{"efta_number": "EFTA01070872", "page_count": 5, "url": "https://epstein-data.com/EFTA01070872", "pdf_url": "https://epstein-data.com/pdf/EFTA01070872.pdf", "pages": [{"efta_number": "EFTA01070872", "page_number": 0, "text_content": "Mr. Rex Wolterman\nL.S.J., LLC\n6100 Red Hook Quarter\nSuite B-3\nSt. Thomas, USVI 00802\n340-775-8100\nFOR SETTLEMENT PURPOSES ONLY\nJanuary, 2012\nMr. Bart Wolterman\nVirgin Islands Gunite Pools\n25 America-Anchorage Condos\nSt. Thomas, USVI 00802\nDear Messrs. Wolterman\nThis is to confirm and constitute the agreement by and between Virgin\nIslands Gunite Pools (\"VIGP\") and L.S.J., LLC (\"LSJ\") regarding the installation of tile\nand related work to resolve issues between the parties about the existing pool on\nthe main compound at Little St. James Island (the \"Main Pool\"), the completion of\nwork to resolve issues between the parties about the pool at the Flagpole area\nlocated on Little St. James Island (the \"Flagpole Pool\"), both of which have been\nconstructed by VIGP, the completion of work to address issues between the parties\nrelating to the operation and improper location of the heaters for the Main Pool and\nthe Flagpole Pool, and the completion of work to correct of any currently known\nwarranty items in respect of the Main Pool and/or the Flagpole Pool (collectively,\nthe \"Work\"). With respect to the Work, VIGP and LSJ have agreed as follows:\n1. VIGP will perform the Work, details of which are provided in the Scope of\nWork attached as Scheduled A hereto and made apart of this letter agreement (the\n\"Scope of Work\"), including, without limitation, by providing all labor, equipment\nand tools necessary to perform and complete the Work in accordance with the\nprovisions contained in this letter agreement.\n2.\nVIGP will supply all materials necessary to perform and complete the Work\nin accordance with the provisions contained in this letter agreement, except that LSJ\nshall provide at its cost the following materials to enable VIGP to perform and\ncomplete the tiling of the Main Pool:\n100sq. ft. Waterline tile\n•\n3000 sq. ft. interior tile\nEFTA01070872\n", "char_count": 1865}, {"efta_number": "EFTA01070872", "page_number": 1, "text_content": "•\n90 bags thin set (gray)\n10 gallons bonder\n5 bags lime\n12 bags common cement\n30 bags sanded grout\nSand\nIn addition, LSJ will provide at its cost the additional items which it is expressly\nstated to provide on the Scope of Work.\n3.\nVIGP shall perform the Work generally in accordance the schedule specified\non the Scope of Work.\n4.\nLSJ shall pay VIGP a total sum of $60,000 to perform the Work in accordance\nwith the provisions contained in this Agreement (the \"Resolution Payment\"). LSJ\nshall pay VIGP the Resolution Payment in 4 equal installments of $15,000, as and\nwhen provided below:\n⚫ $15,000 shall be paid upon execution of this letter agreement by both VIGP\nand LSJ and prior to the commencement by VIGP of any Work under this\nletter agreement.\n⚫ $15,000 shall be paid upon the completion of: (1) items 1 through 12\nrelating to the Flagpole Pool in the Scope of Work, and (2) items 1 through 4\nrelating to the Main Pool in the Scope of Work.\n⚫ $15,000 shall be paid upon completion of items 5 and 6 relating to the Main\nPool in the Scope of Work.\n⚫ $15,000 shall be paid within thirty (30) days after completion of all items\ncontained in the Scope of Work\nIt is agreed that payment of the Resolution Payment in accordance with the above\nschedule is in satisfaction of any outstanding balances claimed to be due and\npayable by LSJ to VIGP under any and all prior agreements between them in respect\nof the Main Pool or the Flagpole Pool (the \"Pool Agreements\"). It is further agreed\nthat the provisions of this letter agreement are intended to resolve all current\noutstanding disputes between VIGP and LSJ with respect to the Work and all\noutstanding balances claimed to be due from LSJ on the Main Pool and the Flagpole\nPool.\n5.\nAll work performed in connection with this Agreement shall be performed\nand completed in a professional and workmanlike manner in accordance applicable\nindustry standards. In addition, re-plastering work on the Flagpole Pool will\nconform to Southern Grouts and Mortars specifications on color variations. In the\nevent of any disagreement as to whether any item on the Scope of Work has been\ncompleted, such disagreement shall be resolved by reference to the foregoing\nstandards and specifications.