{"efta_number": "EFTA01079736", "page_count": 13, "url": "https://epstein-data.com/EFTA01079736", "pdf_url": "https://epstein-data.com/pdf/EFTA01079736.pdf", "pages": [{"efta_number": "EFTA01079736", "page_number": 0, "text_content": "MADISONPARK\nREAL ESTATE COMPANY LLC\nNovember 23, 2011\nRE: Update Letter;\nDear Partner,\nI hope this letter finds you well.\nI am thrilled to report to you that we have received The New York City Landmarks Preservation\nCommission approval and also a New York City Department of Buildings Building Permit. As you\nknow, this took more time than expected. The delay was mostly caused by the pace of the\nCommission's written approval. We received approval orally at a public meeting on June 21, 2011.\nFor those inclined to glean some interesting information about our property, I have enclosed the\nLandmarks Preservation Commission letter. While waiting for the permit, we were able to do work\nin the building under our already existing demolition permit, including new water, sewer and\nelectrical connections to the public utilities in the street. Also enclosed is an updated construction\nschedule which shows where we are now and when we hope to finish. I believe there are six months\nleft to the base schedule until completion (not including the model apartment, see below).\nIn addition, we will soon be filling for a construction permit for the fit out of the model apartment.\nAs part of this update, there is an enclosed floor plan prepared by our architect Kevin Bergin. This\nlayout has been developed with sales and marketing guidance from Prudential Douglas Elliman, our\nbrokers. I believe it truly maximizes all the positive elements of the space.\nI have included two articles that report on two separate properties very close to us. The Museum of\nMathematics is 100 feet to the west of our front door on 26th street. I believe having such an\nimportant institution so close to us only enhances our immediate neighborhood. The second article\nis about the Metropolitan Life clock tower and its future use. Both projects confirm the vitality of\nMadison Park surrounding area.\nAt this time of thanksgiving I want to reiterate my appreciation for your trust.\nHappy Thanksgiving,\nсв\nDavid Mitchell\nEFTA01\n... [truncated, 2007 chars — for the full page use /api/corpus/document/EFTA01079736/0 or ?id=EFTA01079736&page=0]", "char_count": 2007}, {"efta_number": "EFTA01079736", "page_number": 1, "text_content": "1425\nTHE NEW YORK CITY LANDMARKS PRESERVATION COMMISSION\n1 CENTRE STREET 9TH FLOOR NORTH NEW YORK NY 10007\nTEL: 212 669-7700 FAX: 212 669-7780\nPERMIT\nCERTIFICATE OF APPROPRIATENESS\nISSUE DATE:\n11/04/2011\nRES\nEXPIRATION DATE:\n06/21/2017\nDOCKET #:\n12-6007\nCOFA #:\nADDRESS\nBOROUGH:\nBLOCK/LOT:\nHISTORIC DISTRICT\nMADISON SQUARE NORTH\nMANHATTAN\n856/14\nDisplay This Permit While Work Is In Progress\nISSUED TO:\nDavid Mitchell\nMadison Park Real Estate Company LLC\nNOLL\nPursuant to Section 25-307 of the Administrative Code of the City of New York, the Landmarks Preservation\nCommission, at the Public Meeting of June 21, 2011, following the Public Meeting of the same date, voted to\ngrant a Certificate of Appropriateness for the proposed work at the subject premises, as put forth in your\napplication completed May 26, 2011, and as you were notified in Status Update Letter 12-1814. This approval\nwill expire on June 21, 2017.