspecifications and other supporting documentation. [49O712.60.4211, \n12V.I.R.& R §206-26(d)(2) (1995), 12V.I.R.& R §206-27(c)(2)] \n2. Prior to operation at any other location, the Permittee must submit a \nseparate application for an authority to construct and permit to operate the \nequipment at each new location or construction project that will be \nconducted on non-contiguous property.[ 12V.I.R.& R §206-21(a)(1995)] \n3. The Permittee shall operate the emission units with the given limitations \ndescribed below: \nUnit # \nPermit \n# \nUnit Description \nFuel \n'Type \nFuel \nUsage \nYearly \nfuel usage \nNo. of \nhours of \noperation \nEmission \nstandards \nH0CER60.4202, \n40CPR89.112] \n(gram/hp-hr) \nGenerator STT-8- \n500 kW Caterpillar \nDiesel H \n28.5 \n3562.5 \n125 \n# I \n020-L- \n10 \ndiesel generator, \nmodel # LC7, serial \n2 \ng/hr \ngal \nhrs/year \nCO \n2.6 \n# G7A03132, engine \nmodel # C18, serial /I \nNOx+ \nNMHC 3.0 \nEST01043 \nGenerator \nSTT-8- \n500 kW Caterpillar \nDiesel # \n28.5 \n3562.5 \n125hrs/year \n# 2 \n020-M- \n10 \ndiesel generator, \nmodel # LC7, serial \n2 \nWhr \ngal \nSOx \n3.67 \n# G7A03133, engine \nmodel # CIS, serial # \nEST01042 \nPM \n0.15 \nEFTA01222271\n", "char_count": 1964}, {"efta_number": "EFTA01222235", "page_number": 37, "text_content": "MEM Manager \nL.S.J., LLC \nAuthority to Construct #'s STT-8-020-L-10 and S1T-8-020-M-10 \nPage 3 of 6 \n4. Construction and operation of the source must not result in the \ncontravention of any federal or territorial ambient air quality standards. \n[12V.I.R.& R §206-26(a)(2); 12V.I.R.& R §206-27(a)(1)(B)] \n5. The Permittee shall operate the generator (emission unit) for standby use \nonly. The use of the generator for prime power is prohibited. \n[40CFR60.4211(e)] \n6. The Permittee shall install and maintain a non-resettable hour meter to \nindicate the hours of operation of the engine. [40CFR60.4209(a)] \n7. The Permittee shall limit the use of the stand-by generator to no more than \nfive hundred (500) hours of operation on a 365-day rolling average. \n8. \nThe Permittee shall use a continuous operational fuel flow device to \nmonitor the fuel consumption. \n9. \nThe Permittee shall use diesel oil with Sulfur content of 15 parts per \nmillion (ppm) maximum. [40CFR80.510(b)] \n10. The Permittee shall not emit any air contaminant that causes an opacity of \nmore than twenty percent (20%) except during start up. [ 12V.I.R.& R \n§204-28(b)(i) (1995)] \n11. The Permittee shall operate the emission unit and maintain the achieved \nemission standards over the entire life of the engine. [40CFR60.4206] \n12. The Permittee shall install a backpressure monitor if the engine is \nequipped with a diesel particulate filter. \nB. Monitoring and Recordkeeping \nI. The Permittee shall maintain a logbook for each generator recorded on a \nmonthly \nbasis \nindicating \nbut \nnot \nlimited \nto \nthe \nfollowing \ninformation:[40CFR60.4214(b)] \na. date, time and number of hours of operation of the generator (emission \nunit) \nb. the reason for the operation of the generator such as power failure, \nstart up, maintenance conducted, etc. \nEFTA01222272\n", "char_count": 1829}, {"efta_number": "EFTA01222235", "page_number": 38, "text_content": "Manager \nL.S.J., LLC \nAuthority to Construct It's STT-8-020-L-10 and STT-8-020-M-10 \nPage 4 of 6 \nc. quantity (in gallons) of fuel burned by the emission unit during \nthe operation \nd. any malfunction of the emission unit, date, time, duration of \noccurrence and corrective action taken \n2. The Permittee shall retain fuel purchase records that account for all fuel \nused in the generator and all fuel purchased for use in the emission unit. \n3. All records required to be kept as part of this Permit shall be entered in \nindelible ink in a permanently bound logbook with pre-numbered pages. \nThe logbook shall be maintained on site for a minimum of five (5) years \nafter collection and shall be made available to representatives of the \nVIDPNR-DEP and USEPA upon request. \n4. The Permittee shall maintain records of the sulfur content of the fuel oil \nreceived through the Supplier's Invoice with the attached Certificate of \nanalyses performed. \n5. The Permittee shall keep records of corrective action taken after the \nbackpressure monitor has notified the Permittee that the high backpressure \nlimit of the engine is approached if the engine is equipped with a diesel \nparticulate filter. \nC. Reporting Requirements \n1. The Permittee must report by telephone, within twenty-four (24) hours, all \nscheduled maintenance or upset conditions and breakdown situations that \ncause or have caused excess emission(s) or other violations(s), spill(s), \nleakage(s), loss of material, or any violation of territorial or federal laws, \nrules, or regulations. \n2. The Permittee must report any pre-existing or newly discovered spill or \ncontamination situation both by phone and in writing. \n3. The Permittee must report to the VIDPNR-DEP via telephone and/or \ntelefax immediately upon determination, any non-compliance with \noperating requirements directly related to emission limits, or any non-\ncompliance with the conditions of this permit. The Permittee shall submit \nEFTA01222273\n", "char_count": 1977}, {"efta_number": "EFTA01222235", "page_number": 39, "text_content": "Manager \nL.S.J., LLC \nAuthority to Construct #'s STT-8-020-L-10 and STT-8-020-M-10 \nPage 5 of 6 \nto the VIDPNR-DEP, within seven (7) days of the occurrence, a written \nreport detailing the nature of the non-compliance. The written report shall \ninclude but not be limited to the time and place of the occurrence, who \nfirst reported the occurrence, amounts and type of material involved, \ncorrective action taken, other agencies notified (who and when), any \nproposed mitigation, and proposed time frame for any mitigation. \n4. Any operation of the equipment which may cause off-property effects, \nincluding odors, shall be immediately reported to the VIDPNR-DEP by \nthe Permittee, in writing and by phone. \n5. The Permittee must report to the Virgin Islands Department of Planning \nand Natural Resources (VIDPNR-DEP) any physical change or changes in \nconstruction and operation that increase the amount of air pollutants or \nprocess production. \n6. The Permittee shall submit an annual report of the fuel consumption. \n7. These reporting requirements in no way relieve the Permittee of any other \nreporting requirements for the above mentioned occurrences. \nD. Other Requirements \n1. As a condition of this Permit, the Permittee shall comply with all terms and \nconditions of any Administrative Order related to any violation of \nconditions of this Permit. \n2. The VIDPNR-DEP reserves the right to inspect the Permittee's facilities. \nThe Permittee shall give the VIDPNR-DEP whatever aid is necessary to \nperform inspections without delay in a safe manner. The Permittee shall \nkeep the area clean where the generator is located. \n3. A person who has been granted a permit under the provisions of the 12 \nV.I. R. & REGS. § 206-20(a) and (c) (1995), shall firmly affix such \nAuthority to Construct permit and Permit to Operate, an approved \nfacsimile, or other approved identification bearing the permit number upon \nthe article, machine, equipment, or other contrivance in such a manner as \nto be c\n... [truncated, 2076 chars — for the full page use /api/corpus/document/EFTA01222235/39 or ?id=EFTA01222235&page=39]", "char_count": 2076}, {"efta_number": "EFTA01222235", "page_number": 40, "text_content": "Ma\nManager \nLLC \nAuthority to Construct /Ps STT-8-020-L-10 and STT-8-020-M-10 \nPage 6 of 6 \nREGS.§ 206-20(d) (1995). In the event that the article, machine, \nequipment, or other contrivance is so constructed or operated that the \nPermit to Operate cannot be so placed, then the permit should be \nmaintained so as to be readily available at all times on the construction \nand operating premises. \n4. The Permittee is required to be in compliance with 12 V.I. R. & REGS. § \n206-26 and 12 V.I. R. & REGS. § 206-27 (1995). \nYour cooperation in complying with these regulations will be most appreciated. \nSincerely, \nNadine Noorhasan, \nDirector, DEP \nNN:ACO:ao \nEnclosure: two (2) certificates \nEFTA01222275\n", "char_count": 703}, {"efta_number": "EFTA01222235", "page_number": 41, "text_content": "Government Of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \n■ AUTHORITY TO CONSTRUCT K PERMIT TO OPERATE \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. Thomas, V.I. 00802 \nPermit No.: STT-8-020-M-10 \nDate: December 16. 2010 \nPhone: (340) 513-9855 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the construction of the following: one (1) 500 kW Caterpillar diesel generator, \nmodel # LC7, serial # G7A03133, engine model # C18, serial # EST01042 (Generator \n# 2), for standby use only. \nLocated at: Little St. James Island \nIn accordance with the application dated: October 29, 2010 and in conformity with the \nstatements and supporting data entered therein, all of which are filed with the Department \nand arc considered a part of this permit. \nThis permit shall be effective from the date of: December 16. 2010 \n for a one (1) \nyear period ending on: December \nNadine Noorhasan, \npi-, Director \nEFTA01222276\n", "char_count": 1210}, {"efta_number": "EFTA01222235", "page_number": 42, "text_content": "Government Of \nThe Virgin Islands of the United States \nDEPARTMENT OF PLANNING & NATURAL RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nCharlotte Amalie, St. Thomas, Virgin Islands \nAIR POLLUTION CONTROL \nII AUTHORITY TO CONSTRUCT \nPERMIT TO OPERATE \nFor: \nL.S.J., LLC \n6100 Red Hook \nQuarters B-3 \nSt. homas, v. . 00802 \nPermit No.: STT-8-020-L-10 \nPhone: (340) 513-9855 \nDate: December 16, 2010 \nPursuant to the provisions of Title 12 of the Virgin Islands Rules and Regulations Air \nPollution Control Act Chapter 9, Section 206, Sub-Section 20, this Permit is issued to: \nL.S.J., LLC \nFor the construction of the following: one (1) 500 kW Caterpillar diesel generator, model \n# LC7, serial # G7A03132, engine model # C18, serial # EST01043 (Generator # 1), for \nstandby use only. \nLocated at: Little St. James Island \nIn accordance with the application dated: October 29 2010 and th conformity with the \nstatements and supporting data entered therein, all of which are filed with the Department \nand are considered a part of this permit. \nThis permit shall be effective from the date Of:  December 16. 2010 \n for a one (I) \nyear period ending on: December 16. 