{"efta_number": "EFTA01166948", "page_count": 1, "url": "https://epstein-data.com/EFTA01166948", "pdf_url": "https://epstein-data.com/pdf/EFTA01166948.pdf", "pages": [{"efta_number": "EFTA01166948", "page_number": 0, "text_content": "Satellite/Internet:\nZORRO DEVELOPMENT\n1/30/14\n4th Feb - Advanced Communcations due on site to install New Router\n30th Jan - Revised Pole & Power Supply estimate forwarded to RK for review/approval\n31st Jan - RK & BG will complete final review of ISP (Spacenet) proposal\nPool Replaster/Spa Tiling: attached photos\nPool plaster is curing.\nPool will be drained Feb 10th for plaster polishing to remove stains & boot marks\nPool expected to be fully operational by 1st week of March\nSpa Water Line Tile Band removed & replaced with new\nSmall Spa Tile due on site 3rd Feb.\nSpa expected to be fully operational by 5th Feb\nSony:\nattached photos\nIR installed to coffee table, mouldings & projector cover reinstalled\nTablet updated with Macros.\nNeed to wait for new update for Sony Tablet, Kitcat to Jelly Bean for Apple TV Remote\nApple TV can be controlled by Apple TV Remote\nPicture produced by Blue Ray very grainy, installer requested replacement unit due on\nsite 31st Jan, Brice will instal\nUnder present Internet Speeds it will take 70 plus hours to download a 4K movie\nDakota Well:\nBig Rig was due 27th Jan, but was held up\n31st Jan\nBig Rig due on site\nEFTA01166948\n", "char_count": 1163}]}