\nThe proposed work, as approved, consisted of the construction of a rooftop addition; the installation of railings\nand lighting at the East 26th Street façade; the installation of railings at the East 27th Street façade; and the\nalterations of the ground floor infill at both the East 26th Street and East 27th Street facades; as shown in\nphotographs and drawings LPC-1 through LPC-20, dated June 21, 2011, prepared by Crown Design &\nConsulting, submitted as components of the application and presented at the Public Hearing and Public Meeting.\nIn reviewing this proposal, the Commission noted that the Madison Square North Historic District designation\nreport describes 21 East 26th Street, aka 16 East 27th Street, as a neo-Classical style office and showroom\nbuilding designed by Treanor & Fatio and built in 1924; and that the building's style, scale, materials and details\nare among the features that contribute to the special architectural and historic character of the Madison Square\nNorth Historic District.\nWith regard to this proposal, the Commission found that the constr\n... [truncated, 2628 chars — for the full page use /api/corpus/document/EFTA01079736/1 or ?id=EFTA01079736&page=1]", "char_count": 2628}, {"efta_number": "EFTA01079736", "page_number": 2, "text_content": "building's façade; that the proposed alterations at the ground floor of the 27th Street façade is in keeping with the\nsecondary facades of other buildings in the district; and that the proposed work will not diminish the special\narchitectural and historic character of the building or the district. Based on these findings, the Commission\ndetermined the proposed work to be appropriate to the building and the Madison Square North Historic District,\nand voted to approve this application.\nHowever, in voting to grant this approval, the Commission stipulated that the applicant work with staff to modify\nthe light fixtures, the railing at the 5th floor parapet, and the East 27th Street façade, and that two final signed and\nsealed Department of Buildings filing drawings showing the approved proposai be submitted to the Landmarks\nPreservation Commission for review and approval.\nSubsequently, on November 4, 2011, the Landmarks Preservation Commission received existing condition\nphotographs, a cut sheet of the proposed light, and final drawings S-001.00, S-002.00, S-101.00, S-102.00,\nS-501.00, and S-502.00, dated revised October 12, 2011 and prepared by Matthew Coleman Abate, P.E.;\nM-001.00, M-002.00, M-101.00, M-500.00, M-501.00, M-601.00, M-701.00 and M-702.00, dated September 30,\n2011; and M-102.00, dated revised October 21, 2011; and all prepared by James M. Kernan, P.E.; G-001.00\nthrough G-005.00, Z-001.00, A-101.00, A-102.00, A-104.00, A-105.00, A-106.00, A-201.00, A-202.00,\nA-203.00, A-301.00, A-501.00, A-502.00, and A-601.00, dated revised October 31, 2011 and prepared by\nRichard Joseph Walsh, R.A.; and A-701.00 through A-726.00, dated revised November 3, 2011 and prepared by\nCrown Design and Consulting.\nAccordingly, the staff of the Commission reviewed the drawings, and found that the proposal approved by the\nCommission has been maintained; that the light fixtures at the East 26th Street façade have been reduced to two\n(2) and the design revised; that the proposed raili\n... [truncated, 5273 chars — for the full page use /api/corpus/document/EFTA01079736/2 or ?id=EFTA01079736&page=2]", "char_count": 5273}, {"efta_number": "EFTA01079736", "page_number": 3, "text_content": "on these and the above findings, the drawings have been marked approved with a perforated seal, and Certificate\nof Appropriateness 12-6409 is being issued.