{"efta_number": "EFTA01124657", "page_count": 9, "url": "https://epstein-data.com/EFTA01124657", "pdf_url": "https://epstein-data.com/pdf/EFTA01124657.pdf", "pages": [{"efta_number": "EFTA01124657", "page_number": 0, "text_content": "Landscaping (22) -\nRear Planter Bed\nStart\n6/1/13\nEnd\nFront & Rear Parking Beds\nBowel Garden\nAspen Grove\nPinion Screen\nLandscape Lighting Timers Replacement - Start\nZorro Projects - 6/29/13\nNotes\nTotal Est. Cost\n$75,000.00 3/28/13 - Refurbishment & Maintenance proposals from 3\nPhoto\ncompanies forwarded to RK & DI\n4/27/13-JE approved Aspen Landscaping for Refurbishment\n5/9/13 - New proposal forwarded to JE & RK, awaiting direction\n5/16/13 - Final proposal forwarded to RK, will discuss with JE\n5/24/13 - Aspen agreed to $75,000\n5/31/13 - $44,383.08 Deposit issued to Aspen\n6/1/13 Project Started\n6/8/13 - Work continues, soil preparation in progress\nX\n6/14/13 - Plant material starting to arrive, more due next week\n6/18/13 More plant material arrived\n6/21/13 - Planting & Irrigation complete at back parking area.\n6/22/13 - Planting & Irrigation continues around chess set -\nattached photos\n6/26/13 - More plant material arrived on site\n6/27/13 - Preparation front parking area begins, Columbians &\nTrumpet Vine planted along pathway between MH & Dog Pen.\nIrrigation installed in all planted areas - attached photos\nEnd\nTotal Est. Cost\nNotes\n4/27/13-JE approved\n5/1/13 - Unable to move forward until Project 22 - Landscaping\nhas been resolved\nPhoto\n6/1/13 - Brice to review with Aspen about location etc.\n6/7/13 - Awaiting electrical proposal due 6/29/13\nLandscaping-In House -\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\nPonderosa Pines at Front Entrance &\nLandscape Lights at MH\n6/3/13\n4/27/13-JE approved the removal of dead pine in courtyard &\nPonderosa Pines, Landscape Lights & relocate Pinions to the area.\n6/3/13 - Project Started\n6/7/13 & 6/18/13 - Removal of Ponderosas & Pine complete\n6/25/13 - Work to begin on landscape lighting\n6/29/13- Have installed landscape lighting where planting is\ncomplete, will continue next week\nEFTA01124657\n", "char_count": 1847}, {"efta_number": "EFTA01124657", "page_number": 1, "text_content": "Terraces (27)-Three B's\nTerraces-$52,000.00\nStucco/Gutters/Painting - $4,200.00\nZorro Projects - 6/29/13\nStart\n4/7/13\nEnd\nTotal Est. Cost\n$56,200.00\n12/12/12 - Bid Received\n3/20/13-JE approved\n4/7/13 - Project Started\nNotes\nPhoto\n4/20/13 - Library Membrane - installed.\n5/16/13 - MBR Balustrade reinstalled\n5/20/13 - MBR Membrane to be installed\n5/31/13 - There was a fault in one of the rolls of material, vendor\nhas reordered, will recover area once on site.\n6/7/13 - Material on site, will continue 6/10/13\n6/14/13 - Membranes & Gutters Complete - attached photos\n6/18/13 - Stucco & Painting scheduled to start\n6/21/13 - Stucco & Painting Complete - attached photos\n6/24/13 - Final review of completed work\n7/2/13 - Final Punch Out to begin of all outstanding work\nFront Gates Openers Call Boxes (30) -\nStart\nEnd\nTotal Est. Cost\nNotes\n4/20/13 - Bid received, requested vendor to make adjustments\n5/9/13 - Received revised bid. Options & Equipment reviewed\n5/12/13 Options & Equipment selected, final bid due 5/21/13\n5/21/13 - Final bid received via fax, unable to read, vendor will\nresend.\n6/8/13 - Final bid attached, also forwarded separately to RK.