2011  . \nNadine oorhasan, \nDirector \nEFTA01222277\n", "char_count": 1215}, {"efta_number": "EFTA01222235", "page_number": 43, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES \nDEPARTMENT OF PLANNING AND NATURAL. RESOURCES \nDIVISION OF ENVIRONMENTAL PROTECTION \nfu ll) Linillm•rg III:4y. Sic W; I \n'yril E. King Ammo Tc.rminal mummy s.,„,„,i \nTIII.IMAS. VI I KIWI: \nlc 'NE CHID) 77•I.3:120. PAN• Gi ic4 it i.lif. it) \nThis Territorial Pollutant Discharge Elimination System (TPDES) permit is issued in compliance with 12 V.I. CODE \nANN. § 185 in accordance with the provisions of the Federal Water Pollution Control Act, as amended, (33 USC 1251 et \nseq.) (hereinafter referred to as The Act\"). \nLITTLE ST. JAMES (herein referred to as the Permittee) \nLittle St. James Nang VI 00902 \nThe Permittee is authorized to discharge from a facility located at\n to the receiving waters listed in the \ntable below, in accordance with effluent limitations and monitoring requirements and other conditions set forth in in\n I \nand U hereof, including the collection system(s) outfalls. \nBEST PROFESSIONAL \nJUDGMENT (BPJ) \nCATEGORY - RL.L. \nCONDOMINIUMS/NOTES/RESORTS/MARINAS \n(STT-STJ) \nLittle St. James Subwatershed \nR/O \nMINOR TPDES Permit \nTPDES Permit No. \nVI0040525 \nWastewater Process \nand/or Product \nDaily \nMaximum \nMonthly \nAverage \nDisinfection Type \nRECEIVING WATER \n001 FLOW (MGD) \nReverse Osmosis Brine \n0.3 \n0.3 \nNA \nDrainage System \nDate Original Application Received: 3/11/11 \nTPDES Permit Administrator \nProgram Manager Approval: \nActing Director Approval: \nDavid Alvaro Sirs\" \nRhonda L Glued, \n- Ltte \nProgarn Manager \nDate Completed Application Received: 7/29/11 \nDate: j_01.a/j/_ \nDate: ith.d/_li \nDate:a) ge)/A \nThis permit shall \nme effective on November I, 2011 and authorization to din:barge expires October 31, 2016 with a \n6 \nAlicia V. \nCommissioner \n/4,O4511\nDate \nEFTA01222278\n", "char_count": 1770}, {"efta_number": "EFTA01222235", "page_number": 44, "text_content": "R/O-FtLL \nPage 2 \nPart 1 \nDuring the period beginning on the effective date of the permit and lasting through the expiration date of the permit, the \nPennittee is authorized to discharge from outfall number 001 (reverse osmosis brine). Such discharges shall be limited \nand monitored by this Pamittee as specified below: \nReceiving Water Chnsificadon: B (BPJ) \nTable IA: REQUIRED EFFLUENT LIMITATIONS AND MONITORING \nEffluent \nCharacteristic \n(parameter) \nEffluent Concentration Limitations \nMonitoring Requirements \nMaximum \nDaily Limit \nPercent \nRemoval \nAverage \nMonthly Limit Location \nSample \nFrequency \nSample Type \n001 FLOW \n(MGD) \n0.3 \nN/A \n0.3 \nEffluent \nContinuous \nContinuous \nTemp (t) \n32 \nN/A \nN/A \nEffluent \nWEEKLY \nGrab \nPR \n7 to 8.3 \nN/A \nN/A \nEffluent \nWEEKLY \nGrab \nSalinity (mg/1) \nREPORT \nN/A \nN/A \nEffluent \nQUARTERLY \nGrab \nTotal Dissolved \nSolids (m8/1) \nREPORT \nN/A \nN/A \nEffluent \nQUARTERLY \nGrab \noiia Grease \nREPORT \nN/A \nN/A \nEffluent \nANNUALLY \nGrab \nSamples collected in compliance with the monitoring requirements specified in 'Bible 1A shall be taken at any point after \nthe treatment process has commenced but prior to being discharged into the receiving waters. Compliance sampling \npoints must be labeled. \nDISCHARGE MONITORING REPORTS MUST BE SUBMITTED ON A MONTHLY \nBASIS. \nEFTA01222279\n", "char_count": 1324}, {"efta_number": "EFTA01222235", "page_number": 45, "text_content": "SPECIAL CONDITIONS - R/O-RLL \nPage 3 \nPart I \nSpecial conditions arc hereby incorporated into this permit in order to satisfy the provisions Title 12 of the Virgin Islands \nCode, Chapter 7, Section 185 (f) (1981), and Section 301 (b) (1) (C) of the Federal Clean Water Act (PL 95-217). As \npart of the administration of the Territorial Pollutant Discharge Elimination System (TPDES), the TPDES Permit \nAdministrator is the primary permit writer. Further, a TPDES Permit Compliance Evaluation Inspector (TPDES CEI \nInspector) will conduct routine and follow-up inspections for this facility and report subsequent findings to the U.S. \nEnvironmental Protection Agency (EPA) and the TPDES Permit Administrator. The TPDES Permit Administrator and \nCEI Inspector are the authorized twicamtatives of the Commissioner of DPNR for the sole purpose of insuring the \nfollowing special conditions: \nI. \nThis permit is for a five year period. Within that period, the Pertain= is required to report any management \nchanges by submitting an updated EPA Form I. An annual re-certification must be performed if there are any \nmanagement changes at the pet:minces facility. This annual re-certification must occur thirty (30) days prior to the \nanniversary of the effective date of the permit and on the same date each year by submitting an updated EPA Form I. \nThe EPA Form 1 must be accompanied by a cover letter on official stationary, addressed to the TPDES Permit \nAdministrator, certifying that it's current general manager, director of engineering, condominium association president \nand/or certified plant operator have read and understood all parts and special conditions of this permit (see Part II (B) II \n(a) & (c) for \"Signatory requirements\"). Certification Letters serve to inform the Division of Environmental Protection \n(DEP) of any changes in management DEP must be informed of any interim management changes or changes in the \nplant operator. \nThe Permittee has a \"Duty to Comply\" subject to fines\n... [truncated, 4459 chars — for the full page use /api/corpus/document/EFTA01222235/45 or ?id=EFTA01222235&page=45]", "char_count": 4459}, {"efta_number": "EFTA01222235", "page_number": 46, "text_content": "Page 4 \nPart I \n3. \nThis permit may be transferred to a new owner if the current Permittee notifies the TPDES Permit Administrator, \nthirty (30) days prior to the transfer date of its intent The notification must contain a cover letter on official stationary, \nwith a copy of the written agreement between the old and new owner on the terms of the transfer (operational control, \nresponsibility, coverage and liability), along with EPA Form I competed by the new owner. This is subject to DPNR \nCommissioner's modification or revocation of the permit, pursuant to 40 CFR 122.63 (d). The new owners must also \nindependently certify that they have read and understood the permit and all special conditions. In the case of foreclosure, \nDPNR-DEP does not establish ownership. \n4. \nIn the event of leaks, spills or overflows at this permitted facility, the following individuals must be included in \nany and all notifications: \nWayne Donadelle, Environmental Specialist I, TPDES CEI Inspector at 774-3320 extension 5156, \nRhonda L. Liburd, Environmental Specialist Ile TPDES Permit Administrator at eid 5188, and \nlira Casey, EPA/CEPD, VI Coordinator at 714-2333. \nEFTA01222281\n", "char_count": 1174}, {"efta_number": "EFTA01222235", "page_number": 47, "text_content": "Pagc 5 \nPart Il \nB. \nMONITORING AND REPORTING REQUIREMENTS \nI. \nMonitoring and records. See Part II.B.10. \n2. \nDischarge Monitoring Reverts (DMPJ. \na. \nSec Pan II.B.12.d. \nb. \nMonitoring results obtained during the previous month shall be summarized and reported on a \nDischarge Monitoring Report Form (EPA No. 3320_1), postmarked no later than the 28th day \nof the month following the completed reporting period. The first report is due on the effective \ndate of the permit (EDP) +28 days. The permittee shall sign and certify all DMRs, and all \nother reports, in accordance with the requirements of Pan 1lb of this permit (\"Signatory \nRequirements\"). The permittee shall submit legible originals of these documents to DPNR, \nwith copies to EPA at the following addresses: \nRegional Administrator \nUSEPA Region II \n290 Broadway \nNew York, NY 10007-1866 \nAtt n: Permits Admin. Branch \nGovernment of the U.S. Virgin Islands \nDept. of Planning & Natural Resources \nOffice of the Commissioner \nDivision of Environmental Protection \nWater Pollution Control Program \n8100 Lindberg Bay, Ste. 61 \nCyril E. King Airport, Terminal Building, r l Floor \nSt. Thomas, VI 00802 \n3. \nQuality assurance practices. The Permittee is required to show the validity of all data by requiring \nits laboratory to adhere to the following minimum quality assurance practices: \na. \nDuplicate' and spiked2 samples must be run for each constituent analyzed for permit \ncompliance on 5% of the samples, or at least on one (I) sample per month, whichever is \ngreater. If analysis frequency is less than one (1) sample per month, duplicate and spiked \nsamples must be run for each analysis. \nb. \nFor spiked samples, a known amount of each constituent is to be added to the discharge \nsample. The amount of constituent added should be approximately the same amount \npresent in the unspiked sample, or must be approximately that stated as maximum or \naverage in the discharge permit \nc. \nThe data obtained in 3. a above shall be summa\n... [truncated, 2950 chars — for the full page use /api/corpus/document/EFTA01222235/47 or ?id=EFTA01222235&page=47]", "char_count": 2950}, {"efta_number": "EFTA01222235", "page_number": 48, "text_content": "Page 6 \nPart II \ne. \nPercent recovery for each parameter shall be calculated by the formula R = 100 (F IYA, \nwhere \"F\" is the analytical result of the spiked sample, and \"I\" is the result before spiking \nthe sample, and \"A\" is the amount of constituent added to the sample. \n1. \nThe percent recovery,\" R\", for each parameter in 3. e. above shall be summarized yearly \nin terms of nil percent recovery and standard deviation from the mean. The formula, s \n= f0(x_0)2/ \n)1\"2, where \"s\" is the standard deviation around the mean \"0\", \"x\" is an \nindividual recovery value, and \"n\" is the number of data points which shall be applied. \ng \nThe Permittee or his contract laboratory is required to annually analyze an external \nquality control reference sample for each pollutant. These are available through the \nRegional Quality Assurance Coordinator, Region II, U.S. Environmental Protection \nAgency, Edison Environmental Laboratory, Edison, New Jersey 08817. \nh. \nThe Permittee and/or his contract laboratory is required to maintain records of the \nspecific analytical methods used, including options employed, if any, within a particular \nmethod, and of reagent standardization and equipment calibration operations. \ni. \nIf a contract laboratory is utilized, the Permittee shall submit the name and address of the \nlaboratory and the parameters analyzed at the time it submits its discharge monitoring \nreports (see Section 8.2.b. above). Any change in the contract laboratory being used or \nthe parameters analyzed shall be reported prior to or together with the monitoring report \ncovering the period during which the change was made. \nOTHER REQUIREMENTS \n1. \nN/A. \n2. \nN/A. \na. \nN/A. \n3. \nN/A. \n4. \nAlterations There are material and substantial changes or additions to the permitted facility or \nactivity which occurred after permit issuance which justify the application of permit conditions \nthat are different or absent in the existing permit. \n5. \nMQPitiVinft \na. \nN/A. \nb. \nN/A. \nc. \nN/A. \n6. \n\n... [truncated, 2278 chars — for the full page use /api/corpus/document/EFTA01222235/48 or ?id=EFTA01222235&page=48]", "char_count": 2278}, {"efta_number": "EFTA01222235", "page_number": 49, "text_content": "Page 