{"efta_number": "EFTA01123795", "page_count": 33, "url": "https://epstein-data.com/EFTA01123795", "pdf_url": "https://epstein-data.com/pdf/EFTA01123795.pdf", "pages": [{"efta_number": "EFTA01123795", "page_number": 0, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nDESCRIPTION\nCERTIFICATION COMPLIANCE\nA/C: B737-7001GW\nREG.: VP-BBJ\nS/N: 29273\nDOCUMEN 98XN9-102\nDATE: 7/6/99\nSCOPE: All modification carried out within the project 98XN9 is subject to approval under FAR 25, Amdt. 77. The basic aircraft is certified under FAR 25.\nDEPTETAVISTON AG DATE:\nEngineering Department\nPREPARED:\nЛ.Ви\n7/6/99\nDEPT. BET CXPTION AG DATE:\n7/6/99\nDEPT.:\nDATE:\nEngineering Department\nCHECKED:\nAPPROVED:\nSeite 1\nEFTA01123795\n", "char_count": 633}, {"efta_number": "EFTA01123795", "page_number": 1, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\n1. SYSTEM DESCRIPTION\n2. STRESS REPORT\n3. GROUND CHECK\n4. FLIGHT CHECK\n5. DRAWING\n6. STC\n7. ANALYSIS\n2\n3\n4\n5\n6\n8. AA INSPECTION\n8\n9. ENGINEERING ORDER\n9\n10. LISTS\n10\n11. AFM SUPPLEMENTS\nDEPT.ET N AG DATE:\nEngineering Department\nPREPARED:\n1. B\n11\n7/6/99\nMOC CODES USED IN CCS\nDEPTJET AVIATION AG DATE:\nEngineering Department\nCHECKED:\nSeite 2\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nDESCRIPTION\n7/6/99\nDEPT.:\nAPPROVED:\n:\nDATE:\nEFTA01123796\n", "char_count": 592}, {"efta_number": "EFTA01123795", "page_number": 2, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nDESCRIPTION\nREVISION STATUS\nREV. NO\nPAGES\nDESCRIPTION\nIR\nALL\nREMARKS\nDATE\nInitial Release 7/6/99\nAG DATE:\n7/6/99\nDEPT.: JET AVIATION AGDATE:\nEngineering Department\n7/6/99\nDEPT.:\nBut\nCHECKED:\nDEPT.: JET 4\nEngineering Department\nPREPARED:\nSeite 3\nD:/\nAPPROVED:\nDATE:\nEFTA01123797\n", "char_count": 472}, {"efta_number": "EFTA01123795", "page_number": 3, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n3/10/99\nMOC DOCUMENT\nFAR 25.29 Empty weight and corresponding center of gravity\n7 Weight and Balance Report MK-14M\nDESCRIPTION\n(a,b) A new weighing will be done after\nmodification. A new Weight and Balance Report\nreflects the new center of Gravity.\nDEPT. ET DATE:\nEngliteering Apartment\nPREPARED:\n7/6/99\nDEPT. 3ET AVIATION AG DATE:\n7/6/99\nDEPT.:\nDATE:\nJ. Bu\nEngineering Department\nCHECKED:\nAPPROVED:\nSeite 4\nEFTA01123798\n", "char_count": 595}, {"efta_number": "EFTA01123795", "page_number": 4, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.301 Loads\nA/C: B737-700IGW\nDEPTET AVIATION AG\nEngineering\nPREPARED:\nDATE:\n7/6/99\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n2\n3\nStress Report 98XN9-104\nGroundcheck: 98XN9-105-01\n98XN9-105-02\n98XN9-105-03\n98XN9-105-04\n98XN9-105-05\n98XN9-105-06\n98XN9-105-07\n98XN9-105-08\n98XN9-105-09\n98XN9-105-10\n98XN9-105-11\n98XN9-105-12\nDESCRIPTION\n(a-c) The following load conditions are\ntaken into account:\nUpward 3.0g, Foreward 9.0g,\nSideward 3.0g and 4.0g on seats,\nDownward 6.0g and Rearward 1.5g.\nGust Load Conditions and Decompression\nLoads.\nThe whole installation is calculated and\ntested on ground and in flight.\n4 Flightcheck: 98XN9-109-01\n98XN9-109-02\n98XN9-109-03\n98XN9-109-04\n98XN9-109-05\n98XN9-109-06\n98XN9-109-07\n98XN9-109-08\n98XN9-109-09\n98XN9-109-10\n98XN9-109-11\n98XN9-109-12\n7\nWeight and Balance Report MK-14 M\n10 Supp. Equi. List MK-10M\nDEPTJET AVIATION AG DATE: 7/6/99\nEngine na Department\nCHECKED:\nDEPT.:\nSeite 5\n3:4\nAPPROVED:\nDATE:\nEFTA01123799\n", "char_count": 1092}, {"efta_number": "EFTA01123795", "page_number": 5, "text_content": "S/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nJET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.303 Factor of safety\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\n2 Stress Report 98XN9-104\nDESCRIPTION\nThe Stress Report considers the factor\nof safety. The factor 1.5 is included\nin the ultimate loads. They are multiplied\nby the following fitting factor:\nFurniture: fs=1.15\nDEPT.JET AVIATION AGDATE:\nEngineering Department\n7/6/99\nDEPT.: JET AVIATION AGDATE:\n7/6/99\nDEPT.:\nDATE:\nPREPARED:\nЛВ М\nEnginering Department\nCHECKED:\nAPPROVED:\nSeite 6\nEFTA01123800\n", "char_count": 613}, {"efta_number": "EFTA01123795", "page_number": 6, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.305 Strength and deformation\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n2 Stress Report 98XN9-104\nGroundcheck: 98XN9-105-01\n98XN9-105-02\n3\nDESCRIPTION\n(a) No interference with safe operation.