\n6/11/13 - RK requested material breakdown\n6/14/13 - Material breakdown forwarded to RK\n6/19/13 - Resubmitted revised pricing to RK - awaiting direction\n6/28/13 - RK requested that Three B's submit an estimate for this\nwork. Have contacted Three B's, will be on site next week to\nreview\nPhoto\nEFTA01124658\n", "char_count": 1460}, {"efta_number": "EFTA01124657", "page_number": 2, "text_content": "Zorro Projects - 6/29/13\nCooling Tower (36) - JBH\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\n4/24/13 - RK approved bid from SPX & JBH. RK has all cost details\n5/3/13 - Deposit was to be forwarded, awaiting confirmation\n6/20/13- Unit on site - attached photo\n6/21/13 - Noting attached E Mail, JBH have pulled their team off\nmoving forward with this project until RK makes contact about\noutstanding balance\nPayment received by Vendor\n7/8/13- Installation scheduled\nReplacement of Pool Pac (33) -\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\nUnit Cost $43,170.00\nEngineering Inspection - $9,100.00\nCamera Ducting Inspection - $1,214.91\nDucting - TBA\n9/11/12\n4/29/13-Quote forwarded to RK, who requested more detail\n5/8/13 - Revised quote forwarded to RK, awaiting direction\n5/22/13-Beaudin Ganze on site to review project\n5/29/13 - Beaudin Ganze report forwarded to JE & RK\n5/29/13-JE approved investigation via camera.\n6/3/13-JBH forwarded estimate\n6/4/13-JE approved moving ahead\n6/11/13 - JBH due on site\n6/12/13 - JBH on site, completed camera inspection, awaiting\nreport/disc.\n6/21/13 - Report/Disc forwarded to Beaudin Ganze, awaiting\nreport\n7/8/13 - Report due 7/8/13\nRepair Pool/Spa (29) -\nStart\nEnd\nTotal Est. Cost\n$12,600.00\n5/9/13 - Vendor on site\nNotes\n5/16/13 - Bid breakdown forwarded to RK\nJE requested work be completed in Sept\nPhoto\nEFTA01124659\n", "char_count": 1348}, {"efta_number": "EFTA01124657", "page_number": 3, "text_content": "Zorro Projects - 6/29/13\nWater Sample of Tap Water-\nStart\n6/12/13\nEnd\nTotal Est. Cost\nNotes\nPhoto\n4/27/13-JE requested water samples be taken.\nThis will be completed once water system is balanced\n5/10/13 - Dakota RO is down, pressure issues\n6/2/13 - All Wells up and running\n6/12/13 - Water samples taken. Results due back 7/3/13\nExterior Doors Main House - Three B's\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\n4/27/13-JE requested that all saddles on exterior doors be\nadjusted so doors will close correctly. Will be completed once\nTerraces etc. complete\n7/2/13 - Final Punch Out to begin of all outstanding work\nAudio Upgrade-In House\nNew TV's\nStart\n6/3/13\nEnd\nTotal Est. Cost\nNotes\nPhoto\nInstalled - final programming required\nDVD Players/Theater Upgrade\nKitchen Table Electrical - (35) - Three B's\nElectrical & Data Cut In - $2,160.00\nStart\nEnd\nTotal Est. Cost\n6/3/13\nInstalled - Programming of remotes required\n5/14/13 - Awaiting replacement receiver for Gym before moving\nforward\n5/24/13 - Receiver on site\n6/3/13-Work to begin\n6/7/13 - Work 80% complete in Gym, Breakfast Rm, Lodge & BH\n6/12/13 - Gym, Lodge & BH Systems Complete\n6/14/13 - Will exchange the Samsung DVD for a Marantz DVD in\nBreakfast Rm\n6/22/13 - Awaiting delivery of Marantz DVD\n6/27/13-Unit has shipped\nNotes\n3/1/13 - Bid received Lead Time 1 Week\n6/3/13- Project Started\n6/7/13 - Under floor conduit due to be completed 6/12/13\n6/13/13 - Conduit installed, tiles replaced & grouted. Cat 5 still to\nbe pulled and punched down\nPhoto\nEFTA01124660\n", "char_count": 1516}, {"efta_number": "EFTA01124657", "page_number": 4, "text_content": "Zorro Projects - 6/29/13\nMedia Room Curtains (24) -\nBlackout & Rings\nStart\n2/24/13\nEnd\nTotal Est. Cost\n$6,262.08\nNotes\nPhoto\n4/27/13 - JE selected fabric\n5/10/13 - Project Request forwarded to JE & RK\n5/17/13 - Resent Project Request