\nPLEASE NOTE, this permit is contingent upon the Commission's review and approval of samples of limestone\npatching, replacement brick, and repointing mortar prior to the co.nmencement of work. Please contact Sandy\nChung to schedule a site visit once samples are available for review. This permit is also contingent on the\nunderstanding that the work will be performed by hand and when the temperature remains a constant 45 degrees\nFahrenheit or above for a 72 hour period from the commencement of the work.\nThis permit is issued on the basis of the building and site conditions described in the application and disclosed\nduring the review process. By accepting this permit, the applicant agrees to notify the Commission if the actual\nbuilding or site conditions vary or if original or historic building fabric is discovered. The Commission reserves\nthe right to amend or revoke this permit, upon written notice to the applicant, in the event that the actual building\nor site conditions are materially different from those described in the application or disclosed during the review\nprocess.\nAll approved drawings are marked approved by the Commission with a perforated seal indicating the date of\napproval. The work is limited to what is contained in the perforated documents. Other work or amendments to\nthis filing must be reviewed and approved separately. The applicant is hereby put on notice that performing or\nmaintaining any work not explicitly authorized by this permit may make the applicant liable for criminal and/or\ncivil penalties, including imprisonment and fines. This letter constitutes the permit; a copy must be prominently\ndisplayed at the site while work is in progress. Please direct inquiries to Sandy Chung.\nМий\nRobert B. Tierney\nChair\nBrewey\nPLEASE NOTE: PERFORATED DRAWINGS AND A COPY OF THIS PERMIT HAVE BEEN SENT TO:\nM\n... [truncated, 2142 chars — for the full page use /api/corpus/document/EFTA01079736/3 or ?id=EFTA01079736&page=3]", "char_count": 2142}, {"efta_number": "EFTA01079736", "page_number": 4, "text_content": "Finish\nFri 5/11/12\nAug\npte Octobe Novem Decem Januar Februal March April May June July\nMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBM\n234567\nID\nTask Name\nDuration\nStart\n0\nWindows (Wood) & Exterior Doors\n205 days\nMon 8/1/11\nShop Drawings\n15 days\nMon 8/1/11\nFri 8/19/11\nApprovals\n75 days\nMon 8/22/11\nFri 12/2/11\nFabrication\n85 days\nMon 12/5/11\nFri 3/30/12\nInstallation\n30 days\nMon 4/2/12\nFri 5/11/12\n-2212678666672222200=2&\nBridge Scaffold Erection\n5 days\nThu 12/15/11\nDemolition\n12 days\nMon 9/12/11\n13\n14\n15\nSteel\n75 days\nWed 11/30/11\nWed 12/21/11\nTue 9/27/11\nTue 3/13/12\nA\nShop Drawings\n15 days\nWed 11/30/11\nTue 12/20/11\nApprovals\n10 days\nWed 12/21/11\nTue 1/3/12\nFabrication\n30 days\nWed 1/4/12\nTue 2/14/12\nInstallation\n20 days\nWed 2/15/12\nTue 3/13/12\n56\n57\n58\n59\nSprinkler\n70 days\nWed 11/30/11\nTue 3/6/12\nA\nService\n15 days\nWed 11/30/11\nTue 12/20/11\nRoughing\n55 days\nWed 12/21/11\nH\nPlumbing\nService\n100 days\nMon 10/31/11\n15 days\nMon 10/31/11\nTue 3/6/12\nFri 3/16/12\nFri 11/18/11\nRoughing\n80 days\nMon 11/21/11\nFri 3/9/12\n73\n74\nTrim\nElectrical\nService\nRoughing\n5 days\n110 days Mon 11/14/11\nMon 3/12/12\nFri 3/16/12\nFri 4/13/12\n25 days\n60 days\nMon 11/14/11\nMon 12/19/11\nFri 12/16/11\n75\nTrim\n15 days\nMon 3/26/12\nWindows (Metal)\n95 days\nWed 11/30/11\n9\n圄\nShop Drawings\n15 days\nWed 11/30/11\nFri 3/9/12\nFri 4/13/12\nTue 4/10/12\nTue 12/20/11\nApprovals\n10 