{"efta_number": "EFTA01110396", "page_count": 4, "url": "https://epstein-data.com/EFTA01110396", "pdf_url": "https://epstein-data.com/pdf/EFTA01110396.pdf", "pages": [{"efta_number": "EFTA01110396", "page_number": 0, "text_content": "11:08 AM\n12/23/10\nLSJ, LLC\nJob Estimates vs. Actuals Detail for 1006 - Laundry\nAll Transactions\nService\nLaundry\nEst. Cost\nAct. Cost\n($) Diff.\n01 Direct Expenses\n01-100- Holiday Allocation\n01-101 Burden\n0.00\n0.00\n296.31\n296.31\n176.93\n176.93\n01-610 Material Handling\n2,400.00\n1,287.12\n-1,112.88\n01-621-Temporary Protection\n1,500.00\n80.00\n-1,420.00\n01-624-Construction Cleaning\n1,440.00\n769.88\n-670.12\n01-645-Expendables\n2,250.00\n1,278.77\n-971.23\n01-646- Small Tools\n1,700.00\n533.40\n-1,166.60\n01-665-Equipment Rental\n1,500.00\n01-900- Misc. Expenses\n500.00\n0.00\n184.00\n-1,500.00\n-316.00\nTotal 01 Direct Expenses\n11,290.00\n4,606.41\n-6.683.59\n02 Site Work\n02-000-Inspection-Testing\n02-005-Layout/Survey\n02-200-Excavation-Backfill\n3,500.00\n3,608.00\n108.00\n1,500.00\n1,104.00\n-396.00\n10,000.00\n10,437.86\n437.86\n02-281- Pest Control\n1,176.00\n1,175.00\n-1.00\n02-480-Landscaping\n3,000.00\n0.00\n-3,000.00\n02-740-Septic System\n10,500.00\n10,228.00\n-272.00\nTotal 02 Site Work\n29,676.00\n26,552.86\n-3,123.14\n03 Concrete\n03-111 - Footing\n8,300.00\n8,276.40\n-23.60\n03-130-4000# Concrete\n9,405.00\n8,746.92\n-658.08\n03-154 - Shoring\n900.00\n855.20\n-44.80\n03-171 - Stairs\n2,225.00\n2,201.44\n-23.56\n03-173 - Slab on Grade\n1,350.00\n1,332.80\n-17.20\n03-174 - Elevated Slab\n8,280.00\n8,279.04\n-0.96\nis this\nfor the sick?\nif so is it Lahar\nor just\n+ material or\nThis is\nLahar\n20x22'\n= 638 SQ FEET\nHow much is the Lohan Total 06 Carpentry\n03-210 - Rebar\n6,700.00\n6,684.16\n-15.84\n03-362 - Pumping\n1,525.00\n2,885.00\n1,360.00\n03-600 - Grouting\n270.00\n1,360.19\n1,090.19\nTotal 03 Concrete\n38,955.00\n40,621.15\n1,666.15\n04 Masonry\n04-220-CMU\n6.880.00\n7,042.80\n162.80\n04-424-Coral Stone Tile\n19,550.00\n270.32\n-19,279.68\n04-450-Native Stone Veneer\n21,000.00\n20,659.20\n-340.80\nTotal 04 Masonry\n47,430.00\n27,972.32 -19,457.68\n06 Carpentry\n06-050-Fasteners - Material\n1,500.00\n1,459.04\n-40.96\n06-100-Rough Carpentry - L\n3,200.00\n1,423.60\n-1,776.40\n06-101-Rough Carpentry - M\n3,000.00\n0.00\n-3,000.00\n06-200 - Finished Carpentry\n10,000.00\n7,250.00\n-2,750.00\n17,700.00\n10,132.64\n-7,567.36\n08 Doors and Windows\nper sq foot?\n08-100-Metal Doors & FramesM\n08-101-Metal Doors & FramesL\n08-711 - Finish Hardware - L\n3,100.00\n3,080.29\n-19.71\n480.00\n866.00\n240.00\n0.00\nTotal 08 Doors and Windows\n3,820.00\n3,946.29\n09 Finishes\n09-200-Plaster-\n5,500.00\n5,430.87\nC09-310-Ceramic Tile Floor\n8,500.00\n8,289.00\n-211.00\n09-910-Exterior Painting\n500.00\n09-920- Interior Painting\n1,000.00\n0.00\n0.00\n-500.00\n-1,000.00\n386.00\n-240.00 #\n126.29\n6,780 