\n(b) The proof of strengh is shown in the\nstress report.\n(c-f) N/A for this modification\nDEPT.\nTJET AVIATION AG DATE:\n7/6/99\nDEPT.:\nEngineering Department\nPREPARED:\n98XN9-105-03\n98XN9-105-04\n98XN9-105-05\n98XN9-105-06\n98XN9-105-07\n98XN9-105-08\n98XN9-105-09\n98XN9-105-10\n98XN9-105-11\n98XN9-105-12\n4 Flightcheck: 98XN9-109-01\n98XN9-109-02\n98XN9-109-03\n98XN9-109-04\n98XN9-109-05\n98XN9-109-06\n98XN9-109-07\n98XN9-109-08\n98XN9-109-09\n98XN9-109-10\n98XN9-109-11\n98XN9-109-12\n5 J.A. DWG:\nMK-01M\n\"JET AVIATION AG DATE:\nEngineering Department\nCHECKED:\nSeite 7\n7/6/99\nDEPT.:\nAPPROVED:\nDATE:\nEFTA01123801\n", "char_count": 940}, {"efta_number": "EFTA01123795", "page_number": 7, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.307 Proof of structure\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nRefer to FAR 25.305\nFAR 25.321 General - Flight loads\nRefer to FAR 25.301 and 25.305\nFAR 25.331 General - Flight Maneuver and gust conditions\nRefer to FAR 25.301 and 25.305\nDATE:\n7/6/99\nDEPT.:JET AVTION AGDATE: 7/6/99\nEngineering Department\nDEPT.:\nCHECKED:\nDEPT. JET AVIATION AG\nEngineering Department,\nPREPARED:\nJ. B\nSeite 8\nDESCRIPTION\n(a-c) The strength of the main structure is\nnot influenced by this modification.\nAll structural installations are performed\nin accordance with standard practice set\nforth in FAA AC43.13-1A&2A.\n(d) Refer to FAR 25.305\nnay\nAPPROVED:\nDATE:\nEFTA01123802\n", "char_count": 812}, {"efta_number": "EFTA01123795", "page_number": 8, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.341 Gust and turbulence loads\nA/C: B737-700IGW\nREG.: VP-BBJ\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nRefer to FAR 25.301 and 25.305\nDESCRIPTION\nFAR 25.365 Pressurized compartment loads\nAmdt 25-0\nRefer to FAR 25.301 and 25.305\nFAR 25.471 General - Ground loads\nDEPT ET AVIATION AG DATE:\nEngineering Department\nPREPARED:\nJ. B\nRefer to FAR 25.301 and 25.305\n7/6/99\nDEPT JET AVIATION AG DATE: 7/6/99\nEngineering Department\nCHECKED:\nSeite 9\nDEPT.:\nED:\nAPPROVED:\nDATE:\nEFTA01123803\n", "char_count": 606}, {"efta_number": "EFTA01123795", "page_number": 9, "text_content": "ISSUED DATE:\nJET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nREG.: VP-BBJ\nAMDT. 25-77\nMOC DOCUMENT\nFAR 25.561 General-Emergency landing conditions\nAmdt 25-59\n9 Eng. Order:\n98XN9-250000\n2\nStress Report 98XN9-104\n10 Supp. Equip. List MK-10M\nDESCRIPTION\nIR\n06.07.99\n(a-c) Refer to 25.301 for load factor.\n(d) Seats are existing or TSO C127 approved\nby AMP.\nAll items of mass are attached to structure\ntaking the focres mentioned in b (3) into accoun\nor are stowed in an adequate manner.\nFAR 25.562 Emergency Landing Dynamic Conditions\n10 Supp. Equip. List MK-10M\n2 Stress Report 98XN9-104\n(a),(b),(c),(1),(2),(3),(4),(7),(8)\nAll seats and divans occupied for take-off\nand landing are TSO C127 approved.\nFlight Attendant Seats are TSO C127 approved.\nDEPT.:JET AVIATION AG DATE:\nEngineering Departmen\nPREPARED:\nDe Departm\n06.07.99\nDortment\nDEPT.: JET AVIATION AGDATE: 06.07.99\nEngine\nDEPT.:\nDATE:\nCHECKED:\nAPPROVED:\nSeite 10\nEFTA01123804\n", "char_count": 1018}, {"efta_number": "EFTA01123795", "page_number": 10, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.571 Damage Tolerance and Fatigue Evaluation\nof Structure\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nAmdt. 25-0\nto 25-77\n2 Stress Report 98XN9-104\nDESCRIPTION\n(a-e) A Damage Tolerance Report is provided\nfor all antenna installations.\nFAR 25.581 Lightning protection\n10 Mech. Master Dwg. List MK1-01M\n(a-b) All installed metallic components are\nbonded to the airframe as noted on\ndwg.\nDEPT BET AVIATION AG DATE:\n7/6/99\nDEPT. ET AVIATION AG DATE:\n7/6/99\nDEPT.:\nDATE:\nEngineering Department\nEngineering Department\nPREPARED:\nCHECKED:\nAPPROVED:\nSeite 11\nEFTA01123805\n", "char_count": 719}, {"efta_number": "EFTA01123795", "page_number": 11, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n10 Supp. Equip. List MK-10M\nGroundcheck: 98XN9-105-01\nFAR 25.601 General Design and construction\n3\n98XN9-105-02\n98XN9-105-03\n98XN9-105-04\n98XN9-105-05\n98XN9-105-06\n98XN9-105-07\nDESCRIPTION\nAll items are NAS/AN/MS-Standard or\nTSO approved and installed in accordance\nwith practices set forth in FAA AC43.13-1A\n&2A.\nThe whole installation is tested on ground\nand in flight.