days\nWed 12/21/11\n11\nFabrication\n45 days\nWed 1/4/12\nInstallation\n25 days\nWed 3/7/12\n23\nConcrete Bond Beam\n2 days\nThu 12/15/11\nTue 1/3/12\nTue 3/6/12\nTue 4/10/12\nFri 12/16/11\nTask\nProgress\nProject: 11-11-23 Chapman\nDate: Wed 11/23/11\nMilestone\nSummary\nSplit\nRolled Up Task\nRolled Up Milestone\nRolled Up Progress\nPage 1\nExternal Tasks\nProject Summary\nGroup By Summary\nDeadline\nEFTA01079740\n", "char_count": 1717}, {"efta_number": "EFTA01079736", "page_number": 5, "text_content": "Finish\nFri 2/24/12\nAug\npte Octobe Novem Decem Januar Februa March April May June July\nMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBM\nID\n35\n36\n37\n38\n39\nTask Name\nDuration\nStart\n0\nH\nDoors, Frames & Hardware\n62 days\nThu 12/1/11\nOrder & Delivery\n20 days\nThu 12/1/11\nWed 12/28/11\nInstallation\n15 days\nThu 12/29/11\nWed 1/18/12\nFrames by Mason\n15 days\nThu 12/29/11\nWed 1/18/12\n40\n41\n42\n屋\nA\nDoors by Carpenter\n5 days\nThu 12/29/11\nWed 1/4/12\nStore Front 27th Street\n30 days\nMon 1/16/12\nFri 2/24/12\nShop Drawings\nFabrication\n10 days\nMon 1/16/12\nFri 1/27/12\n15 days\nMon 1/30/12\nFri 2/17/12\n43\nInstallation\n5 days\nMon 2/20/12\nFri 2/24/12\n32\n5th Floor Roof Concrete Infills\n10 days\nThu 12/15/11\nWed 12/28/11\n63\nHVAC\n85 days\nMon 1/16/12\n64\n65\nH\nShop Drawings\n15 days\nMon 1/16/12\nFri 5/11/12\nFri 2/3/12\nApprovals\n10 days\nMon 2/6/12\nFri 2/17/12\n66\nEquipment Ordering & Delivery\n60 days\nMon 2/20/12\nFri 5/11/12\n67\nDuct Fabrication\n20 days\nMon 4/16/12\nFri 5/11/12\n68\nInstallation\n22 days\nMon 2/20/12\nTue 3/20/12\n70\n69\nAA\nUnits\nDuct\n15 days\nMon 2/20/12\nFri 3/9/12\n20 days\nMon 2/20/12\nFri 3/16/12\n71\nStart-up\n2 days\nMon 3/19/12\nTue 3/20/12\n18\nSteel Stairs\n55 days\nThu 1/5/12\nWed 3/21/12\n19\n圄\nShop Drawings\n10 days\nThu 1/5/12\nWed 1/18/12\n20\nApprovals\n5 days\nThu 1/19/12\n21\nFabrication\n25 days\nThu 1/26/12\n22\nInstallation\n15 days\nThu 3/1/12\nWed 1/25/12\nWed 2/29/12\nWed 3/21/12\n24\nMasonry\n60 days\nThu 12/15/11\nWed 3/7/12\n25\nBrick and Block Work at Roof\n60 days\nThu 12/15/11\nWed 3/7/12\n26\nMisc. Brick and Block Infills\n25 days\nThu 12/15/11\nWed 1/18/12\n27\nMisc. Masonry 1st Floor\n10 days\n44\nFraming\n68 days\nMon 1/2/12\nWed 12/7/11\nFri 1/13/12\nFri 3/9/12\nTask\nProgress\nProject: 11-11-23 Chapman\nDate: Wed 11/23/11\nMilestone\nSummary\nSplit\nRolled Up Task\nRolled Up Milestone\nRolled Up Progress\nPage 2\nExternal Tasks\nProject Summary\nGroup By Summary\nDeadline\nEFTA01079741\n", "char_count": 1830}, {"efta_number": "EFTA01079736", "page_number": 6, "text_content": "Finish\nTue 1/3/12\nAug\npte Octobe Novem Decem Januar Februa March April May June July\nMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBMEBM\nID\n45\n46\nTask Name\nDuration\nStart\nCH\n2nd-4th Floors\n20 days\nWed 12/7/11\n47\n48\n屋\n5th Floor\nPenthouse\nCellar\n5 days\nWed 1/4/12\nTue 1/10/12\n5 days\nMon 1/2/12\n5 days\nMon 1/9/12\nFri 1/6/12\nFri 1/13/12\n49\n29\nLobby\n10 days\nMon 2/27/12\nRoofing\n20 days\nThu 3/8/12\n31\n30\nAA\nInstall 5th Floor Roof Pavers\n5 days\nThu 3/8/12\nFri 3/9/12\nWed 4/4/12\nWed 3/14/12\nInstall Roofing Membrane\n20 days\n50\nDrywall\n72 days\nThu 3/8/12\nThu 12/15/11\n51\n2nd-4th Floors\n25 days\nThu 12/15/11\nWed 4/4/12\nFri 3/23/12\nWed 1/18/12\n52\n5th Floor\n7 days\nThu 1/19/12\nFri 1/27/12\n53\nPenthouse\n5 days\nMon 1/30/12\n54\nCellar\n7 days\nMon 2/6/12\nFri 2/3/12\nTue 2/14/12\n55\nLobby\n10 days\nMon 3/12/12\nFri 3/23/12\n79\nStone & Tile\n57 