\nEFTA01070873\n", "char_count": 2248}, {"efta_number": "EFTA01070872", "page_number": 2, "text_content": "6. The parties agree that completion of the items contained in the Scope of\nWork will resolve all currently known warranty items under the Pool Agreements.\nSubject to the previous sentence, and except as otherwise modified by the express\nprovisions contained in this letter agreement, the provisions of the Pool\nAgreements, including, but not limited to, the warranty provisions contained in\nparagraph 4 of the Pool Agreements, shall remain in full force and effect.\n7.\nThis Agreement may only be changed, modified or amended by an agreement\nin writing, signed by the parties hereto.\n8. This Agreement may be executed in counterparts, each of which shall be\ndeemed an original, but both of which together shall constitute one and the same\ninstrument.\n9. This Agreement shall be governed by, and construed in accordance with, the\nlaws of the United States Virgin Islands, applicable to contracts executed and to be\nfully performed therein, without giving effect to its principles of conflicts of law.\nIf the foregoing correctly sets forth our mutual understanding and agreement\nwith respect to the Work, please so signify by signing this letter in the space\nprovided below, whereupon this letter shall become a valid and binding agreement\nbetween us.\nAGREED AND ACCEPTED BY:\nVIRGIN ISLANDS GUNITE POOLS\nBy:\nBart Wolterman\nSincerely,\nL.S.J., LLC\nBy:\nAuthorized Representative\nEFTA01070874\n", "char_count": 1387}, {"efta_number": "EFTA01070872", "page_number": 3, "text_content": "SCHEDULE A\nSCOPE OF WORK\nFLAGPOLE POOL\n1. The plaster pumping operation shall be performed from road south side of pool\nover a protected surface.\n2. All walls, tile, deck and finish surfaces at the pool area shall be covered and\nprotected during construction.\n3. Pool is to be drained by 1/16\n4\nComplete all pool preparation to enable pool to receive new plaster. This is to\ninclude all necessary chipping, grinding, cutting and patching, replacement of\ndamaged water line tile (LSJ shall provide replacement tiles currently on site, if\nnecessary), cleaning, priming, etc. Work anticipated to take place 1/17 - 1/25\n5 Properly adjust light fixtures in the pool.\n6. Plaster delivery anticipated approx 1/24\n7 Repair scupper support plate including cope stone tile replacement above\nscupper support plate, if necessary.\n8 Relocation of heat pumps to outside slab beginning 1/17 This shall include saw\ncutting of existing slab, demolition, installation of new water supply and return\nlines, electric rough-in and service to new location on new slab. New concrete slab\nto be provided by LSJ\n9 Re-plaster pool. Anticipated to take place 1/26-1/28\n10 Refill pool. Water to be supplied by LSJ. Anticipated to take place 1/29\n11 Chemical balancing for 30 days after filling pool.\n12 Clean up of work areas to dumpster\nMAIN POOL\n1. Drain pool by 1/27\n2. All walls, tile, deck and finish surfaces at the pool area shall be covered and\nprotected during construction.\n3. Relocation of heat pumps to outside slab beginning 1/27 This shall include saw\ncutting of existing slab, demolition, installation of new water supply and return\nlines, electric rough-in and service to new location on new slab. New concrete slab\nto be provided by LSJ\n4. Remove waterline tile, prep pool to receive new tile, which includes all necessary\nchipping, grinding, cutting and patching, cleaning, priming, etc.\n5. Install new waterline tile (approx delivery 1/27)\n6. Install new pool tile (approx delivery date 2/6)\n7. Grout all tile\n8. Detail all interior pool work prior to filling\nEFTA01070875\n", "char_count": 2064}, {"efta_number": "EFTA01070872", "page_number": 4, "text_content": "9. Refill pool. Water to be supplied by LSJ. Anticipated to occur approximately\n2/27\n10. Chemical balancing for 2 wks after filling.\n11. Clean up to island dumpster\nAs part of the Scope of Work, VIGP must submit to LSJ two copies of as-built\ndrawings for each of the Flagpole Pool and the Main Pool and all instruction\nmanuals and warranties with respect to the equipment and materials previously or\nhereby to be supplied by VIGP in connection with the Flagpole Pool and the Main\nPool. VIGP shall also submit properly executed lien releases covering all\nsubcontractors, suppliers, laborers and other persons or entities who on behalf of\nVIGP performed work or services or who furnished materials for the Flagpole Pool\nand/or the Main Pool.\nFor both of the above projects, LSJ will provide port-o-let, equipment assistance\nwith unloading plaster, dumpster at hill top, and 1 1/2\" pump and hose to empty\npools.\nEFTA01070876\n", "char_count": 922}]}