\n98XN9-105-08\n98XN9-105-09\n98XN9-105-10\n98XN9-105-11\n98XN9-105-12\nFlightcheck: 98XN9-109-01\n98XN9-109-02\nDEPT.:JET AVIATION AGDATE:\n7/6/99\nDEPT.: JET ANATIONSACDATE:\nEngineering Department\nEngineering Department\nPREPARED:\nM.B\nCHECKED:\nSeite 12\n98XN9-109-03\n98XN9-109-04\n98XN9-109-05\n98XN9-109-06\n98XN9-109-07\n98XN9-109-08\n98XN9-109-09\n98XN9-109-10\n98XN9-109-11\n98XN9-109-12\n7/6/99\nDEPT.:\nD. Boy Ba\nAPPROVED:\nDATE:\nEFTA01123806\n", "char_count": 990}, {"efta_number": "EFTA01123795", "page_number": 12, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.603 Materials\nA/C: B737-7001GW\nREG.: VP-BBJ\nFAR 25.605 Fabrication methods\nFAR 25.607 Fasteners\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n10 Supp. Equip. List MK-10M\n10 Mech. Master Dwg. List MK1-01M\nDESCRIPTION\n(a-c)All Hardware is NAS/AN/MS-Standard\napproved and installed in accordance\nwith practices set forth in FAA AC43.13-1A\n&2A.\nMajor componants are\nevaluation and/or testing.\nor approved by\nJ.A. Process Specifications\n(a-b) Only approved fabrication methods\nare used. Specified in the J.A. Process Spec.\nand in accordance with practices\nset forth in FAA AC43.13-1A & 2A.\n10 Supp. Equi. List MK-10M\nMech. Master Dwg List MK1-01M\n2 Stress Report 98XN9-104\n(a-c) All Hardware is NAS/AN/ MS-Standard\napproved.\nLocking devices are used in accordance\nwith practices set forth in FAA AC43.13-1A\n&2A.\nMajor componants are\nevaluation and/or testing.\nor approved by\nDATE:\n7/6/99\nDEPT.: JET AVIATION DATE:\nEngineering ng\n7/6/99\nDEPT.:\nCHECKED:\nET AVIATION AG\nDEPT.:\nPREPARED:\nEngineering Departmen\nart fl\nSeite 13\nDATE:\nAPPROVED:\nAin and\nEFTA01123807\n", "char_count": 1179}, {"efta_number": "EFTA01123795", "page_number": 13, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.609 Protection of structure\nFAR 25.611 Accessibility provisions\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\n10 Mech. Master Dwg List MK1-01M\n10 Mech. Master Dwg List MK-01M\nDESCRIPTION\n(a) The whole installation is protected\nin accordance to the standards of SRM\nor as noted on the dwg.\n(b) Ventilation and drainage is installed\nwhere necessary.\nThe accessability is applied for the\nwhole modification.\nFAR 25.613 Material strength properties and design values\n2 Stress Report 98XN9-104\n10 Mech. Master Dwg List MK-01M\nSupp. Equip. List MK-10M\n(a-e) All Hardware is NAS/AN/ MS-Standard\napproved.\nAll values and strength properties are based\non experience, tests and the Stress Report.\nMajor componants are or approved by\nevaluation and/or testing.\nFAR 25.619 Special factors\nDEPT.:\nJET AVIATION AG\nPREPARED:ering Departme\nDATE:\nJBM\n2\nStress Report 98XN9-104\n(a-c) All special factors are applied in the\nStress Report.\n7/6/99\nDEPT.:\nDATE:\n7/6/99\nDEPT.:\nDATE:\nJ\nCHECKED:\nAPPROVED:\nSeite 14\nEFTA01123808\n", "char_count": 1156}, {"efta_number": "EFTA01123795", "page_number": 14, "text_content": "S/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nJET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.623 Bearing factor\nA/C: B737-7001GW\nREG.: VP-BBJ\nMOC DOCUMENT\n2 Stress Report 98XN9-104\nFAR 25.625 Fitting factors\nAmdt 25-59\n2 Stress Report 98XN9-104\nFAR 25.771 Pilot Compartment\nFAR 25.772 Pilot Comprtment Doors\nDEPTJET AVIATION AG DATE:\nEngineering Department\nPREPARED:\nJ. Bi\nDESCRIPTION\n(a-b) All bearing factors are applied in the\nStress Report.\n(a-c) The whole installation is based on\nexperienced designs and approved data.\nAll factors are applied in the Stress Report.\n(d) Each seat and berth is\nTSO C127 approved by AMP.\n4 Flightcheck: 98XN9-109-01\n5 Floorplan 250010-01/98XN9\n(a-d) No Change to basic aircraft\n(e)Vibritions and noise characteristics are taken\ninto account for all cockpit installation and\ntested during flight.\n(a-b) No change to basic aircraft\n7/6/99\nDEPT.:JET AVIATION AGDATE:\nEngineering Department\n7/6/99\nDEPT.:\nDATE:\nCHECKED:\nAPPROVED:\nSeite 15\nEFTA01123809\n", "char_count": 1047}, {"efta_number": "EFTA01123795", "page_number": 15, "text_content": "ISSUED DATE:\nJET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.777 Cockpit Controls\nA/C: B737-7001GW\nS/N:\n29273\nREV.:\nREG.: VP-BBJ\nAMDT. 25-77\nMOC DOCUMENT\nFAR 25.783 Doors\nProject Description 98XN9-500\n92\n2\nEng. Order: 98XN9-250000\nStress Report 98XN9-04\nDESCRIPTION\nIR\n06.07.99\n(a-h) The cockpit controls are not affected by\nthe cockpit modification.