days\nThu 1/19/12\nFri 4/6/12\n80\nInstall Tile at Baths 2nd-5th Floor\n12 days\nThu 1/19/12\nFri 2/3/12\n81\nInstall Stone at Lobby\n10 days\nMon 3/26/12\nFri 4/6/12\n28\nConcrete Roof\n34\nFire Proofing\n1 day\n10 days\nWed 3/14/12\nWed 3/14/12\nWed 3/14/12\nTue 3/27/12\n76\nFire Alarm\n20 days\nMon 1/9/12\n77\nFaçade Restoration\n10 days\nThu 4/12/12\n82\nCarpentry\n20 days\n78\nPainting\n45 days\n33\nSidewalks\n10 days\nThu 4/5/12\nThu 3/22/12\nMon 2/27/12\nFri 2/3/12\nWed 4/25/12\nWed 5/2/12\nWed 5/23/12\n85\nMillwork\n11 days\nThu 4/5/12\n86\nKitchen Cabinets Installed\n10 days\nThu 4/5/12\n87\nLobby Desk\n1 day\nThu 4/19/12\nFri 3/9/12\nThu 4/19/12\nWed 4/18/12\nThu 4/19/12\n83\nPunchlist\n84\nSubstantial Completion\n30 days\n1 day\nThu 5/24/12\nWed 7/4/12\nThu 7/5/12\nThu 7/5/12\nProject: 11-11-23 Chapman\nDate: Wed 11/23/11\nTask\nProgress\nMilestone\nSummary\nSplit\nRolled Up Task\nRolled Up Milestone\nRolled Up Progress\nPage 3\nExternal Tasks\nProject Summary\nGroup By Summary\nDeadline\nEFTA01079742\n", "char_count": 1743}, {"efta_number": "EFTA01079736", "page_number": 7, "text_content": "3 Floor Finish Plan: Fourth Floor\nScale 1/8\"-10\"\nOD\nTroph Chole\ncycling Bi\nElectrical Papela\nEFTA01079743\n", "char_count": 106}, {"efta_number": "EFTA01079736", "page_number": 8, "text_content": "WSJ\n.com\nTHE WALL STREET JOURNAL.\nONLINE\nSaving the Clock Tower\nBY CRAIG KARMIN\nOctober 26th, 2011\nMarriott International Inc. has agreed to buy Manhattan's famous Clock Tower building, raising the\nprospect that the company will use the historic property to revive a struggling new hotel brand.\nThe lodging giant signed a contract earlier this month to pay $165 million to Africa Israel USA for the\nproperty, according to people familiar with the matter.\nMarriott is likely targeting the site for its stylish Edition Hotel line, hoping to build fresh momentum\nfor Edition after the brand stumbled coming out of the gate, some people in the hotel industry say.\nNatalie Keyssar for The Wall Street Journal\nMarriott may brand Manhattan's Clock Tower building\nas one of its fledgling Edition hotels.\nThe Bethesda, Md., company announced Edition in\n2007 with hotelier lan Schrager as a partner. It\npredicted then it would open 100 Edition hotels over\n10 years. So far, there is one in Istanbul and one in\nHonolulu.\nAfter a dispute with Marriott, the owners of the Waikiki Edition took back the property and\nrebranded it. A New York state court ordered the owners to return the property to Marriott's\ncontrol. The owners then declared bankruptcy, which halted the New York judge's order.\nIf Marriott does convert the Clock Tower to an Edition Hotel, it would continue the company's trend\nfor spending significant sums of cash on new hotels to support the fledgling Edition brand. Marriott\nhas already said it will spend about $400 million to open Editions in Miami Beach and London.\nMarriott also joins a long list of big names in the real-estate industry that either owned or agreed to\nbuy the Clock Tower with dreams of converting the 1909 office building into a hotel or luxury\nresidence. The roster includes SL Green Realty Corp., Mr. Schrager, property developer Aby Rosen,\nand fashion designer Tommy Hilfiger.\nBut for a variety of reasons, none of them stayed around long enough to make it work.\nEFTA\n... [truncated, 2009 chars — for the full page use /api/corpus/document/EFTA01079736/8 or ?id=EFTA01079736&page=8]", "char_count": 2009}, {"efta_number": "EFTA01079736", "page_number": 9, "text_content": "People familiar with the property say there are several challenges to converting it into hotel, from\nthe small lobby to limited room for a restaurant and other amenities.