is\n69.13 for phillip mark\nLabar\nTotal 09 Finishes\n15,500.00\n13,719.87\n-1,780.13\n10 Specialities\n10-520- Fire Extinguishers\n500.00\n0.00\n10-670 - Storage Shelving\n3,500.00\n0.00\n-500.00\n-3,500.00\nTotal 10 Specialities\n4,000.00\n0.00\n-4,000.00\nPage 1\nEFTA01110396\n", "char_count": 2737}, {"efta_number": "EFTA01110396", "page_number": 1, "text_content": "11:08 AM\n12/23/10\nLSJ, LLC\nJob Estimates vs. Actuals Detail for 1006 - Laundry\nAll Transactions\nEst. Cost\nAct. Cost\n($) Diff.\n11 Equipment\n11-452-Laundry Equipment\nTotal 11 Equipment\n10,000.00\n8,400.00\n-1,600.00\n10,000.00\n8,400.00\n-1,600.00\n15 Mechanical\n15-400 - Plumbing\n20,885.00\n6.683.05\n-14,201.95\n15-600-AC System\n6,000.00\n5,080.00\n-920.00\nTotal 15 Mechanical\n26,885.00\n11,763.05 -15,121.95\n16 Electrical\n16-000 - Electrical Complete\n15,750.00\n18,303.41\n2,553.41\nTotal 16 Electrical\n15,750.00\n18,303.41\n2,553.41\nTotal Laundry\n221,006.00\n166,018.00 -54,988.00\nTotal Service\n221,006.00\n166,018.00 -54,988.00\nTOTAL\n221,006.00 166,018.00 -54,988.00\nPage 2\nEFTA01110397\n", "char_count": 671}, {"efta_number": "EFTA01110396", "page_number": 2, "text_content": "Cellular:\nPhillip Mark Sub-Contractor 11.30.10\nLICENSED\nGENERAL BUILDER CISTERN CLEANING\nROOFS\nTILING PAINTING SWIMING POOLS FINISH WORK\nESTATE WINTBERG\nNo. 1-137-6\nST. THOMAS, U.S. V.I. 00802\nLittle ST. James I shan Diol03351\nTile Work Done at\nittle $7. James in the\nLaundry Room and\n129 Ft 7in x 223 in 1 3 4 in x 2th fm 21x36\nRoom\n662.315qFt\n3itlin\n8\n7.6\n08\nTOTAL SQ FEET is\nTotal Lohan $6,780 =\n677.91\n56,780 = $10 per\nsquare fort\nEFTA01110398\n", "char_count": 448}, {"efta_number": "EFTA01110396", "page_number": 3, "text_content": "LSJ CONSTRUCTION\nSubcontractor Payout\nProject:\nLaundry #1006\nDecember 6, 2010\nTrade:\nTile Flooring\nRequisition #01\nSubcontractor Phillip Mark\nInvoice #\nRequisition #01\nInsurance expiration:\nPartial\nFinal\nPhase #\n09-310\nOriginal Contract Sum:\nChange Orders Submitted & Approved:\nNew Change Orders:\n$6,780.00\n$0.00\n$0.00\nTotal Work Contracted to Date:\n$6,780.00\nTotal Work Completed to Date:\n100%\n$6,780.00\nLess Retainage:\n$0.00\n$0.00\n$6,780.00\nбок\n$0.00\nTotal Payments Made to Date:\nTotal Current Payment Due:\nBalance to Finish including Retainage:\nSales Tax Liability:\na. Subcontractor/Supplier is liable, explai\ninstall only / tax\nincluded in contract\nb. Non-resident Subcontractor/Supplier Bond Applicable:\nc. Use Tax to be paid by our company:\nd. Shipping\nTotal Outlays for this contract incl. Sales or Use Tax:\nJEE approval attached\nYES\nSubmitted Bill\nSigned:\nNO\n✗\nинк\nDate: December 6, 2010\nApproved by: Emad\nSigned\nDate\nEmad\n12\\7\\10\nNone\n$6,780.00\nInvoice Attached\nYES\nNO\nApproved by: Gary\nSigned:\nDate: December 6, 2010\nApproved by:\nSigned:\nDate:\nEFTA01110399\n", "char_count": 1067}]}