to JE\n5/31/13 - AWAITING DIRECTION\nSarah's Office Curtains (25) -\nLined & Rings\nStart\n2/24/13\nEnd\nTotal Est. Cost\n$2,527.01\nNotes\nPhoto\n4/27/13 - JE selected fabric\n5/2/13 - Vendors/manufacturer cannot provide enough yardage\nof selected fabric\n5/9/13 - Another fabric option forwarded to JE\n5/10/13 - Project Request forwarded to JE & RK\n5/17/13- Resent Project Request to JE\n5/31/13- AWAITING DIRECTION\nGym-Mirrored Doors - Three B;s\nStart\n2/24/13\nEnd\nTotal Est. Cost\nNotes\nPhoto\n3/4/13 Project Complete. JE requested further work, which will\nbegin once Project 27 - Terraces complete\n7/2/13 - Final Punch Out to begin of all outstanding work\nPhones Main House (31) -\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\n4/27/13-JE approved installation of new phones at MH\nAwaiting for service provision & estimated cost of delivery of\nservices - Project 21 Microwave & IT\n6/22/13 - Awaiting response from Southwestern Wireless on FCC\nLicense Application & Router at MH\n6/28/13-Requested RK to forward deposit\nPhones Ranch Central (35) -\nStart\nEnd\nTotal Est. Cost\nNotes\nPhoto\n6/21/13 - Will forward proposal for phone system by 6/28/13\n6/27/13 - Project On Hold until Microwave solution resolved\nEFTA01124661\n", "char_count": 1430}, {"efta_number": "EFTA01124657", "page_number": 5, "text_content": "Zorro Projects - 6/29/13\nMicrowave & IT - (21) -\nStart\nEnd\nTotal Est. Cost\nNotes\n4/27/13-JE requested to investigate Microwave option\n5/9/13 - Existing Microwave details forwarded to JE, RK & JR,\nawaiting direction\n5/16/13-JE requested contacting Dava Baumann reference\ndelivery of service from Sandia Crest verses D Mark\n5/17/13 - Dava Baumannhas forwarded details of RSM Craig\nFranck. Brice has been in contact with Craig will forward details\n5/24/13 - Received bid from Southwestern Wireless, have call set\nup for 5/28/13 to review bid\n5/31/13 - Brice forwarded an update of Project to JE, RK & JR\n6/8/13 - Forwarded TW Telecom Proposal for Delivery of Services\nto JE & RK. Firm Bids due by 6/14/13\n6/14/13 - Received bid from Southwestern Wireless, confirming\ndetails before forwarding\n6/15/13 -Informed JE, will forward once all details confirmed\n6/20/13-JE approved South Western Wireless bid. RK to\nnegotiate final bid\n6/27/13- Southwestern Wireless unable to delivery bundled T1\n6/28/13 - Looking into options\nCell Repeaters & Wi-Fi - In House\nStart\nEnd\nTotal Est. Cost\nNotes\nCell Repeater-Library\nCell Repeater-Gym\nWill have installed when time allows\nWill have installed when time allows\nComputers-\nStart\nEnd\nTotal Est. Cost\nNotes\nLap Top - Lodge\nDesk Top - RC Office\nRequesting Approval to Purchase\nRequesting Approval to Purchase\nWell K (37) -\nStart\nEnd\nTotal Est. Cost\nNotes\nPlugging First Hole\n$15,000.00 Estimate to plug 1st hole\nLodge Roof\nStart\nEnd\nTotal Est. Cost\nNotes\nRepair/Replace Broken Sections\nThree B's will complete after summer visit\nPhoto\nEFTA01124662\n", "char_count": 1581}, {"efta_number": "EFTA01124657", "page_number": 6, "text_content": "Yurt - (23) -\nReplacement Walls/Roof/Door/Windows 5/9/13\nZorro Projects - 6/29/13\nStart\nEnd\nTotal Est. Cost\n$6,355.00\nplus shipping\ncharges of\napprox.