7 \nPart 11 \nAdditional mooning requirements. The Permittee shall notify the Regional Administrator and \nCommissioner as soon as it knows or has reason to believe: \na. \nThat any activity has occurred or will occur which would result in the discharge, on a \nroutine or frequent basis, of any toxic pollutant which is not limited in the permit, if that \ndischarge will exceed the highest of the following \"notification levels\": \n(1) \nOne hundred micrograms per liter (100 02/1); or \n(2) \nTwo hundred micrograms pa liter (200 0g/l) for acrolein and acrylonitrile; five \nhundred micrograms per liter (500 0g/1) for 2,4_dinitrophenol and for \n2_methyl_4,6_dinitrophenol; and one milligram per liter (I mg/I) for antimony; \nor \n(3) \nFive (5) times the maximum concentration value reported for that pollutant in \nthe permit application; or \n(4) \nThe notification level, if any, established by the Commissioner in the permit. \nb. \nThat any activity has occurred or will occur which would result in any discharge, on a \nnon routine or infrequent basis, of a toxic pollutant which is not limited in the permit, if \nthat discharge will exceed the highest of the following 'notification levels\": \n(I) \nFive hundred micrograms politer (500 0O); or \n(2) \nOne milligram per liter 0 mg/I) for antimony; or \n(3) \nTen (10) times the maximum concentration value reported for that pollutant in \nthe permit application; or \n(4) \nThe notification level, if any, established by the Commissioner in the permit. \nc. \nCompliance Schedule'. N/A \nEFTA01222284\n", "char_count": 1536}, {"efta_number": "EFTA01222235", "page_number": 50, "text_content": "Page \nPart II \nDEFINITIONS \nI. \n\"Average monthly discharge limitation\" means the highest allowable average of \"daily discharge? \nover a calendar month, calculated as the sum of all daily discharges measured during a calendar \nmonth divided by the number of daily discharges measured during that month. \n2. \n\"Average weekly discharge limitations\" means the highest allowable average of \"daily discharge? \nover a calendar week, calculated as the sum of all daily discharges measured during a calendar \nweek divided by the number of daily discharges measured during that week. \n3. \n\"Bypass\" means the intentional diversion of wastes from any portion of a treatment facility. \n4. \n\"Composite\" means a combination of individual (or continuously taken) samples obtained at \nregular intervals over the entire discharge day. The volume of each sample shall be proportional \nto the discharge flow rate. For a continuous discharge, a minimum of twenty-four (24) individual \ngrab samples (at hourly intervals) shall be collected and combined to constitute a 24hour \ncomposite sample. For intermittent discharges of more than four (4) hours duration, grab samples \nshall be taken at a minimum of thirty (30) minute intervals. \n5. \n\"Commissioner\" means the Commissioner of the Department of Planning and Natural Resources \nor his duly authorized representative. \n6. \n\"Daily discharge` means the discharge of a pollutant measured during a calendar day or any \n24_hour period that reasonably represents the calendar day for purposes of sampling. For \npollutants with limitations expressed in units of mass, the \"daily discharge\" is calculated as the \ntotal mass of the pollutant discharge over the day. For pollutants with limitations expressed in \nother units of measurement, the \"daily discharge' is calculated as the average measurement of \npollutant over the day. For purposes of sampling, \"daily\" means an operating day or 24_hour \nperiod. \n7. \n\"Discharge Monitoring Report\" or \"DMR\" means the EPA uniform nati\n... [truncated, 3022 chars — for the full page use /api/corpus/document/EFTA01222235/50 or ?id=EFTA01222235&page=50]", "char_count": 3022}, {"efta_number": "EFTA01222235", "page_number": 51, "text_content": "Page 9 \nPart II \nb. \nIn cases where the surface water body intake source is pretreated for the removal of \npollutants, the intake level of a pollutant to be used in calculating the net is that level \ncontained after the pretreatment steps. \n13. \n\"Regional Administrator\" means the Regional Administrator of Region II of EPA or the \nauthorized representative of the Regional Administrator. \n14. \n\"Severe property damage\" means that substantial physical damage to the treatment facilities which \nwould cause them to become inoperable or substantial and permanent loss of natural resources \nwhich can reasonably be expected to occur in the absence of a bypass. Severe property damage \ndoes not mean economic loss caused by delays in production. \n15. \n\"Toxic pollutant\" means any of the pollutants listed in 40 C.F.R. 401.15 (45 F.R. 44503, July 30, \n1979) and any modification to that list in accordance with Section 307(aX1) of the Clean Water \nAct. \n16. \n\"Upset\" means an exceptional incident in which there is unintentional and temporary \nnoncompliance with technology_based effluent limitations because of factors \nbeyond the reasonable control of the Permittee. An upset dots not include noncompliance to the \nextent caused by operational error, improperly designed treatment facilities, inadequate treatment \nfacilities, lack of preventive maintenance, or careless or improper operation. \n17. \n\"Weekly\" means every seventh day (the same day of each week) and a normal operating day. \n18. \n\"TPDES Permit Administrator\" means the author of this permit \nEFTA01222286\n", "char_count": 1567}, {"efta_number": "EFTA01222235", "page_number": 52, "text_content": "Page 10 \nPond \nB. \nGENERAL CONDMONS \nDuty to Comply \na. \nThe Permittee must comply with all conditions of this permit Any permit \nnoncompliance constitutes a violation of the Environmental Laws and Regulations of the \nVirgin Islands and Federal Clean Water Act and is ground for enforcement action; for \npermit terntination, revocation and reissuance, or modification; or the denial of a permit \nrenewal application. \nb. \nThe Permittee shall comply with effluent standards or prohibitions established under \nSection 307(a) of the Federal Clean Water Act for toxic pollutants within the time \nprovided in the regulations that establish these standards or prohibitions, even if the \npermit has not been modified to incorporate the requirement. \nc. \n( I) \nTide 12, Section 190 of the Virgin Islands Code, Water Pollution Control Act \nprovides that any person who violates any permit condition is subject to a civil \npenalty not to exceed 550,000 per day of violation. Any person who willfully or \nnegligently discharges pollutants in violation of any condition or limitation \nincluded in a permit; or violates requirements of 12 V.I.C. Section 189; or with \nrespect to introductions of pollutants into publicly owned treatment works, \nviolates a pretreatment standard or toxic effluent standard, shall upon \nconviction, be punished by a fine not less than $5,000 per day of violation. If \nthe conviction is for a violation committed after a first conviction of the person \nunder this subsection, punishment is by a fine of not more than 5100,000 per day \nof violation. Any person who knowingly makes any \nfalse statements, representation or certification in any application, record, \nreport, plan or other documents filed or required to be maintains under this \nchapter or by any permit, rule, regulation or order issued under the Act, or who \nfalsifies, tampers with or knowingly readers inaccurate any monitoring device or \nmethod required to be maintained under the Act, shall upon conviction, be \npu\n... [truncated, 3274 chars — for the full page use /api/corpus/document/EFTA01222235/52 or ?id=EFTA01222235&page=52]", "char_count": 3274}, {"efta_number": "EFTA01222235", "page_number": 53, "text_content": "Page I I \nPart II \n5. \nProver Operation and Maintenance. The Fermium shall at all times properly operate and maintain \nall facilities and systems of treatment and control (and related appurtenances) which are installed \nor used by the Pennittee to achieve compliance with the conditions of this permit. Proper \noperation and maintenance also includes adequate laboratory controls and appropriate quality \nassurance procedures. This provision requires the operation of backup or auxiliary facilities or \nsimilar systems, installed by the Permittee, when the operation is necessary to achieve compliance \nwith the conditions of the permit. \n6. \nPermit Actions. \na. \nThis permit may be modified, revoked and. reissued, or terminated during its term for \ncause. The filing of a request by the Permittee for a permit modification, revocation and \nreissuance, or termination, or a notification of planned changes or anticipated \nnoncompliance, does not stay any permit condition. \nb. \nCauses for modification, revocation and reissuance, and termination are set forth in 40 \nC.F.R. 122.62 and 122.64, and 185(i) and 12 V.I.R.&R. Subsection 184_34(O and \n184_51. \n(1) \nSpecified causes for modification, revocation and reissuance, and termination \ninclude: \n(a) \nNoncompliance by the Pemititee with any condition of the permit; \n(b) \nThe Permittee's failure in the application or during the permit issuance \nprocess to disclose fully all relevant facts, or the Permittee's \nmisrepresentation of any relevant facts at any time; \n(c) \nA determination that the permitted discharge endangers human health \nor the environment and can only be regulated to acceptable levels by \npermit modification or termination; or \n(d) \nThere is a change in any condition that requires either a temporary or a \npermanent reduction or elimination of any discharge controlled by the \npermit. \n(2) \nSpecified causes for modification and, upon request or agreement of the \nFerrante°, revocation and reissuance of the permit include \n... [truncated, 2917 chars — for the full page use /api/corpus/document/EFTA01222235/53 or ?id=EFTA01222235&page=53]", "char_count": 2917}, {"efta_number": "EFTA01222235", "page_number": 54, "text_content": "Page 12 \nPart ll \n7. \nProperty rights. The issuance of this permit does not convey any property rights or any exclusive \nprivileges, nor does it authorize any injury to persons or property or invasion of other private \nrights, or any infringement of Virgin Islands laws or regulations. \n8. \nDuty to provide information The Permittee shall furnish to the Commissioner within a reasonable \ntime, any information which the Commissioner may request to determine whether cause exists for \nmodifying, revoking and reissuing, or terminating this permit or to determine compliance with \nthis permit. The Permittee shall also furnish to the Commissioner, upon request, copies of records \nrequired to be kept by this permit. \n9. \nInspection and Entry. The Perrnittee shall allow the Regional Administrator, the Commissioner, \nor any other authorized representative(s), upon the presentation of credentials and other documents \nas may be required by law, to: \na. \nEnter upon the Pennittee's premises where