\n(a-i) No change to basic aircraft\nAll lavatory doors are designed frangible\nFAR 25.785 Seats, berths, safety belts, and harnesses\nAmdt 25-59\n7\nBurn Test Report 98XN9-107-01\n9\nEng. Order: 98XN9-250000\nFAR 25.787 Stowage compartments\nDEPT.: JET AVIATION ACDATE:\nEngineering Department\nPREPARED:\nAt Bith\n06.07.99\n10 Supp. Equip. List. MK-10M\n2 Stress Report 98XN9-104\n10 Supp. Equi. List MK-10M\nMech. Dwg List MK-01M\nDEPT. JET AVIATION AC\nEnginering DepartmenDATE:\nCHECKED:\n06.07.99\nDEPT.:\nAPPROVED:\n(a-b) For each occupant a seat will be pro-\nvided with operating placards and descrip-\ntion in the Outfitting Manual.\n(c) All Seats and Divans are TSO C127\napproved by AMP, if intended for TOL. The\ncover material and foam is tested and listed\nin the Burn Test Report.\n(d-I) Each safety belt and harness is exis-\nting BOEING, TSO C39 or C127approved by\nAMP or manufactured in accordance with TSO\napproved production method.\n(a-b) The stowage comply with this para-\ngraph, based on experienced designs and\nthe Stress Report.\n(c) All used compartment lamps are TSO\napproved.\nKin man\nDATE:\nSeite 16\nEFTA01123810\n", "char_count": 1514}, {"efta_number": "EFTA01123795", "page_number": 16, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\nFAR 25.789 Retention of items of mass in passenger and\nCrew compartment and galleys\n10\n9\nMech. Master Dwg List MK-01M\nEng. Order: 98XN9-250000\n2 Stress Report 98XN9-104\nFAR 25.791 Passenger information sings and placards\n5 J.A. DWG.:\n110010-01/98XN9\n332550-01/98XN9\n332550-02/98XN9\n332550-01/98XN9\nFAR 25.793 Floor surfaces\nFAR 25.801 Ditching\n9 Eng. Order 98XN9-250000\nDESCRIPTION\n(a) The installation is based on experienced\ndesigns and all items of mass are attached\nand secured and tested on gound and in\nflight. All galley storage compartments are\nsecured with double latching system.\n(b) Each interphone is designed to remain\nin the existing position.\n(a-e) All required Signs and Placards are\ninstalled and shown on these Dwg's and/or\nmentioned in the Eng. Order.\n7\nBurn Test Report 98XN9-107-01\n10 Supp. Equip. List. MK-10M\nFor all areas slip resistant carpets\nare used. In the galley area, a non-slip\nnon-conductive wet carpet is installed for\nhygenic purpose.\nAll installed floor cover materials are tested\nand listed in the Burn Test Report.\nNo change to A/C\n(a-e) No change to the ditching characteristic\nof the A/C. Ditching equipment is provided\nas required.\nDEPT.: JET AVIATION AG DATE:\n7/6/99\nDEPT.:\nEngineering\nPREPARED:\nR. Bitte\nJET AVIATION\nEnginearing Dev\nCHECKED:\nDATE:\n7/6/99\nDEPT.:\nAPPROVED:\nD.\nSeite 17\nDATE:\nEFTA01123811\n", "char_count": 1540}, {"efta_number": "EFTA01123795", "page_number": 17, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.803 Emergency evacuation\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n5 J.A. Dwg:\n250010-01/98XN9\nFAR 25.807 Passenger emergency exits\n5 J.A. Dwg:\n250010-01/98XN9\nDESCRIPTION\n(a-c) This modification reduces the number\nof occupants compared B737-700.\n(d-e) Access to the emergency exit is\nprovided with respect to FAA Exemption\nNo. 6820A.\n(a) No change in the dimensions of the basic\nemergency exits.\n(b) No change in the step down distance.\n(c) N/A\n(d) The remaining number of emergency exits\nare sufficient to apply to this paragraph.\nFAR 25.809 Emergency exit arrangements\n5 J.A. Dwg:\n250010-01/98XN9\n(a-h) No change to basic A/C.\nDEPT.SET AVIATION AG DATE:\n7/6/99\nDEPT.\nEngineering Department\nPREPARED:\nEngineering Department\nCHECKED:\nT-JET AVIATION AG-DATE:\n7/6/99\nDEPT.:\nDATE:\nAPPROVED:\nSeite 18\nEFTA01123812\n", "char_count": 970}, {"efta_number": "EFTA01123795", "page_number": 18, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.811 Emergency exit marking\nFAR 25.812 Emergency lighting\nDEPT.: JET AVIATION AG DATE:\nEngineering Depynt\nPREPARED:\nSt.Bu\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n9 Eng. Order: 98XN9-250000\nDESCRIPTION\n(a) Each Emergency Exit is marked.\n(b) The identity and location of each passen-\nger emergency exit is recognisable from\na distance equal to the width of the cabin.\n(c) Means is provided.\n(d) The location of each passenger emer-\ngency exit is indicated by a sign visible\nto occupants approaching along the main\npassenger aisle.\n(e-f) No change to basic T/C.\n(g) The wording of the emergency exit\nsign is in english.\n93\n3\nEngineering Order 98XN9-250000\nGroundcheck: 98XN9-105-01\n5\nJ.A. Dwg.:\n98XN9-105-05\n335050-01/98XN9\n335050-02/98XN9\n335050-03/98XN9\n335051-01/98XN9\n335051-02/98XN9\n335051-03/98XN9\nLighting Level Analysis 98XN9-103-L\nTransverse Seperation Analysis 98XN9-103\n(a) Emergency lighting is installed.