\n$480.00\nNotes\n4/27/13 - JE approved investigating options\n5/9/13 - Project Request forwarded to RK & JE\n5/9/13 - JE approved Project, awaiting direction on deposit\npayment from RK\n5/13/13 - Deposit forwarded to vendor $3,177.50\nRemoval of furniture, deconstruction of existing\nwalls/roof/windows & door. Then reconstruction of base,\nresanding/sealing floor required - in house\n7/3/13 - Scheduled Ship Date\nRepair/Painting Work-lon\nStart\nEnd\nTotal Est. Cost\nPainting/Staining/Sealing - In House\nStables - including outside/inside lights\nAdobe - including wooden deck & front\nLog Cabin\nLodge\nReservoir\nFuel Storage Tanks\nStart\nEnd\nTotal Est. Cost\nNotes\n5/7/13 - E Mailed Photos to JE showing work required\n5/23/13-Forwarded all work details to lon, including work that\nwill be required after MBR Terrace is completed.\n6/29/13 - Additional work - sign on Adobe\nNotes\nWork to begin once MH projects complete\nWork to begin once stables complete\nWork to begin once all painting/staining projects complete at RC\nWork to begin once all painting/staining projects complete at RC\nWork be begin once all painting/staining/sealing projects complete\nWork to begin once all painting/staining/sealing projects complete\nWork scheduled for Winter\nRC Office Interior\nRC Mechanical Bays - interiors\nWork scheduled for Winter\nRC Garages-interiors\nWork scheduled for Winter\nEFTA01124663\n", "char_count": 1517}, {"efta_number": "EFTA01124657", "page_number": 7, "text_content": "Zorro Projects - 6/29/13\nExt Doors Main Compound - In House\nFront, Estancia, Mech, Garage, Pool Doors 6/24/13 6/28/13\nFuel Storage Tank Area - In House\nRemoval of grass. Matting & edging to be\ninstalled\nGravel/Edge Work RC Paths - In House\nAll paths to be dug out, edged and gravel\nto be installed\nLog Cabin - In House\nStep Outside-Repair/Replace Broken\nSection\nCaboose-In House\nInstallation of Retaining Wall\n4 Bay Garages-In House\nRepair Leaking Roof\nRepair Damaged Wall\nIIIIIIIIII\nEnd\nTotal Est. Cost\n$60.00\nNotes\n6/24/13 - Project Started - refurbish & waxing all wooden doors\n6/28/13 - Project Complete - attached photos\nEnd\nTotal Est. Cost\nNotes\nEnd\nTotal Est. Cost\nNotes\nEnd\nTotal Est. Cost\nNotes\nEnd\nTotal Est. Cost\nNotes\nTo begin early Fall\nEnd\nTotal Est. Cost\nNotes\nTo begin early Fall\nPole Barn Water Truck Parking\nEnd\nTotal Est. Cost\nNotes\nInstallation of a Retaining Wall\nTo begin late Fall, Early winter\nCattle Gates/Guards x 3 - In House\nEnd\nTotal Est. Cost\nNotes\nRefurbishment, Empty & Paint\nTo begin early Fall\nCactus Removal - In House\nEnd\nTotal Est. Cost\nNotes\nTo begin late Fall, early Winter\nTilt Trailer-In House\nEnd\nTotal Est. Cost\nNotes\nRefurbish/Paint\nWinter Project\nEFTA01124664\n", "char_count": 1205}, {"efta_number": "EFTA01124657", "page_number": 8, "text_content": "Zorro Projects - 6/29/13\nVehicles\n2013 Ford Expedition - review Captain\nSeats to be installed\nStart\n3/27/13\nEnd Total Est. Cost\nNotes\n5/2/13 - Estimate received - $11,528.74\n5/31/13 as of date unable to get a 2nd estimate,\nDogs\nStart\nEnd\nTotal Est. Cost\nNotes\nInventory/Clean Work Shops - In House\nPurchases\nOutside Pool Furniture\nPool Pace Clock\nLarge Chrome Pool Clock\nFacial Machine\nWells-Dakota & K\nCombined Usage as of date 6/14/13\n2014 Budget\nBunkhouse\nWindow/Doors - Total Replacement\nStart\nEnd\nTotal Est. Cost\n6/6/13\n4/27/13-JE approved investigating purchase of 2 dogs.\nResearching\nNotes\n6/20/13- Landscaping, Paint & Wash Bay 90% complete -\nattached photos. All these location will be painted over the winter\n6/21/13 - Work continues as time allows - complete clean up &\ninventory of all work shops at RC & MH\n6/29/13- Landscaping, Paint, Irrigation & Wash Bay Complete.\nWelding, Woodshop, Mech Shop 80% complete\nStart\nEnd\nTotal Est. Cost\nNotes\nInvestigating Options\n7/10/13 - Due on site\nInvestigating Options\nto purchase\nStart\nEnd\nTotal Est. Cost\n8.03 afa\nNotes\nEFTA01124665\n", "char_count": 1087}]}