a regulated facility or activity is located or \nconducted, or where records must be kept under the conditions of this permit; \nb. \nHave access to and copy, at reasonable times, any records that must be kept under the \nconditions of this permit; \nc. \nInspect at reasonable times any facilities, equipment(including monitoring and control \nequipment), practices, or operations regulated or required under this permit and \nd. \nSample or monitor at reasonable times, for the purposes of assuring permit compliance or \nas otherwise authorized by the Environmental Laws and Regulations of the Virgin Islands \nand the Clean Water Act, any substances or parameters at any location. \n10. \nmcingS. \na. \nSamples and measurements taken for the purpose of monitoring shall be representative of \nthe monitored activity. \nb. \nThe Permittee shall retain records of all monitoring information, including all calibration \nand maintenance records and all original strip chart recordings for continuous monitoring \ninstrument\n... [truncated, 2879 chars — for the full page use /api/corpus/document/EFTA01222235/54 or ?id=EFTA01222235&page=54]", "char_count": 2879}, {"efta_number": "EFTA01222235", "page_number": 55, "text_content": "Page 13 \nPan K \nc. \nThe Clean Water Act provides that any person who knowingly makes any false \nstatement, representation, or certification in any record or other document submitted or \nrequired to be maintained under this permit, including monitoring reports or reports of \ncompliance or noncompliance shall upon conviction, under the Virgin Islands Water \nPollution Control Act be punished by a fine of not more than S10,000, or by \nimprisonment for not more than six (6) months, or by both, or under the Clean Water Act \nbe fined not more than S10,000 or imprisoned for not more than two (2) years. \n11. \nSianatory reattirements \na. \nAll permit applications shall be signed as follows: \n(1) \nFor a municipality, State, Federal or other public agency, by either a principal \nexecutive officer or ranking elected official, or other duly authorized employee. \n(2) \nIn any other case, by the individual duly authorized to act, as evidenced by \ndocumentation acceptable to the Commissioner. \nb. \nAll reports required by this permit, and other information requested by the Regional \nAdministrator or Commissioner of DPNR pursuant to the terms of this permit, including \nDMRs and reports of noncompliance, shall be signed as follows: \n(1) \nBy a person described in subsection a, or by a duly authorized representative of \nthat person. \n(2) \nA person is a duly authorized representative only if: \n(a) \nThe authorization is made in writing by a person described in \nsubsection a.; \n(b) \nThe authorization specifies either an individual or a position having \nresponsibility for the overall operation of the regulated facility or \nactivity such \nas the position of plant manager, operator of a well or well field, \nsuperintendent, position of equivalent responsibility, or an individual or \nposition having overall responsibility for environmental matters for the \ncompany. \n(c) \nThe written authorization is submitted to the: \nRegional Administrator, as noted in Part I., section R. \n(3) \nIf a written autho\n... [truncated, 2429 chars — for the full page use /api/corpus/document/EFTA01222235/55 or ?id=EFTA01222235&page=55]", "char_count": 2429}, {"efta_number": "EFTA01222235", "page_number": 56, "text_content": "Page I4 \nPart Ii \nc. \nCertification. Any person signing a document under subsection a. orb. shall make the \nfollowing certification: \n\"I certify under penalry of the law that this document and all attachments were prepared \nunder my direction or supervision in accordance with a system designed to assure that \nqualified personnel properly gather and evaluate the information submitted Based on my \ninquiry of the person or persons who manage the system, or those persons cllrectty \nresponsible for gathering the information, the information submitted is. to the best of my \nknowledge and belief true, accurate and complete. I am aware that there are significant \npenalties for submitting false information, including the possibility offine and \nimprisonment for knowing violations.\" \n12. \nRemitting Requirement§ \na. \nPlanned changes. The Permittee shall give notice to the Regional Administrator and \nCommissioner of DPNR as soon as possible of any planned physical alterations or \nadditions to the permitted facility. Notice is required only when: \n(I) \nThe alteration or addition to a permitted facility may meet one of the criteria for \ndetermining whether a facility is a \"new source\" in 40 CFR, Part 122.29(b); or \n(2) \nThe alteration or addition could significantly change the nature or increase the \nquantity of pollutants discharged. This notification requirement applies to \npollutants which are subject neither to effluent limitations in the permit, nor to \nnotification requirements under Part I.C.7, above. \nb. \nAnticipated noncompliance. The Permittee shall give advance notice to the Regional \nAdministrator and the Commissioner of DPNR of any planned changes in the facility or \nactivity which may result in noncompliance with permit requirements as soon as it \nbecomes aware of the circumstances. \nc. \nTransfers \n(1) \nThis permit is not transferable to any person except after notice to the Regional \nAdministrator and the Commissioner of DPNR. Except as provided in \nparagraph c.(2)\n... [truncated, 2765 chars — for the full page use /api/corpus/document/EFTA01222235/56 or ?id=EFTA01222235&page=56]", "char_count": 2765}, {"efta_number": "EFTA01222235", "page_number": 57, "text_content": "Page 15 \nPart If \n(e) \nThe Commissioner does not notify the existing Permittee and the \nproposed new Permittee of his or her intent to modify or revoke and \nreissue the permit (A modification under this paragraph may also be a \nminor modification under 40 CFR, Part 122.63.) If this notice is not \nreceived, the transfer is effective on the date specified in the agreement \nmentioned in subparagraph (b). \n(3) \nIf this permit is automatically transferred in accordance with the provisions of \nparagraph (2), the permit maybe modified to reflect the automatic transfer after \nits effective date. \nd. \nMonitoring Reports. \n(1) \nMonitoring results shall be reported at the intervals specified in Part I of this \npermit \n(2) \nMonitoring results shall be reported on a Discharge Monitoring Report (DMR). \n(3) \nIf the Perminee monitors any pollutant more frequently than required by the \npermit, using test procedures approved under 40 CFR 136 or as specified in the \npermit, the results of this monitoring shall be included in the calculation and \nreporting of the data submitted in the DMR. \n(4) \nCalculations for all limitations which require averaging of measurements shall \nutilize an arithmetic mean unless otherwise specified in the permit. \ne. \nCompliance Schedules. Reports of compliance or noncompliance with, or any progress \nreports on, interim or final requirements contained in any compliance schedule of this \npermit shall be submitted no later than fourteen (14) days following each schedule date. \nf. \nTwenty_four hour reporting. \n(1) \nThe following information shall be reported orally to the Regional Administrator \nat (212) 267-5000, the US EPA VI Coordinator's Office at (340) 714-2333, \nDEPARTMENT OF HEALTH AT (340) 774-9000 and the Commissioner of \nDPNR at (340) 774-3320 immediately upon detection and at least within \ntwenty-four (24) hours from the time the Permitter becomes aware of the \ncircumstances: \n(a) \nAny noncompliance which may endanger health or the environment; \n(b)\n... [truncated, 2545 chars — for the full page use /api/corpus/document/EFTA01222235/57 or ?id=EFTA01222235&page=57]", "char_count": 2545}, {"efta_number": "EFTA01222235", "page_number": 58, "text_content": "Page 16 \nPart II \n(2) \nIn addition to the oral twenty-four (24) hour report, the Permittee shall also \nprovide a written submission to the Regional Administrator, the US EPA VI \nCoordinator, THE DEPARTMENT OF HEALTH and the Commissioner of \nDPNR within five (5) days of the time the Permittee becomes aware of the \ncircumstances. The written submission shall contain: \na) a description of the noncompliance and its cause; \nb) the period of noncompliance, including exact dates and times; \nc) the estimated time noncompliance is expected to continue if it has not been \ncorrected; and \nd) steps taken or planned to reduce, eliminate, and prevent recurrence of the \nnoncompliance. \ne) if the noncompliance involves an overflow, the written submission must \ncontain: \n(i) The location of the overflow; \n(ii) The receiving water, including bays, guts, ponds, etc.; \n(iii) An estimate of the volume of the overflow; \n(iv) A description of the sewer system component from which the \nrelease occurred (e.g., manhole, constructed overflow pipe, crack in \nPipe); \n(v) The estimated date and time when the overflow began and stopped \nor will be stopped; \n(vi) The cause or suspected cause of the overflow; \n(vii) Steps taken or planned to reduce, eliminate, and prevent \nreoccurrence of the overflow and a schedule of major milestones for \nthose steps; \n(viii) An estimate of the number of persons who came into contact with \nwastewater from the overflow; and \n(3) \nExcept with respect to written reports required under paragraph (1)(a) of \nsubsection f. above, the Commissioner may waive the written report on a case \nby case basis if the oral report has been received within twenty_four (24) hours. \nPublic notification. \n(1) \nThe Permittee shall, in the event of a sewage bypass or upset with a duration of \nmore than eight [8J hours: \n(a) \nFurnish a copy of the notice of potential health risk, to a radio station \nserving the area affected as soon as possible, but in no event later than \ntwenty-four [24)\n... [truncated, 2046 chars — for the full page use /api/corpus/document/EFTA01222235/58 or ?id=EFTA01222235&page=58]", "char_count": 2046}, {"efta_number": "EFTA01222235", "page_number": 59, "text_content": "Page I7 \nPart II \n(b) \nFurnish a copy of the notice of potential health risk, to a television \nstation serving the area affected as soon as possible, but in no event \nlater than twenty-four [24J hours following the violation. \n(c) \nSubmit for publication a notice of potential health risk in a newspaper \nof general circulation in the area affected, as soon as possible, but in no \nevent later than twenty-four 1241 hours following the violation and \ncontinue daily publication for as long as the violation exists. \n(d) \nPost a sign(s) in a conspicuous place in the area affected that will warn \nthe public of the potential health risk, as soon as possible, but in no \nevent later than twenty-four (24) hours following the violation. Posting \nshall continue for as long as the potential risk to health exists. \n(e) \nIn the event of a continuing sewage bypass lasting greater