\n(b) Emergency Exit signs are manufactured\nto meet the requirements of this subchapter.\n(c) The general illumination in the passenger\ncabin along the centerline of main passen-\nger aisle is at seat armrest height and at\n40 inch intervals not less than 0.05 ft/cd.\n(d) The illumination of not less than\n0.02 ft/cd at the floor level leading to each\nemergency exit is given.\n7/6/99\nDEPT.:\nNET AVIATION DATE:\n7/6/99\nDEPT.:\nEngineering\nCHECKED:\nAPPROVED:\nSeite 19\nDATE:\nBran\nEFTA01123813\n", "char_count": 1558}, {"efta_number": "EFTA01123795", "page_number": 19, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.812 Emergency lighting\n)\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n5 J.A. Dwg.:\n335052-01/98XN9\n335052-02/98XN9\n335052-03/98XN9\n335052-04/98XN9\n335053-01/98XN9\n335053-02/98XN9\nDESCRIPTION\n(e) Floor proximity emergency escape\npath marking is installed.\n(f-k) No change to basic T/C.\n(1) The emergency lighting system is\ninstalled in accordance with the FAR\nrequirements.\n335052-03/98XN9\n335053-04/98XN9\n335054-01/98XN9\n335054-02/98XN9\n335054-03/98XN9\n335054-04/98XN9\n335054-05/98XN9\nFAR 25.813 Emergency exit access\n5 J.A. Dwg.:\n250010-01/98XN9\nFAR 25.815 Width of aisle\n5\nJ.A. Dwg.:\n250010-01/98XN9\n(a-f) Access to each Emergency Exit is\nprovided. The RHS Emergency Exit Hatch\nis slightly obstructred, but this exit is not required\nas per FAA Exemption No. 6820A.\nThe width of aisle is applied in the\narrangement of this modification.\nFAR 25.817 Maximum number of seats abreast\nDEPTET AVIATION AG DATE:\nEngineering Departm\nSpart\nPREPARED:\n5\nJ.A. Dwg.:\n250010-01/98XN9\n7/6/99\nDEPT.: JET AVIATION ACDATE:\nEngineering\n7/6/99\nDEPT.:\nCHECKED:\nAPPROVED:\nSeite 20\nThe number of seats abreast (max.2) are\nconsidered in the arrangement of this\nmodification.\nDATE:\nEFTA01123814\n", "char_count": 1325}, {"efta_number": "EFTA01123795", "page_number": 20, "text_content": "S/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nJET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.831 Ventilation\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\n10 J.A. Dwg.list: MK-01M\n9 Eng. Order: 98XN9-250000\nDESCRIPTION\n(a) Is complied by the modification.\n(b-c) No change to the basic system.\n(e-f) System is described in the Eng.\nOrder.\nFAR 25.841 Pressurized cabins\n4 Flight Check: 98XN9-109-01\n10 Mech. Master Dwg List MK-01M\nFAR 25.851 Fire extinguishers except (b)\n5\nJ.A. Dwg:\n256010-01/98XN9\n9\nEng. Order: 98XN9-250000\n(a) Due to the antenna installation a\npressurization test in the cabin is performed.\n(b) No change to valves, controles, and\nindicator for controlling cabin pressure.\nA cabin leak check is performed.\nNew fire extinguishers are installed as shown\nin the drawing mentioned beside.\nDEPT.: JET AVIATION AGDATE:\nEngineering Department\n7/6/99\nDEPT.: JET AVIATION AG DATE:\n7/6/99\nDEPT.:\nDATE:\nPREPARED:\nJ. Bi\nEngineeripan\nCHECKED:\nAPPROVED:\nSeite 21\nEFTA01123815\n", "char_count": 1043}, {"efta_number": "EFTA01123795", "page_number": 21, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.853 Compartment interiors\nA/C: B737-7001GW\nS/N:\n29273\nREV.:\nREG.: VP-BBJ\nAMDT. 25-77\nMOC DOCUMENT\nAmdt 25-32\n5 J.A. Dwg:\n250012-01/98XN9\n7\n9\nBurn Test Report 98XN9-107-01\nEng. Order: 98XN9-250000\nFAR 25.854 Lavatory fire protection except (b)\n9\n5\nJ.A. Dwg.:\nEng. Order: 98XN9-250000\n261650-01/98XN9\nFAR 25.855 Cargo or baggage compartment\nAmdt 25-59\nDEPT.: JET AVIATION AG\nEngineering\nPREPARED:\nDATE:\n06.07.99\nDEPT.:\nJET AVIATION ADATE:\nEngineering Department\n06.07.99\nDEPT.:\nCHECKED:\nAPPROVED:\nSeite 22\nISSUED DATE:\nDESCRIPTION\nIR\n06.07.99\n(a) All materials are TSO approved or/\nand tested and listed in the Burn Test Report.\n(b) Seatcushions are burn tested as per the\nthe specification of this paragraph.\n(d-g) Ashtrays are provided as required.\n(h) Waste containers are fully closed\nand tested.\nEach lavatory is equipped with a smoke\ndetector system, which provides an audible\nwarning in the passenger cabin.\nIn addition, in the VIP bathroom a warning\nlight and an audible warning is installed\nwhich will be readily detected by a flight\nattendant.\nFuel Tanks installed in accordance with Pats\nSTC. No other change to basic T/C.