\nThe clock tower was completed 102 years ago for insurer MetLife Inc. and was modeled after the\nCampanile di San Marco in Venice. At 700 feet high, it was the world's tallest building until 1913,\nwhen it was surpassed by the Woolworth building in lower Manhattan.\nDuring the recent boom years, the tower's storied pedigree and enviable location near Madison\nSquare Park attracted several prominent suitors who had visions of turning the Gothic-style building\ninto an exclusive place to live or stay on visits.\nSL Green bought the building from MetLife in 2005 for $150 million, and the next year sold a\ncontrolling stake to Messrs. Schrager and Rosen.\nIn 2007, Africa Israel USA, part of diamond-industry billionaire Lev Leviev's empire, acquired it for\n$200 million.\nAfrica Israel spent tens of millions of additional dollars on financing fees and preparing the building\nfor conversion to a luxury condos that were going to be designed by Versace.\nEarlier this year, Mr. Hilfiger and a partner signed a contract to buy the building for $170 million. The\npartners planned to transform it into the designer's first hotel, with luxury condos, too.\nBut Mr. Hilfiger walked away from the project last month. An executive at his private office said\n\"there simply are other projects that may make more sense for us.\"\nEFTA01079745\n", "char_count": 1494}, {"efta_number": "EFTA01079736", "page_number": 10, "text_content": "The New York Times\nExpect the WorldⓇ\nOne Math Museum, Many Variables\nBY KENNETH CHANG\nJuly 27th, 2011\nFor every one who finds mathematics incomprehensible, boring, pointless, or all of the above,\nGlen Whitney wants to prove you wrong.\nHe believes that tens of thousands of visitors will flock to his Museum of Mathematics, to open\nin Manhattan next year, and leave invigorated about geometry, numbers and many more\nmathematical notions.\n\"We want to expose the breadth and the beauty of mathematics,\" said Mr. Whitney, a former\nmath professor who parlayed his quantitative skills into a job at a Long Island hedge fund. He\nquit in late 2008 with connections to deep pockets and a quest to make math fun and cool.\nTwo years ago, he and his team built a carnival-like traveling exhibit called the Math Midway, a\nproof-of-concept for the coming museum. It includes a tricycle with square wheels of different\nsizes that visitors can ride smoothly around a circular path ridged like a flower's petals. An\naccompanying sign explains why: The undulating circular surface rises and falls exactly to\noffset the odd shape of the wheels, so that the tricycle's axles - and the rider - remain at the\nsame height as they move.\nMr. Whitney hopes that colorful, interactive props will help his cause. \"If we just pluck people\nin the street - 'What adjectives would you use to describe math?' - very few of them would\nsay, 'beautiful,\" \" Mr. Whitney said.\nHis vision has enticed large contributions. The museum, which will be at 11 East 26th Street,\nhas raised $22 million, including $2 million from Google and a lot from individual donors (yes,\nthere's some hedge fund money in there).