than forty-\neight (48) hours, public notice shall be updated and reissued as outlined \nin (a), (b), and (c) above and every twenty four 124) hours of sewage \nbypassing thereafter. \n(e) \nAt the end of a continuing bypass lasting greater than eight [8) hours, \npublic notice shall be issued by mans of the same media listed in (a), \n(b). and (c) above, informing the public of the end of the bypass and the \nextent of remaining health risks, if any. \n(2) \nThe Pennittoe shall, in the event of an anticipated \nsewage bypass or upset, with a duration expected to last more than eight [8) \nhours, give the public notification, at least, one day in advance of the anticipated \nbypass or upset, consistent with the notice requirements contained in (a) through \n(d) of this section. \n(3) \nThe following public notice, properly, completed, \nshall be used in compliance with (I) and (2) of this section. \nPUBLIC NOTICE \nOn  Morel  the  IDeuarrorent or Command  (has begun to/wlllj discharge [bypass) sewage into \n(location/water body( from the \n[pumping station/sewer line). \nThe reason for this discharge is  \nistatereasonJ \n. This di\n... [truncated, 3075 chars — for the full page use /api/corpus/document/EFTA01222235/59 or ?id=EFTA01222235&page=59]", "char_count": 3075}, {"efta_number": "EFTA01222235", "page_number": 60, "text_content": "Page 18 \nP811 II \nI. \nOther information. Where the Permittee becomes aware that it failed to submit any \nrelevant facts in a permit application, or submitted incorrect information in a permit application or \nin any report to the Regional Administrator or the Commissioner of DPNR, it shall promptly \nsubmit such facts or information to the Regional Administrator and the Commissioner of DPNR. \n13. \nBypassing.\na. \nBypass not violating limitations. The Permittee may allow any bypass \nto occur which does not cause effluent limitations to be violated, but only if it also is for \nessential maintenance to assure efficient operation. These bypasses are not subject to the \nprovisions of subsections I3.b. and 13.c. below. \nb. \nNotice \n( I) \nAnticipated bypass. If the Permittee knows in advance of the need for a bypass, \nit shall submit prior notice, if possible at least ten (10) days before the date of \nthe bypass. \n(2) \nUnanticipated bypass. The Permittee shall submit notice of an unanticipated \nbypass as required in subsection f. of section 12 above. \nc. \nProhibition of bypass. \n( 1) \nBypass is prohibited and the Commissioner may take enforcement action against \na Pennittee for bypass, unless: \n(a) \nBypass was unavoidable to prevent loss of life, personal injury, or \nsevere property damage; \n(b) \nThere was no feasible alternatives to the bypass, such as auxiliary \ntreatment facilities, retention of untreated wastes, or maintenance \nduring normal periods of equipment downtime. This condition is not \nsatisfied if adequate back up equipment should have been installed in \nthe exercise of reasonable engineering judgement to prevent a bypass \nwhich occurred during normal periods of equipment downtime or \nmaintenance; and \n(c) \nThe Permittee submitted notices as required under subsection 13.b. \n14. \nUpset\na. \nEffect of an upset. An upset constitutes an affirmative defense to an \naction brought for noncompliance with technology_based effluent limitations if the \nrequirements of subse\n... [truncated, 2470 chars — for the full page use /api/corpus/document/EFTA01222235/60 or ?id=EFTA01222235&page=60]", "char_count": 2470}, {"efta_number": "EFTA01222235", "page_number": 61, "text_content": "Page I9 \nPan II \n(I) \nAn upset occurred and that the Pennittee can identify the cause(s) of the upset; \n(2) \nThe permitted facility was at the time being properly operated: and \n(3) \nThe Pemiittee submitted notice of the upset as required in subsection f. of \nsection 12 above; and \n(4) \nThe Permittee complied with any remedial measures required under section 4 \nabove (duty to mitigate). \n(5) \nBurden of proof. In any enforcement proceeding the Permittee seeking to \nestablish the occurrence of an upset has the burden of proof. \n15. \nRemoved substances. Solids, sludges, filter backwash or other pollutants removed in the \ncourse of treatment or control of wastewaters and/or the treatment of intake waters shall be \ndisposed of in a manner such as to prevent any pollutant from such materials from entering \nnavigable waters. The following data shall be reported together with the monitoring data required \nin Pan 1, 8.2.: \na. \nThe sources of the materials to be disposed of; \nb. \nThe approximate volumes and weights; \nc. \nThe method by which they were removed and transported; and \nd. \nTheir final disposal locations. \n16. \nOil and hazardous substance liability. The imposition of responsibilities upon, or the \ninstitution of any legal action against the Permittee under section 311 of the Clean Water Act shall \nbe in conformance with regulations promulgated pursuant to Section 311 to discharges from \nfacilities with NPDES permits. \n17. \nReopener clause for toxic effluent limitations. \nNotwithstanding any other condition of this permit, if any applicable toxic effluent standard or \nprohibition is promulgated under Section 301(b)(2)(C) and (d), 304(bX2) and 307(aX2) of the \nClean Water Act and that effluent standard or limitation is more stringent than any effluent \nlimitation in the permit or controls a pollutant not limited in the permit, this permit shall be \npromptly modified or revoked and reissued to conform to that effluent standard or prohibition. \n18. \nAvailability of info\n... [truncated, 2783 chars — for the full page use /api/corpus/document/EFTA01222235/61 or ?id=EFTA01222235&page=61]", "char_count": 2783}, {"efta_number": "EFTA01222235", "page_number": 62, "text_content": "MAJOR COASTAL ZONE MANAGEMENT PERMIT NO. CZT-5-99W \nI. \nADDIORITY. This permit is issued by the St. Thomas Committee of the Virgin Islands \nCoastal Zone Management (CZM) Commission and is administered and monitored by the \nDepartment of Planning and Natural Resources (DPNR) on behalf of the Coastal zone \nManagement Commission pursuant to. Title 12, Chapter 21, V.I. Code, Section.910 and 911, \nand all other provisions of chapter 21 that apply. As herein, \"Pennittor\" is the St. Thomas \nCommittee of the V.I. CZM Commission, and \"Permittee\" is L.S.J., LLC ( LITTLE S-11. \nJAMES, LLC) \n2. \nSCOT F,. \n(a). \nThis permit approves the renovation and expansion of an existing dock which is 73 \nfeet, 8 inches by 8 feet. A 30 feet by 34 feet platfonn will be added at the end of the \nexisting dock and a 12 feet by 12 feet floating swim platform will be placed within \nthe bay. The total area impacted by these structures is 1739 square feet. The project \nis located on Little St. James Island. Little St. James is located between St. Thomas \nand St. John, U.S. Virgin Islands. \n(b). \nThis Permit allows the Permittee continued use of the dock described above for the \nterm (\"TERM\") set forth below. It shall not constitute a property right and may be \nrenewed only in accordance with Section 911 of the Act. \n3. \nTERM. \nThis permit is effective upon its signing by the Chairman of the St. Thomas \nCommittee of the V.I. CZM Commission, the Governor of the Virgin Islands, and ratified \nby the Legislature of the Virgin Islands or by the Committee on Planning and Environmental \nProtection, if the Legislature is not in session. As used herein, the \"Effective Date\" or \"the \ndate hereof' means the date of such ratification. This permit will expire twenty (20) years \nafter the Effective Date. The Permittee shall have the option to renew the permit within \nninety (90) days before the permit expires and the terms are subject to negotiations. This \npermit is issued for a definite term, twenty (20) years,\n... [truncated, 2361 chars — for the full page use /api/corpus/document/EFTA01222235/62 or ?id=EFTA01222235&page=62]", "char_count": 2361}, {"efta_number": "EFTA01222235", "page_number": 63, "text_content": "5. \nCOMPLIANCE WITH TERMS OF APPLICATION AND LEGALREQHMERE\n, \nNTS \nThe Permittee covenants and agrees that the project shall be used only for the purposes, and \nin the manner, set forth in the application, including all attachments and exhibits thereto and \nin compliance with applicable laws. \n6. \nOWNERSHIP OF IMPROVEMENTS All improvements to the premises made by the \nPerrnittee shall remain the property of the permittee and may be removed by the permittee \nat the termination of this permit for any reason. Any improvements remaining on the \npremises following the expiration or termination of this permit shall be subject to removal \nor modification as provided in Section 7, Subsection (k) below. \n7. \nGENERAL CONDITIONS \n(a) \nInability. The Permittee agrees to assume full and complete responsibility for all \nliability to any person or persons, including employees, as a result of its control of \nthe area described in Paragraph 2 of this permit, and all improvements thereon \n(which area and improvements are hereinafter referred to as\"the premises\"), and to \nhold the Permittor free and harmless for civil or other liabilities of any kind during \nthe time the Permittee is in control of the premises pursuant to this permit. \n(b) \npersonal Property and Damage. All personal property of any kind or description \nwhatsoever located on the premises shall be there at the Permittee's sole risk. \n(c) \nAssignment or Transfer. This permit may not be transferred or assigned except as \nprovided in Section 910-15 of the V.I. R& BEGS. \n(d) \nPermit to be Displayed A placard evidencing the permit shall be posted in a \nconspicuous place at the project site during the entire work period. \n(e) \nReliance on Information and Data The Permitter affirms that the information and \ndata which it provided in connection with its permit application are true and \naccurate, and acknowledges that if subsequent to the effective date of this permit \nsuch information and data prove to be false or inaccurate, t\n... [truncated, 2670 chars — for the full page use /api/corpus/document/EFTA01222235/63 or ?id=EFTA01222235&page=63]", "char_count": 2670}, {"efta_number": "EFTA01222235", "page_number": 64, "text_content": "in writing and demonstrates to the satisfaction of the Committee that good cause \nexists for granting such extension. \n(g). \nNotification of Completion Upon completion of any activity authorized or required \nby this CZM Permit, the Permittee shall promptly so notify the Director of the \nDivision of CZM and where the services of a professional engineer were required in \nundertaking the activity, a certification of compliance provided, by the project \nengineer that the plans and specifications of the project and all applicable V.I. Code \nrequirements have been met, shall be filed with said Director. \n(h) \nInspection. The Commission, its Committee, the Commissioner or their authorized \nagents or representatives shall have the power to enter at reasonable