\nB\nDATE:\nEFTA01123816\n", "char_count": 1259}, {"efta_number": "EFTA01123795", "page_number": 22, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.858 Cargo compartment fire detection\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nFAR 25.869 Fire protection: Systems\nDEPT.: JET AVIATION AGDATE:\nEngineering Department\nPREPARED:\nDepartment Bu\nS/N:\n29273\nREV.:\nAMDT. 25-77\nISSUED DATE:\nDESCRIPTION\nIR\n06.07.99\nCargo Fire Protection System Retrofit Kit\ninstalled as per STC ST00405LA-D.\n(a) All electrical items are TSO approved\nor standard materials.\n(b) No change to basic T/C.\n(c) Refer to FAR 25.1453\n06.07.99\nDEPT.JET AVIATION AG DATE: 06.07.99\nDEPT.:\nDATE:\nEngineering Department\nCHECKED:\nAPPROVED:\nSeite 23\nEFTA01123817\n", "char_count": 677}, {"efta_number": "EFTA01123795", "page_number": 23, "text_content": "(\nISSUED DATE:\nJET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1301 General - Function and installation\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nS/N:\n29273\nREV.:\nAMDT. 25-77\n9 Eng. Orders: 98XN9-250000\n10 Conformity list 98XN9-101-E\nAFM Supplement 98XN9-201-01\nGroundcheck 98XN9-105-01/105-02/\n11\n3\n4\n105-03/-04/-05/-06/-07/-08/-09/-10/-11/-12\nFlightchecks: 98XN9-109-01/-02/-03/\n04/05/06/07/08/09/10/11/12\nDESCRIPTION\nIR\n06.07.99\n(a-c) Refer to E.O., equipment description\nand installation details. Refer to AFM\nSupplement for operating limitations.\nRequirements are met by the installation\nof approved systems and materials as per\nTSO, MIL-STD, etc...\n(d) The whole equipment is installed/modi-\nfied in accordance with the Eng. Orders and\ntested on ground and in flight.\nFAR 25.1307 Miscellaneous equipment\nFAR 25.1309 Equipment, systems and installation\n3\nDEPT.: JET AVIATION ACDATE:\nEngineering Department\nPREPARED:\nDoa Burk\nGroundcheck 98XN9-105-01/105-02/\n105-03/105-04/105-05/06/07/08/09/10/\n11/12/\nTransverse Separation Analysis 98XN9-103\nLighting Level Analysis 98XN9-103-L\nEMI Test Plan\n(a-e) No change to basic T/C.\n(a-b) Compliance is shown by analysis, design\nand technical dwg's and testing on ground\nand in flight.\nThe installation and cable routing is made\nin accordance with FAA AC 43.13-2A.\nAll Hardware is MS-Standard approved. Major\nComponents are or approved by\nevaluation and/or testing. The basic T/C has not\nbeen degraded. This compliance is met.\nc) Additional warning indicators are installed\nto alert the crew to Cabin Systems malfunction\nand to enable them to take appropriate correc-\ntive action.\nDATE:\n06.07.99\nDEPT.: JET AVIATION ALDATE:\n06.07.99 DEPT.:\nEngineering Department\nCHECKED:\nAPPROVED:\nSeite 24\nEFTA01123818\n", "char_count": 1806}, {"efta_number": "EFTA01123795", "page_number": 24, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1309 Equipment, systems and installation\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nIR\nREG.: VP-BBJ\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nMOC DOCUMENT\n7\nElectrical Load Analysis MK-11E\nFAR 25.1316 System lightning protection\nFAR 25.1321 Arrangement and visibility\nFAR 25.1322 Warning, caution and advisory lights\nсл\n5\nJ.A. Dwg.:\n3910-500-01/BBJ\n391051-01/98XN9\n391056-01/98XN9\n391058-01/98XN9\nDEPT. JET AVIATION AG\nEnginzang Departmere\nDATE:\n7/6/99\nDEPT.:\nJET AVIATION AG\nEngineering Depetreit\nPREPARED:\nCHECKED:\nDATE:\n7/6/99\nDEPT.:\nMB\nAPPROVED:\nSeite 25\nDESCRIPTION\n(e-f) None of the new systems is to be essen-\ntial. Load shedding complies with philosophy\nset forth in general design practices.\n(g) N/A\n(a-c) No change to basic T/C.\n(a-e) No additional flight navigation and power-\nplant instruments installed. No change to basic\nT/C.\n(a) N/A\n(b) Amber caution lights are installed for\nindicating situations which possibly need\ncorrective action.\n(c-d) Green lights show safe operation.\nDATE:\nEFTA01123819\n", "char_count": 1099}, {"efta_number": "EFTA01123795", "page_number": 25, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1351 General - Electrical system\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\n7 Electrical Load Analysis MK-11E\nFAR 25.1353 Electrical equipment and installations\n9 Eng. Order: 98XN9-250000\nFAR 25.1355 Distribution system\n5 J.A. Electrical Dwg. List MK-01E\nDESCRIPTION\n(a-1) New el. loads are installed in comp-\nliance with drawings based on Electrical Load\nAnalysis. System capacity is not exceeded.\n(a-2) The requirements of FAR 25.1309\nare met.\n(b-c) N/A\n(d) No change to basic T/C.