\nIt remains to be seen whether a math museum can succeed. There are currently zero math\nmuseums in the United States, and the one small one that did exist, on Long Island, closed in\n2006. There are plenty of science museums that cover math topics, but Mr. Whitney's museum,\nnicknamed MoMath, will be devoid of dinosaurs and planeta\n... [truncated, 2229 chars — for the full page use /api/corpus/document/EFTA01079736/10 or ?id=EFTA01079736&page=10]", "char_count": 2229}, {"efta_number": "EFTA01079736", "page_number": 11, "text_content": "Without a museum yet, Mr. Whitney periodically gives walking tours to point out the\nmathematical wonders that can be seen around Manhattan. At 42, he exudes a boyish, geeky\nenthusiasm as he talks about how the branches of ginkgo trees intersect at right angles more\noften than those of other trees, or points out that the bolts that open and close New York fire\nhydrants are pentagonal, rather than the usual six-sided variety.\nThree years ago, he was working with algorithms at Renaissance Technologies, a private\ninvestment firm that uses mathematical models to figure out where to put money. But after a\ndecade there, he was looking for a new career path with a \"more direct socially redeeming\nvalue,\" he said.\nThen, he heard that the math museum on Long Island, Goudreau, had closed. He started\nthinking that there should be a math museum and that he should be the one to build it.\n\"I really felt that I found my calling,\" Mr. Whitney said. \"I don't mean to be grandiose, but it\nwas something that felt like it really fit with my lifetime of experiences and abilities and likes\nand so on.\"\nUnder his vision, MoMath will be one small way to bolster mathematics education in the United\nStates. For years, American students have performed in the middle range on international\ncomparisons of math skills, and an oft-heard worry is that the United States might lose its\ntechnological prowess.\nWhile Mr. Whitney cites these dynamics as a reason for his quest, he is also a realist. Yes, the\nmuseum could serve as an intellectual catalyst and teaching resource, but it alone is not going\nto raise math scores. \"I'm certainly not holding my breath for that,\" he said.\nRather, he said, the museum's mission is to shape cultural attitudes and dispel the bad rap that\nmost people give math. \"It's the only field you can go to a cocktail party and talk to people with\npride about how lousy you are,\" Mr. Whitney said.\nHe hopes the museum can inspire at least a few to plunge into math more deeply. He imagine\n... [truncated, 3022 chars — for the full page use /api/corpus/document/EFTA01079736/11 or ?id=EFTA01079736&page=11]", "char_count": 3022}, {"efta_number": "EFTA01079736", "page_number": 12, "text_content": "He commutes to a modest office in Midtown scattered with math puzzles and sculptures,\nwhere he and a team of about 20 brainstorm about exhibits for the museum, which right now is\n19,000 empty square feet.\nOne idea is a large cube with square holes punched through each side, a structure known as a\nMenger sponge. When a visitor pulls the cube apart diagonally, the holes turn into six-sided\nstars. \"It's like a 'gosh, that's really cool' kind of emotion people have,\" said George Hart, the\nmuseum's chief of content. \"It's a very nice example of how mathematics can give you these\nbig surprises.\"\nThe opening is more than a year away, but Mr. Whitney is already dreaming bigger: a larger\nmuseum, a palpable cultural impact.\n\"There are all sorts of myths about mathematics out there,\" he said - math is hard, math is boring,\nmath is for boys, math doesn't matter in real life. \"All these are cultural myths that we want to blow\napart.\"\nEFTA01079748\n", "char_count": 948}]}