times during \nproject working hours upon any lands or waters in the coastal zone for which this \nCoastal Zone Permit has been issued. The Permittee shall permit such entry for the \npurpose of inspection and ascertaining compliance with the terms and conditions of \nsaid Coastal Zone Permit. The Permittee shall provide access to such records as the \nCommission, its Committee, or the Commissioner in the performance of it or his \nduties under the CZM Act may require the Permittee to maintain. Such records may \nbe examined, and copies shall be submitted to the Commission, its Committee or \nthe Commissioner upon request \n(i) \nconditions of Premises. The Development authorized by this permit shall he \nmaintained in a safe condition and in accordance with the description, plans, or \ndrawings approved by the Committee and all applicable V.I. Laws. \n(j) \nPublic Access to Shoreline The development shall be operated so as to assure \noptimum public access to the shoreline. \n(k) \nRestoration of Area, The Permittee, upon revocation or expiration of the permit, \nshall upon order of the Committee or the Commissioner, and in their sole discretion, \nremove all structures authorized by the permit and restore the area to its original \ncond\n... [truncated, 2926 chars — for the full page use /api/corpus/document/EFTA01222235/64 or ?id=EFTA01222235&page=64]", "char_count": 2926}, {"efta_number": "EFTA01222235", "page_number": 65, "text_content": "8). \n(m) \n(n) \nNon Waiver. One or more waivers by the Perrnittor of any covenant or condition of \nthis permit shall not be construed as a waiver of a further breach of the covenant or \ncondition. The consent or approval of the Pennittor to or of any acts by the \nPennittee requiring the Permittor's. consent or approval shall not be construed as \napproval of any subsequent similar act by the Permittee. \nRevocation. It is specifically understood that all the foregoing covenants and \nagreements, as well as other terms and special conditions hereby agreed to by the \nPermittee, are to be well and faithfully kept by Pennittee and that any failure by \nPermittee to keep same will result in revocation of this permit. \n(o) \nOther _Approval. if the development covered wider this permit requires separate and \ndistinct approval from the United States Government or any agency, department, \ncommission or bureau thereof, then no development or occupancy is allowed under \nthis permit until such permits or approvals have been obtained. \n(p) \nAbandonment. If the Permittee abandons, deserts or vacates the premises or \ndiscontinues its operation at the premises for a period totaling six (6) consecutive \nmonths, the permit will terminate automatically and be rendered null or void. \n(q) \nSignatures on the Permit Document The applicant shall sign and return the permit \ndocument to the DPNR within sixty (60) days of receipt thereof. Failure to return \nthe signed permit within the time period specified herein will be considered a \nrejection of the terms and conditions of the permit and will render the offer of the \npermit null and void, unless the applicant request a written extension and DPNR \ngrants the written extension. \n(r) \nDamage as Repair of Premises Described in Para anh 2. In the event of damage \nto or destruction of the premises described in paragraph 2 hereof, repair work may \nbe done only after a request to do so has been Submitted in writing to DPNR and \nwritten permission has b\n... [truncated, 2386 chars — for the full page use /api/corpus/document/EFTA01222235/65 or ?id=EFTA01222235&page=65]", "char_count": 2386}, {"efta_number": "EFTA01222235", "page_number": 66, "text_content": "9). \nMS \nPursuant to section 910-5 (e) 8, of the rules and Regulations, V.I. Code, Title 12, Chapter \n21, the Commissioner of the Department of Panning and Natural Resources negotiated the \nfollowing fees to be paid by the Permittee. Certified or bank draft checks shall be made \npayable to DPNR five (5) days after the Legislature ratifies this permit. \n(a). \nA permit term of twenty (20) years with an option to renew as stated in paragraph \nthree (3) of this permit. \n(b). \nA fee of two thousand five hundred dollars ($2,500.00) per year was negotiated. \n(c). \nOn the first 5* anniversary, the fees shall be adjusted pursuant to applicable Rules \nand Regulations, or re-negotiated not to exceed 25% of the assessed fee. Failure of \nthe permittee to re-negotiate fees will result in an automatic increase of 25%, or a \nfee adjustment pursuant to applicable Rules and Regulations, whichever is higher. \nAfter the first fifth anniversary, fee adjustments for each additional fifth anniversary \nshall be pursuant to applicable Rules and Regulations. \n(d). \nAll fees payable under this permit shall be paid to the Permittor regardless as to \nwhether Permittee actually occupies or uses the submerged land described herein, \nprovided, however that if the permit is modified to decrease/increase the submerged \nlands so occupied, then the fees may also be decreased/increased consistent \nherewith. \n5 \nEFTA01222301\n", "char_count": 1411}, {"efta_number": "EFTA01222235", "page_number": 67, "text_content": "IT IS EXPRESSLY UNDERSTOOD by the parties hereto that the title to all submerged or filled \nland which is altered or occupied on the basis of this permit is in the Government of the Virgin \nIslands, and the Permittee shall have no right or interest therein, of any kind whatsoever, other than \nsuch rights as are expressly set forth herein, and that this instrument is not a lease. \nIN TESTIMONY WHEREOF, the parties herein have hereunto set their hands and seals on the \ndays-and-years appearing herein below. \nST. THOMAS COMMITTEE OF THE VIRGIN ISLANDS CZM COMMISSION \nPermittor \nBy://64/e7y0.e....,-/5.4, \nAlbert Paiewonslcy, Cud an \nSt. Thomas CZM Committee \nBy. \nPaul Hoffman , Attorney for LSJ,LLC \n/0-7- F? \nDate \nL.S.J., LLC ( LITTLE ST. JAMES, LLC) \nGovernor of the Virgin Islands \nDate \nRATIFIED \nLegislature of the Virgin Islands \nPresident of the Legislature \nChairman \n6 \nDate \nOr if the I tislature is not in session Committee \nring & Environmental Protection \n3-30- \nOO \nDate \nEFTA01222302\n", "char_count": 1005}, {"efta_number": "EFTA01222235", "page_number": 68, "text_content": "I, Mr. Paul Hoffman, Attorney for L.S.J., LLC., LITTLE ST. JAMES, LLC do hereby certify that as \nthe legal representative for L.S.J., LLC., LITTLE ST. JAMES, LLC, I am duly authorized and \nempowered to sign this Permit on behalf of L.S.J., LLC., LITTLE ST. JAMES, LLC. \n1 \nPaul offman, Attorney for LSJ, LW \n/\n. \nDate \n• \nSWORN AND SUBSCRIBED before me \nthis/Cfay of  E2e-eam-\ne,-  1999 \nNotary Public \nBarbara Mignon Weatherly \nCommission \nes November\nZOO \n21, \nNotary Pubic ECxpirommission No. 1.1411134)7 \n7 \nEFTA01222303\n", "char_count": 525}, {"efta_number": "EFTA01222235", "page_number": 69, "text_content": "lVAINOR COASTAL ZONE MANAGEMENT PERMIT NQ. C4T-25-1.01-\n1. \nAUTHORITY, This permit is issued by the Commissioner of the Department of Planning \nand Natural Resources and is administered and monitored by the Department pursuant to \nTitle 12, Chapter 21, Virgin Islands Code. As herein, \"Pcmdttor is the Government of the \nVirgin Islands and \"Pennittee\" is ISJ, LLC. \n2. \nSCOPE. This permit allows the site preparation and construction of 25' x 70 sq. ft. \nswimming pool with a 2000 sq. ft. cabana, Corral stone deck; living space, rest room, pool \nequipment room and a 1,800 sq. ft music room with living area. This project is located at \nparcel A Little St. James, St. Thomas, Virgin Islands. \n3. \nTERM% This permit is effective upon its signing by the Commissioner of the Department of \nPlanning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization \nfor construction under this permit will expire if the Pennittee fails to commence work within \ntwelve (12) months from the date this permit becomes effective. \n4. \nS. \nDOCUIVIENTS INCORPORATED BY REFERENCE, \nEXHIBIT A - CZM Permit Application dated April 8, 2010 \nEXHIBIT B - Required document submittal (deed, tax letter and mans). \nEXHIBIT C Site plan and Drawings dated July 7, 2010. \nGENERAL CONDITIONS. \n(a) \nLiability& The Pennittee agrees to assume full and complete responsibility for all \nliability to any person or persons, including employees, as a result of its control of the \narea described in Paragraph 2 of this permit, and all improvements thereon (which \narea and improvements arc herein after referred to as\" the premises\") and to hold the \nPermitter free and harmless from civil or other liability of any kind during the time \nthe pennittee is in control of the premises pursuant to this permit. \n(b) \nPersonal Property aad Dargagej. All personal property of any kind or description \nwhatsoever, located on the premises will be there at the Pennittec's sole risk. \n(c) \nAssignments or Transfer, This pe\n... [truncated, 2306 chars — for the full page use /api/corpus/document/EFTA01222235/69 or ?id=EFTA01222235&page=69]", "char_count": 2306}, {"efta_number": "EFTA01222235", "page_number": 70, "text_content": "CZT-25-10I. \n(e) \ngelmnpaidemaand Dal& The permittee affirms that the information, and \ndata which he/she provided in connection with his/her permit application is true and \naccurate, and acknowledges that if subsequent to the effective date of this permit \nsuch information and data proves to be false or inaccurate, the permit may be \nmodified, suspended or revoked in whole or in part, and that the Commissioner may, \nin addition, institute appropriate legal action. \n(1) \nDevelopment to be Commenced, Any and all development approved by this Coastal \nZone Management Permit shall be commenced within twelve (12) months from the \ndate this permit becomes effective. Pail= to perform substantial work within such \nperiod and thereafter until completion of construction will cause the permit to lapse \nand render it null and void unless an extension is granted by the Commissioner. \n(g) \nNotification of Completion. Upon completion of any activity authorized or required \nby this Coastal Zone Management Permit, the permittee shall promptly so notify the \nDirector of the Division of CZM (\"The Director\") and where the service of a \nprofessional engineer were required in undertaking the activity, a certification of \ncompliance provided by the project engineer that the plans and specifications of the \nproject and all applicable Virgin Islands Code requirements have been met, shall be \nfiled with the Director. \n(11) \nInspection, The Commissioner or his authorized agents or representatives shall have \nthe power to enter at reasonable time during projects working hours upon any lands \nor waters for which a Coastal Zone Permit has been issued. The Pennine° shall \npermit such entry for the purpose of inspection and ascertaining compliance with the \nterms and conditions of said Coastal Zone Management Permit. The Permittee shall \nprovide access to such records as