\n(a) Electrical equipment controls and wiring\nare installed so that operation of any unit or\nsystem of units will not adversely affect the\nsimultaneous operation of any other electri-\ncal unit or system essential to the safe opera-\ntion.\n(b) Cables are grouped, routed and spaced\nso that damage to essential circuits will be\nminimized if there are faults in heavy current\ncarrying cables.\nc) No storage batteries installed.\n(a) AC and DC bus distribution covering the\nrequired modification. (Compliance is satis-\nfied)\n(c) None of the installed systems requires\ntwo independent power sources, therefore\nN/A.\nDEPTET AVIATION DATE:\nEngineering Departme\nPREPARED:\n1. Bin\n7/6/99\nDEPT.:\nJET AVIATIONA\nEngineerin\nCHECKED:\nDATE:\n7/6/99\nDEPT.:\nAPPROVED:\nMinann\nSeite 26\nDATE:\nEFTA01123820\n", "char_count": 1420}, {"efta_number": "EFTA01123795", "page_number": 26, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1357 Circuit protective devices\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\n5 J.A. Electrical Dwg. List MK-01E\nFAR 25.1381 Instrument lights\n5\nJ.A. Dwg.:\nDEPT.: JET AVIATION AG DATE:\nEnginearing Deparos\nPREPARED:\nЛ. В\n7/6/99\nDEPT.: JET AVIATIONG DATE:\nEngineerit parte\nB.\nCHECKED:\nSeite 27\n3910-500-01/BBJ\n391051-01/98XN9\n391056-01/98XN9\n391058-01/98XN9\nDESCRIPTION\n(a) All systems connected via appropriate\ncircuit breakers to minimize distress to the\nelectrical system in the event of wiring faults\nor serious malfunction of the system or con-\nnected equipment.\n(b) No change to basic T/C.\n(c) All circuit breakers installed will open\nwhen a fault exists regardless of the position\nof operating control.\n(d) All cabin system circuit breakers are\ninstalled in the cabin CB-Panel, cockpit or\npower distribution CB -Panels and labelled\nin the cockpit.\n(e) No new essential system installed.\n(f) The required number (in this case 2) is as\nspare parts on board.\n(g) N/A\n(a) Sufficient illumination for the Satcom\nSystem Controls, Door Warning Panel, Smoke\nPanel and Master Control Panel is provided.\n(b) New devices are dimmable.\n7/6/99\nDEPT.:\nDATE:\nAPPROVED:\nEFTA01123821\n", "char_count": 1327}, {"efta_number": "EFTA01123795", "page_number": 27, "text_content": "S/N:\n29273\nREV.: IR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nJET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1411 General\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\n10 Supp. Equip. List. MK-10M\n5\nFAR 25.1415 Ditching equipment\nFAR 25.1421 Megaphones\nFAR 25.1423 Public address system\nFAR 25.1431 Electronic equipment\nFAR 25.1439 Protective breathing equipment\nDEPTET AVIATION A DATE:\nEngineering Department\nPREPARED:\n256010-01/98XN9 Emergency equip. layout\n10 Supp. Equip. List. MK-10M\n10 Supp. Equip. List. MK-10M\n5 J.A. Dwg.:\n233150-01/98XN9\n233150-02/98XN9\n233151-01/98XN9\n9\nEng. Orders: 98XN9-250000\n3 Ground Check/EMI Summary\n4 Flight Check/EMI Summary\nDESCRIPTION\n(a-g) Emergency equipment is provided.\n(a-e)Ditching equipment is installed as per the\nrequirements of this paragraph.\nMegaphone installed\n(a-b) Speakers rearranged due to new.\nconfiguratiuon\n(a) Critical environmental conditions are con-\nsidered.\n(b) No radio or electronic equipment installed\nwhich must be supplied under the requirements\nof $25.1355 (c)\n(c) Equipment and wiring installed and kept\nseparate so that simultaneous operating of\nany other radio or electronic unit is not\naffected.\nJET AVIATION AGDATE:\nEngineering partment\ning Danary\n7/6/99\nDEPT.:\nCHECKED:\nSeite 28\n7/6/99\nDEPT.:\nAPPROVED:\nNo modifications have been performed in the\nclass A, B, or E cargo compartments.\nDATE:\nBrowns\nEFTA01123822\n", "char_count": 1429}, {"efta_number": "EFTA01123795", "page_number": 28, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nFAR 25.1441 Oxygen equipment and supply\nFAR 25.1443 Minimum mass flow of supplemental oxygen\nFAR 25.1445 Equipment standards for the oxygen distributing\nsystem\nFAR 25.1447 Equipment standarts for oxygen dispensing units\nFAR 25.1449 Means for determining use of oxygen\nFAR 25.1450 Chemical oxygen generators\nS/N:\n29273\nREV.:\nAMDT. 25-77\nISSUED DATE:\nDESCRIPTION\nIR\n06.07.99\n3\n4\n9\nGroundcheck 98XN9-105-03\nFlightcheck 98XN9-109-03\nEng. Order: 98XN9-250000\nRefer to $25.1450\nRefer to FAR 25.1441\n3 Groundcheck 98XN9-105-03\nFlightcheck 98XN9-109-03\nJ.A. Dwg.:\n3459\n350010-01/98XN9\nEng. Order: 98XN9-250000\n(a) A new passenger oxygen system is\ninstalled during this modification.