{"efta_number": "EFTA01118505", "page_count": 4, "url": "https://epstein-data.com/EFTA01118505", "pdf_url": "https://epstein-data.com/pdf/EFTA01118505.pdf", "pages": [{"efta_number": "EFTA01118505", "page_number": 0, "text_content": "LSJ, LLC \nGensler \nPayment Analysis - 07/11/2007 - 03/01/2011 \nType \nDate \nNum \nMemo \nAccount \nClr \nSplit \nAmount \nArthur Gensler, Jr & Associates, Inc \nCheck \n07/11/2007 1571 \n10011 • JPMorgan' \n6 \n14016 - L.S.J., LLC \n-30.000.00 \nCheck \n08/20/2008 Wire \n10011 - JPMorgan i \n6 \n14016 • L.S.J., LLC \n-50,000.00 \nCheck \n07/11/2007 \n2598 \ninv # 191409 \n10011 • JPMorgan • \n6 \n14016 • L.S.J., LLC \n-799.49 \nCheck \n01/13/2009 Wire \n10011 • JPMorgan i \n6 \n14016 • L.S.J., LLC \n-50,000.00 \nCheck \n04/01/2009 Wire \n10011 • JPMorgan i \n6 \n14016 • L.S.J., LLC \n-30,000.00 \nCheck \n05/04/2009 Wire \n10011 • JPMorgan' \n6 \n14016 - L.S.J., LLC \n-53,875.00 \nCheck \n05/08/2009 \n10011 • JPMorgan' \n6 \n14016 - L.S.J., LLC \n-2,782.72 \nChock \n09/02/2009 Wire \n10011 • JPMorgan . \n6 \n14016 • L.S.J., LLC \n-105,500.00 \nCheck \n10/27/2009 Wire \n10011 • JPMorgan . \n6 \n14016 - L.S.J., LLC \n-160.741.17 \nCheck \n10/29/2009 Wire \n10011 • JPMorgan' \n6 \n14016 - L.S.J., LLC \n-11,582.17 \nCheck \n01/28/2010 Wire \n10011 - JPMorgan i \n6 \n14016 • L.S.J., LLC \n-867.75 \nCheck \n06/16/2010 Wire \n10011 - JPMorgan • \n6 \n14016 - L.S.J., LLC \n-66,263.78 \nCheck \n07/22/2010 Wire \ninv # 255557 \n10011 • JPMorgan • \n0 \n14016 • L.S.J., LLC \n-12,000.00 \nCheck \n09/14/2010 Wire \ninv # 2555582 & 10011 • JPMorgan ' \n6 \n14016 • L.S.J., LLC \n-24,500.00 \nCheck \n10/04/2010 Wire \ninv # 265139 \n10011 - JPMorgan • \n6 \n14016 - L.S.J., LLC \n-2.302.72 \nCheck \n11/19/2010 Wire \ninv #Pool Area - 10011 • JPMorgan • \n6 \n14016 - L.S.J., LLC \n-23,750.00 \nCheck \n11/23/2010 Wire \n50% inv - Work 10011 • JPMorgan i \n6 \n14016 - L.S.J., LLC \n-25,000.00 \nCheck \n11/24/2010 Wire \n5inv # 250003 \n10011 • JPMorgan ' \n6 \n14016 • L.S.J., LLC \n-8.940.00 \nCheck \n12/02/2010 Wire \n5inv # 273470 & 10011 • JPMorgan • \n0 \n14016 - L.S.J., LLC \n-17,237.85 \nCheck \n01/03/2011 Wire \nLSJ Flagpole Po 10011 • JPMorgan • \n6 \n14016 - L.S.J., LLC \n-7,500.00 \nCheck \n02/04/2011 Wire \nLSJ Inv # 28509: 10011 - JPMorgan Chase MM 14016 - L.S.J., LLC \n-12,333.51 \nTotal Arthur Gensler, Jr & Associates, Inc \n-695,976.16 \n7O NA. (Al !DAB IL \nmoOks \n(91,110NID \nitiqf 62/ .86 \nU \n2J (LA, \nPage 1 of 1 \nEFTA01118505\n", "char_count": 2123}, {"efta_number": "EFTA01118505", "page_number": 1, "text_content": "Gensler - Summary \nAs of 5-16-2011 \nUS Dollars \nDescription \nAmount \nSummary 2007-2011 \nTotal Billed thru 5/12/2011 \n727,583.57 \nTotal Paid thru 5/12/2011 \n695,976.16 \nTotal Outstanding Balance as of 5/12/2011 \n$ \n31,607.41 \nSummary 2010 \nTotal Billed 2010 \n180,862.10 \nTotal Paid 2010 \n180,862.1. 0 \nTotal Outstanding Balance 2010 \n$ \n- \nSummary 2011 \nTotal Billed 1/1/2011 - 5/12/2011 \n51,440.92 \nTotal Paid 1/1/2011 - 5/12/2011 \n19,833.51 \nTotal Outstanding Balance1/1/2011 - 5/12/2011 \n$ \n31,607.41 ' \nEFTA01118506\n", "char_count": 519}, {"efta_number": "EFTA01118505", "page_number": 2, "text_content": "LSJ LLC \nGensler - Summary \nAs of 5-16-2011 \nTotals billed by Area \nFees \nExpenses \nTotals \na Pool Area / Screening Room / Cabanas \n498,900.00 \n31,314.80 \n530,214.80 \nb ATV Garage \n6,000.00 \n- \n6,000.00 \nc Existing Main Res, Pavilions, Master Bed \n7,500.00 \n- \n7,500.00 \nd Dock House \n15,000.00 \n- \n15,000.00 \ne Living Room / Screening Room \n25,000.00 \n4,737.85 \n29,737.85 \nf Pool Area / Main Residence \n56,440.00 \n4,190.92 \n60,630.92 \ng Guest Cottage Concept Design \n15,000.00 \n- \n15,000.00 \nh Spa Concept Design \n10,000.00 \n10,000.00 \ni Flagpole Pool \n15,000.00 \n15,000.00 \nj Flagpole Pool Concept \n8,500.00 \n8,500.00 \nk add: Design Fee not included in agreement \n30,000.00 \n30,000.00 \nTotal billed by Gensler \n687,340.00 \n40,243.57 \n727,583.57 \nEFTA01118507\n", "char_count": 761}, {"efta_number": "EFTA01118505", "page_number": 3, "text_content": "LSJ LLC \nGensler - Details \nAs of 5-16-2011 \nRevised \nDate \nNo \nAgreement \nPaid \nDescription \nAgreement dated 9/18/09 \nExpenses \nTotals \nPaid Bills \n7/11/07 Design Fee \n30,000.00 \nk \n30,000.00 \n8/20/08 Schematic Design \n50,000.00 a \n50,000.00 \n10/24/08 Reimbursed Expenses \na \n799.49 \n799.49 \n1/13/09 Schematic Design \n50,000.00 a \n50,000.00 \n4/1/09 Design Development - Pool \n30,000.00 a \n30,000.00 \n5/4/09 Design Development - Pool \n20,000.00 \na \n20.000.00 \nSchematic Design - Consultants \n33,875.00 a \n33,875.00 \n5/8/09 Reimbursed Expenses \na \n2,782.72 \n2,782.72 \n9/2/09 Schematic Design - Consultants - Pool \n34,500.00 \na \nSchematic Design - Consultants - ATV Garage \n1,000.00 b \nSchematic Design - Consultants - Existing Main Residence \n5,000.00 c \nDesign Development - Pool \n46,000.00 a \nDesign Development - ATV Garage \n4,000.00 b \nSchematic Design - Dock House \n15,000.00 d \n105,500.00 \n10/6/09 Development Design - Consultants - Pool \n51,000.00 a \nConstruction Design - Pool \n100,000.00 a \nReimbursed Expenses \na \n9,741.17 \n160,741.17 \n10/29/09 Reimbursed Expenses \na \n11,582.17 \n11,582.17 \n1/28/10 Reimbursed Expenses \na \n867.75 \n867.75 \n6/16/10 Construction Design - Pool \n41,000.00 a \n6/16/10 Reimbursed Expenses \na \n3,238.78 \n6/16/10 Credit given - 10% \n(4,100.00) a \n6/16/10 Design Development - Consultants - Pool \n22,625.00 a \n66,263.78 \n6/16/10 Design Development - Consultants - AN Garage \n1,000.00 b\n6/16/10 Design Development - Consultants - Existing Main Res \n2,500.00 c \n7/23/10 Construction Design - Pool \n12,000.00 a \n12,000.00 \n9/13/10 Construction Design - Pool \n12,000.00 a \n9/13/10 Construction Design - Living Room / Screening Room \n12,500.00 e \n24,500.00 \n10/4/10 Reimbursed Expenses \na \n2,302.72 \n2,302.72 \n11/18/10 Construction Design - Pool Area / Main Residence \n23,750.00 f \n23,750.00 \n11/22/10 Construction Design - Guest Cottage Concept Design \n15,000.00 g \n11/22/10 Construction Design - Spa Concept Design \n10,000.00 h \n25,000.00 \n11/23/10 Construction Design - Pool Area / Main Residence \n8,940.00 f \n8,940.00 \n12/2/10 Construction Design - Living Room / Screening Room \n12,500.00 e \n4,737.85 \n17,237.85 \n1/3/11 Construction Design - Flagpole Pool \n7,500.00 i \n7,500.00 \n2/4/11 Construction Design - Pool Area / Main Residence \n11,875.00 f \n458.51 \n12,333.51 \nTotal Paid \n30,000.00 \n629,465.00 \n36,511.16 \n695,976.16 \nInv Date Unpaid Bills \n3/18/11 Construction Design -Pool Area / Main Residence \n11,875.00 f \n11,875.00 \n3/21/11 Construction Design -Flagpole Pool \n7,500.00 i \n7,500.00 \n3/21/11 Construction Design -Pool Area / Main Residence \n( \n3,732.41 \n3,732.41 \n4/11/11 Construction Design -Flagpole Pool Concept \n5,000.00 j \n5,000.00 \n5/12/11 Construction Design - Flagpole Pool Concept \n3,500.00 j \n3,500.00 \nTotal Unpaid \n27,875.00 \n3,732.41 \n31,607.41 \nTotal Paid & Unpaid Bills \n30,000.00 \n657,340.00 \n40,243.57 \n727,583.57 \nEFTA01118508\n", "char_count": 2889}]}