the Commissioner in theperfonnance of his duties \nunder the Act may require the Permittee to maintain. Such records may be exami\n... [truncated, 2739 chars — for the full page use /api/corpus/document/EFTA01222235/70 or ?id=EFTA01222235&page=70]", "char_count": 2739}, {"efta_number": "EFTA01222235", "page_number": 71, "text_content": "CZT25-1011. \n(k) \nNotices, All notices sent or requited to be seat hereunder must be certified mail, \nreturn receipt requested. If addressed to the permitter, same shall be sent to the \nCommissioner of the Department of Planning and Natural Resources, Cyril B. King \nAirport, Second Floor, St. Thomas, VI 00802 or to suchplace as the Permitter may \nherein after designate by certified mail. If addressed to the Permittee, same shall be \nsent to LSJ, LLC, 6100 Red Hook Quarter, Suite B, St. Thomas, USVI 00802 or to \nsuch place as the Pennittee may hereinafter designate by certified mail, return receipt \nrequested. \n(I) \nNonwaiver, One or more waivers by the Permitter of any covenant or condition of \nthis permit shall not be construed as a waiver or breach of the covenant or condition, \nand the consent or approval of the Permitter to or of any acts by the Permittee \nrequiring the Permittor's consent or approval shall not be construed as approval of \nany subsequent similar act by the Pennittee. \n(in) \nRevocation. \nIt is specifically understood that all foregoing covenants and \nagreements, as well as other terms and special conditions hereby agreed to by \nPermitter', are to be well and faithfully kept by Permillee and that any failure by \nPennittee to keep same.will result in revocation of this permit. \n(n) \nOther Approval. If the development covered under this permit requires separate and \ndistinct approval from the United States Government or any agency, department, \ncommission or bureau thereof, then no development or occupancy is allowed under \nthis permit until such permits or approvals have been obtained. \n(o) \nAbandonment. If the Permittee abandons, deserts or vacates the premises or \ndiscontinues its operations at the premises for a period totaling six (6) consecutive \nmonths, then the permit will terminate automatically and be rendered null and void. \n(p) \nNputioaL e fadtroApflakingthAi\nr \nn the event of damage to \nor destruction of the premises described in Paragr\n... [truncated, 2710 chars — for the full page use /api/corpus/document/EFTA01222235/71 or ?id=EFTA01222235&page=71]", "char_count": 2710}, {"efta_number": "EFTA01222235", "page_number": 72, "text_content": "(21-25-401. \nB. The Coastal Zone Management permit placard shall be placed in a conspicuous \nlocation on the site as soon as work commences. \nC. \nThe permit is valid only for work as stated in Paragraph 2 \"Scope.\" \nD. Erosion/Sedimentation control measures shall be installed and maintained until all \ndevelopment activities are completed. All excavated areas shall be protectively \nberm to prevent silt runoff. \nE. \nSite disturbance shall be limited to areas designated on the approved drawings. \nP. \nAll other necessary permits shall be obtained prior to commencement of work. \nO. \"Upon discovery of any archaeological or historical site, or human burial site or \nremains upon private lands, the owner or the representative shall immediately \nnotify the State Historic Preservation Office verbally and in writing.\" \nH. The scope of Permit CZT-25-10T, is confined to the footprint approved in Permit. \nNo development activities may occur outside the footprint of the approved Permit. \nI. \nSilt fencing must be installed with steel posts and wire fence support as described in \nthe 2002 Environmental Protection Handbook. \norinicreportslupda \ntiding-oda \ngraphs of the-slferl he monitor \ne un r a sta \nrs m onn Ztlat hdevelopmTL-rretivitie. \nurntant to this vermit.ars-eornpleted-and-a-cortificate-atoneunancy is issu \n4 \nEFTA01222307\n", "char_count": 1335}, {"efta_number": "EFTA01222235", "page_number": 73, "text_content": "CZT-25-101, \nOn this \nDay o \n10 the Department of Pla ming and Natural Resources hereby \nissues Minor CZM Permit No. CZT-25-101, \nI, the undersigned, have read and understood all terms and conditions established in Permit No. \nCZT-25-101, and hereby agree to be bound by the terms and conditions contained therein. \nh ha \nDate \n5 \n. . \n. . • • • \n. . \n. . \n• • \n. . \n. . \n• • \n• • \n..!.• \n. . • . 11. \n••• \n. . • . • \n. \n. . \n. . . . . \n. • . \nEFTA01222308\n", "char_count": 457}, {"efta_number": "EFTA01222235", "page_number": 74, "text_content": "MINOR COASTAL ZONE MANAGEMENT' PERMIT NO. C27-27-1,0L \n1. \nAUTHORITY. This permit is issued by the Commissioner of the Department of Planning \nand Natural Resources and is administered and monitored by the Department pursuant to \nTitle 12, Chapter 21, Virgin Islands Code. As herein, \"Permittoe\" is the Government of the \nVirgin Islands and \"Permittee\" is LSJ, LLC. \n2. \nSCOPE This permit allows the site preparation and construction of a 1,320 sq. ft ATV \ngarage made of natural stone. This project is located at parcel C Little St. James, St. Thomas, \nVirgin Islands. \n3. \nTERM. This permit is effective upon its signing by the Commissioner of the Department of \nPlanning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization \nfor construction under this permit will expire if the Permittee fails to commence work within \ntwelve (12) months from the date this permit becomes effective. \n4. \n5. \nDOCUMENTS INCORPORATED BY REFERENCE, \nEXHIBIT A - CZM Permit Application dated April 8, 2010 \nEXHIBIT B - Required document submittal (deed, tax letter and maps). \nEXHIBIT C - Site plan and Drawings dated July 7, 2010. \nGENERAL CONDITIONS. \n(a) \nLiability. The Pennittee agrees to assume full and complete responsibility for all \nliability to any person or persons, including employees, as a result of its control ofthe \narea described in Paragraph 2 of this permit, and all Improvements thereon (which \narea and improvements are herein after referred to as\" the premises\") and to hold the \nPermitter free and harmless from civil or other liability of any kind during the time \nthe pennittee is in control of the premises pursuant to this permit. \n(b) \nPersonal Property and Damage, All personal property of any kind or description \nwhatsoever, located on the premises will be there at the Permittee's solo risk. \n(c) \nAssignments ()rigida. This permit may not be transferred or assigned except as \nprovided in Section 910-15 ofthe Regulations of the Coastal Zone Management Ac\n... [truncated, 2173 chars — for the full page use /api/corpus/document/EFTA01222235/74 or ?id=EFTA01222235&page=74]", "char_count": 2173}, {"efta_number": "EFTA01222235", "page_number": 75, "text_content": "CZT-27-101.\n(c) \nRename on Information* Data, The permittee affirms that the information, and \ndata which he/she provided in connection with his/her permit application is true and \naccurate, and acknowledges that if subsequent to the effective date of this permit \nsuch information and data proves to be false or inaccurate, the permit may be \nmodified, suspended or revoked in whole or in part, and that the Commissioner may, \nin addition, institute appropriate legal action. \n(0 \nDevelopment to be Commenced, Any and all development approved by this Coastal \nZone Management Pennit shall be commenced within twelve (12) months from the \ndate this permit becomes effective. Failure to perform substantial work within such \nperiod and thereafter until completion of construction will cause the permit to lapse \nand render it null and void unless an extension is granted by the Commissioner. \nislotification of Completion, Upon completion of any activity authorized or required \nby this Coastal Zone Management Permit, the permittee shall promptly so notify the \nDirector of the Division of CZM (\"The Director\") and where the service of a \nprofessional engineer were required in undertaking the activity, a certification of \ncompliance provided by the project engineer that the plans and specifications of the \nproject and all applicable Virgin Islands Code requirements have been met, shall be \nfiled with the Director. \n(h) \nInspection, The Commissioner or his authorized agents or representatives shall have \nthe power to enter at reasonable time during projects working hours upon any lands \nor waters for which a Coastal Zone Permit has been issued. The Permittee shall \npermit such entry for the purpose of inspection and ascertaining compliance with the \nterms and conditions of said Coastal Zone Management Permit. The Permittee shall \nprovide access to suchrecords as the Commissioner in the performance of his duties \nunder the Act may require the Pennittee to maintain. Such records may be \n... [truncated, 2755 chars — for the full page use /api/corpus/document/EFTA01222235/75 or ?id=EFTA01222235&page=75]", "char_count": 2755}, {"efta_number": "EFTA01222235", "page_number": 76, "text_content": "ca-27- lei. \nNotices. All notices sent or required to be sent hereunder must be certified mail, \nreturn receipt requested. If addressed to the permitter, sante shall be sent to the \nCommissioner of the Department of Planning and Natural Resources, Cyril E. King \nAirport, Second Floor, St. Thomas, V100802 or to such place as the Pennittor may \nherein after designate by certified mail. If addressed to the Famine*, same shall be \nsent to LSJ, lie, 6100 Red Hook Quarter, Suite 13, St. Thomas, USVI 00802 or to \nsuch place as the Permittee may hereinafter designate by certified mail, return receipt \nrequested. \n(1) \nNonwaiver. One or more waivers by the Pennittor of any covenant or condition of \nthis permit shall not be construed as a waiver or breach of the covenant or condition, \nand the consent or approval of the Permitter to or of any acts by the Permittee \nrequiring the Permittor's consent or approval shall not be construed as approval of \nany subsequent similar act by the Pennittee. \n(m) \nRevocation, \nIt is specifically understood that all foregoing covenants and \nagreements, as well as other terms and special conditions hereby agreed to by \nPermittee, are to be well and faithfully kept by Permittee and that any failure by \nPermittee to keep same will result in revocation of this permit. \n(n) \nOther Approval. If the development covered under this permit requites separate and \ndistinct approval from the United States Government or any agency, department, \ncommission or bureau thereof, then no development or occupancy is allowed under \nthis permit until such permits or approvals have been obtained. \n(o) \nAbandonment. If the Permittee abandons, deserts or vacates the premises or \ndiscontinues its operations at the premises for a period totaling six (6) consecutive \nmonths, then the permit will terminate automatically and be rendered null and void. \n(p) \nDamage and Repair of Premises Described in Paragraph 2. In the event of damage to \nor destruction of the premises des\n... [truncated, 2726 chars — for the full page use /api/corpus/document/EFTA01222235/76 or ?id=EFTA01222235&page=76]", "char_count": 2726}, {"efta_number": "EFTA01222235", "page_number": 77, "text_content": "CZT-27-101, \n6. \nSPECIAL CONDITIONS. \nA. The Division of Coastal Zone Management shall be notified in writing at leas forty-\neight (48) hours before work commences. \nB. The Coastal Zone Management permit placard shall be placed in a conspicuous \nlocation on the site as soon as work tommences. \nC. The permit is valid only for work as stated in Paragraph 2 \"Scope.