\n(b-d) No change to basic crew system.\nAll additional Oxygen generators are approved\nequipment.\n(a-e) All additional oxygen equipment is\napproved aircraft equipment.\n(a)No change to basic crew oxygen system.\nPassenger system seperated from crew system\n(b) Portable oxygen bottles are provided.\nNo change to basic T/C.\nNo change to basic T/C.\n(a-c) New Oxygen Generators are installed\nThe oxygen generators are\nmanufactured and certified under\nTSO Approval.\nThe operation of the containers is tested on\nground and in flight.\nDEPT.: JET AVIATION AGDATE:\n06.07.99\nEngineering partment\nDEPT.:JET HATION AGDATE: 06.07.99\nEngineering Department\nDEPT.:\nPREPARED:\nCHECKED:\nAPPROVED:\nSeite 29\nDATE:\nEFTA01123823\n", "char_count": 1519}, {"efta_number": "EFTA01123795", "page_number": 29, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1450 Chemical oxygen generators\nA/C: B737-700IGW\nREG.: VP-BBJ\nFAR 25.1453 Protection of oxygen equipment from rupture\nFAR 25.1455 Draining of fluids subject to freezing\nDEPT.:\nJET AVIATION\nEngineering\nPREPARED:\nDeparta\nS/N:\n29273\nREV.:\nAMDT. 25-77\nIR\n06.07.99\nMOC DOCUMENT\nGroundcheck 98XN9-105-03\nFlightcheck 98XN9-109-03\n3\n4\n9\nEng. Order:\n5\nJ.A. Dwg.:\n98XN9-250000\n352150-01/98XN9\n352151-01/98XN9\n352151-02/98XN9\nISSUED DATE:\nDESCRIPTION\n(a-c) New Oxygen Generators are installed\nThe oxygen generators are\nmanufactured and certified under\nTSO Approval.\n352152-01/98XN9\n352152-02/98XN9\n352153-01/98XN9\n352154-01/98XN9\n352155-01/98XN9\n349\nGroundcheck 98XN9-105-11\nFlightcheck 98XN9-109-11\n9 Engineering Order 98XN9-250000\nN/A\nAll drains are designed and located so that\nno ice can occur on the airplane surface.\nDATE:\n06.07.99\nDEPT.: JET AMATION ADATE: 06.07.99\nEngineoning Department\nDEPT.:\nDATE:\nCHECKED:\nAPPROVED:\nSeite 30\nEFTA01123824\n", "char_count": 1045}, {"efta_number": "EFTA01123795", "page_number": 30, "text_content": "JET AVIATION AG/BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1459 Flight data recorder\nA/C: B737-700IGW\nS/N:\n29273\nREV.:\nREG.: VP-BBJ\nAMDT. 25-77\nMOC DOCUMENT\nFAR 25.1519 Weight, center of gravity and weight distribution\n7\nWeight and Balance Report MK-14M\nFAR 25.1529 Instructions for continued Airwothiness\n9 Eng. Order:\nMaintenance Manual MK-06\n98XN9-250000\nDEPT.:\nDATE:\n06.07.99\nDEPT.:\nJET AVIATION\nPREPARED: Engineering Department\nJETATION AG DATE:\nEngineering Department\nCHECKED:\nнаши\nSeite 31\nIR\n06.07.99\nISSUED DATE:\nDESCRIPTION\nNo change to basic T/C.\nA new Weight and Balance Report will be\nperformed.\nAll necessary description, operation and\nmaintenance of the system are contained in\nthe E.O. and/or part of the Maintenance\nManual MK-06.\n06.07.99\nDEPT.:\nDATE:\nAPPROVED:\nEFTA01123825\n", "char_count": 837}, {"efta_number": "EFTA01123795", "page_number": 31, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nDESCRIPTION\nFAR 25.1541 Markings and placards - General\n9 Eng. Order: 98XN9-250000\n(a) All new systems are marked and labelled\nas required for safe operation.\nFAR 25.1557 Miscellaneous marking and placards\nDEPT. JET AVIATION AG DATE:\nEngineering Department,\nPREPARED:\nSt.\n7/6/99\nDEPT.:\nSETTING DATE:\nEngineongarment\nCHECKED:\nED:\nSeite 32\n(b) No change to basic T/C\n(c) Refer to 25.811\n(d) No change to basic T/C.\n7/6/99\nDEPT.:\nDATE:\nAPPROVED:\nEFTA01123826\n", "char_count": 650}, {"efta_number": "EFTA01123795", "page_number": 32, "text_content": "JET AVIATION AG / BASEL, SWITZERLAND\nCERTIFICATION COMPLIANCE No.: 98XN9-102\nWORDING OF REGULATION\nFAR 25.1561 Safety equipment\nA/C: B737-700IGW\nREG.: VP-BBJ\nMOC DOCUMENT\n5\nJ.A. Dwg:\nS/N:\n29273\nREV.:\nIR\nAMDT. 25-77\nISSUED DATE:\n7/6/99\nDESCRIPTION\n256010-01/98XN9\n9 Eng. Order: 98XN9-250000\n(a-e) Emergency equipment is provided and\nmarked. For locations refer to J.A. DWG.\nFAR 25.1581 General - Airplane flight manuals\n11 AFMS 98XN9-201-01\nFAR 25.1583 Operating limitations\n7 Weight and Balance Report MK-14M\nDEPT.:\nJET AVIATION AG\nEngineering Department\nPREPARED:\nDATE:\nBun\n7/6/99\nDEPT.:\n\"JET AVETIONING DATE:\nEngineering orament\nD:\nCHECKED:\n7/6/99\nSeite 33\n(a-b) Changes to operation limitations are\nshown in the AFM Supplement.\n(d) Table of contents is included.\n(a-b) No change to basic T/C.\n(c) Refer to new Weight and Balance\n(d-i) No change to basic T/C.\nDEPT.:\nAPPROVED:\nDATE:\nKurunt\nEFTA01123827\n", "char_count": 905}]}