\" \nD. \nErosion /Sedimentation control measures shall be installed and maintaineduntil all \ndevelopment activities are completed. All excavated areas shall be protectively \nberm to prevent silt runoff. \nE. \nSite disturbance shall be limited to areas designated on the approved drawings. \nF. \nAll other necessary permits shall be obtained pier to commencement of work. \nCI. \"Upon discovery of any archaeological or historical site, or human burial site or \nremains upon private lands, the owner or the representative shall inunediately \nnotify the State Historic Preservation Office verbally and in writing.\" \nIi. The scope of Permit CZT-27-1 0L is confined to the footprint approved in Permit. \nNo development activities may occur outside the footprint of the approved Permit \nI. \nSilt fencing must be installed with steel posts and wire fence support as described in \nthe 2002 Environmental Protection Handbook. \ntR`Itlymnrittmi\n tcpons/upda . \nt-p \nthe -poi \nmIctl8W- amp \no \nnior \nphs of the site.) The mo \nre tiis nua.a.:,4m.Mie_until-a-staff4s inforsit \nkievelep\nt,-\nt\netivti \n----rstiont-toiliirieirit are comp \namp \nl-a-cedifteate of occupancy is is \n4 \nEFTA01222312\n", "char_count": 1537}, {"efta_number": "EFTA01222235", "page_number": 78, "text_content": "CZT-27-10L \nOn thisa,q_pay of \n2010 the Department ofPlanning and Natural Resources hereby \nissues Minor CZM Permit No. CZT-27-101... \nI, the undersigned, have read and understood all terms and conditions established in Permit No. \nCZT-27-10I, and hereby agree to be bound by the terms and conditions contained therein. \nSignatur \ncc: Filo \n5 \nEFTA01222313\n", "char_count": 357}, {"efta_number": "EFTA01222235", "page_number": 79, "text_content": "MINOR COASTAL ZONE MANAGEMENT PERMIT NO. CLT-26-10L \n1. \nAUTHORITY. This permit is issued by the Commissioner of the Department of Planning \nand' atural Resources and is administered and monitored by the Department pursuant to \nTitle 12, Chapter 21, Virgin Islands Code. As herein, \"Pennittor\" is the Government of the \nVirgin Islands and \"Permittee\" is LSI, LLC. \n2. \nSCOPE. This permit allows the she preparation and construction of 5,000 sq. ft suest \ncottage. This project is located at parcel B Little St. James, St. Thomas, Virgin Islands. \n3. \nTERM, This permit is effective upon its signing by the Commissioner of the Department of \nPlanning and Natural Resources, pursuant to VI Code, Title 12, Chapter 21. Authorization \nfor construction under this permit will expire if the Pemattee fails to commence work within \ntwelve (12) months from the date tlds permit becomes effective. \n4. \n5. \nDOCUMENTS INCORPORATED BY REFERENCE., \nEXHIBIT A COI Pernik Application dated April 8, 2010 \nExinorr - Required document submittal (deed, tax letter and snaps). \nEXHIBIT C- Site plan and Drawings dated July '7, 2010. \nGENERAL CONDITIONS. \n(a) \nLhtbility. \nThe Permittee agrees to assume fill and complete responsibility for all \nliability to any person or persons, including employees, as a result of its control of the \narea described in Paragraph 2 of this permit, and all improvements thereon (which \narea and improvements are herein after referred to as\" the premises\") and to hold the \nPennittor five and harmless from civil or other liability of any kind d tiring the time the \npennittee is in control of the premises pursuant to this pertrdt. \n(b) \nLemma Property endthuma All personal property of any kind or description \nwhatsoever, located on the premises will be there at the Permittec's sole risk. \n(c) \nAssirunnems or Taut\n This permit may not be transferred or assigned except as \nprovided in Section 910-15 of the Regulations of the Coastal Zone Management Act. \n(d) \nrifle \ni \na _da A p\n... [truncated, 2136 chars — for the full page use /api/corpus/document/EFTA01222235/79 or ?id=EFTA01222235&page=79]", "char_count": 2136}, {"efta_number": "EFTA01222235", "page_number": 80, "text_content": "Eglianowanfonnation  and Data. The permittee affirms that the information, and \ndata which he/she provided in connection with his/her permit application is true and \naccurate, and acknowledges that if subsequent to the effective date ofthis permit such \ninformation and data proves to be false or inaccurate, the permit may be modified, \nsuspended or revoked in whole or in part, and that the Commissioner may, in \naddition, institute appropriate legal action. \n(f) \nDevekmftenkftaeca\ngminarmt Any and all development approval by this Coastal \nZone Management Permit shall be commenced within twelve (12) months from the \ndate this permit becomes effective. Failure to perfonn substantial work within such \nperiod and thereafter until completion of construction will cause the permit to lapse \nand render it null and void unless an extension is granted by the Commissioner. \n(g) \nNotification of Completion. Upon completion of any activity authorized or required \nby this Coastal Zone Management Permit, the permiuee shall promptly so notify the \nDirector of the Division of CZM (\"The Director\") and where the service of a \nprofessional engineer were required in undertaking the activity, a certification of \ncompliance provided by the project engineer that the plans and specifications of the \nproject and all applicable Virgin Islands Code requirements have been met, shall be \nfiled with the Director. \n(10 \nJuspectirm, The Commissioner or his authorized agents or representatives shall have \nthe power to enter at reasonable time during projects working hours upon any lands \nor waters for which a Coastal Zone Permit has been issued. The Permitter shall \npermit such entry for the purpose of inspection and ascertaining compliance with the \nterms and conditions of said Coastal Zone Management Permit. The Permittee shall \nprovide access to such records as the Commissioner in the performance of his duties \nunder the Act may require the Permittee to maintain. Such records may be examined \nand \n... [truncated, 2730 chars — for the full page use /api/corpus/document/EFTA01222235/80 or ?id=EFTA01222235&page=80]", "char_count": 2730}, {"efta_number": "EFTA01222235", "page_number": 81, "text_content": "&dot All notices sent or required to be sent hereunder must be certified mail, \nreturn receipt requested. If addressed to the pennittor, same shall be sent to the \nCommissioner of the Department of Planning and Natural Resources, Cyril E. King \nAirport, Second Floor, St. Thomas, VI 00802 or to such place as the Permitter may \nherein after designate by certified mail. If addressed to the retrainee, same shall be \nsent to LSI, LEC, 6100 Red Hook Quarter, Suite B, St. Thomas, USVI 00802 or to \nsuch place as the Permittee may hereinafter designate by certified mail, return receipt \nrequested. \n(I) \nNonwalver, One or more waivers by the Pennittor of any covenantor condition of \ntliis permit shall not be construed as a waiver or breach of the covenant or condition, \nand the consent or approval of the Pennittor to or of any acts by the Permittee \nrequiring the rennittoes consent or approval shall not bo construed as approval of \nany subsequent similar act by the romance. \n(m) \nRevocation. It is specifically understood that all foregoing covenants and agreement; \nas well as other terms and special conditions hereby agreed to by Pennine°, are to be \nwell and faithflilly kept by Permittec and that any failure by Permittee to keep same \nwill result in revocation of this permit. \n(n) \nOther Approval,. lithe development covered under this permit requires separate and \ndistinct approval from the United States Government or any agency, department, \ncommission or bureau thereof, then no development or occupancy is allowed under \nthis permit until such permits or approvals have been obtained. \nAbandonment If the Pennine° abandon; deserts or vacates the premises or \ndiscontinues its operations at the premises for a period totaling six (6) consecutive \nmonths, then the permit will terminate automatically and be rendered null and void. \nRepair ofPremises\n in S' eaga In the event of damage to \nor destruction of the premises described in Paragraph 2 hereof, repair work may bo \ndone only \n... [truncated, 2657 chars — for the full page use /api/corpus/document/EFTA01222235/81 or ?id=EFTA01222235&page=81]", "char_count": 2657}, {"efta_number": "EFTA01222235", "page_number": 82, "text_content": "CZT-26-10L \n6. \n4 \nSPECIAL CONDITIONS. \nA. \nThe Division of Coastal Zone Management shall be notified in writing at leas forty-\neight (48) hours before work commences. \nB. \nThe Coastal Zone Management permit placard shall be placed in a conspicuous \nlocation on the site as soon as work commences. \nC. The permit is valid only tbr work as stated in Paragraph 2 \"Scope.\" \nD. \nErosion /Sedimentation control measures shall bo installed and maintained until all \ndevelopment activities are completed. MI excavated areas shall be protectively \nberm to prevent silt runoff. \nE. \nSite disturbance shall be limited to areas designated on the approved drawings. \nF. \nAll other necessary permits shall be obtained prior to commencement of work. \nO. \"Upon discovery of any archaeological or historical site, or human burial site or \nremains upon private lands, the owner or the representative shall immediately notify \nthe State Historic Preservation Office verbally and in writing.\" \nThe scope of Permit CZT-26-101, is confined to the footprint approved in Permit. \nNo development activities may occur outside the footprint of the approved Permit. \n1. \nSilt fencing must be installed with steel posts and wire fence support as described in \nthe 2002 Environmental Protection Handbook. \nbitat-en-h6hsainddy seven ly corn ro \ni nn—collabonithrerith—the--Division of \nE\nA.\n.f_21 rstoraliotArst\n'vitiosallIhrprisenitnest\nivisiono, \nnt and Wildt e. \nmPed-Pholo8mPits-of-1 \n8_O Ilio_monitonn\nTinueuntrieteffismformed-thatan development %Owner:Furst \nEFTA01222317\n", "char_count": 1548}, {"efta_number": "EFTA01222235", "page_number": 83, "text_content": "cc: File \nCZT-26-1 \nOn this \n__Day of \n \n, 2010 the Department of Planning and Natural Resources hereby \nissues Minor CZM Permit No. CZT-26-10L. \n1, the undersigned, have read mid understood all terms and conditions established in Permit No. \nCZT-26-10L and hereby agree to be bound by the terms and conditions contained therein. \nDate \n5 \nEFTA01222318\n", "char_count": 353}]}