{"efta_number": "EFTA01035837", "page_count": 2, "url": "https://epstein-data.com/EFTA01035837", "pdf_url": "https://epstein-data.com/pdf/EFTA01035837.pdf", "pages": [{"efta_number": "EFTA01035837", "page_number": 0, "text_content": "From: Richard Kahn\nTo: michael glidden\nCe: Daphne Wallace-\nSubject: Re: 40x60 bldg.\nDate: Fri, 15 Mar 2019 19:03:40 +0000\nP, Stephanie Remington\nany updates on the steel building as i would like to order\nplease advise\nthank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\nOn Mar 7, 2019, at 4:15 PM, Richard Kahn <\ni am not sure if you responded and i apologize if you did and i missed it..\n> wrote:\ncould you please update on status and next steps as jee would like ordered asap\nthank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York NY 10022.\nBegin forwarded message:\nFrom: Richard Kahn <\nSubject: Fwd: 40x60 bldg.\nDate: February 22, 2019 at 3:25:25 PM EST\nTo: michael glidden\nCc: Daphne Wallace\ncan you please review and reply ASAP\nthanks\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\nBegin forwarded message:\nFrom: Brian Buck\nSubject: RE: 40x60 bldg.\nDate: February 21, 2019 at 1:30:57 PM EST\nTo: michael glidden <\nCc: Daphne Wallace <\nStephanie Remington <\n>, Richard Kahn <\nStephanie Remington <\nEFTA01035837\n", "char_count": 1122}, {"efta_number": "EFTA01035837", "page_number": 1, "text_content": "Michael,\nI want to put together a drawing for you but I need to clarify a couple of things first.\n. So the building was not erected according to plans, it was modified somewhat in the field? The building was a fully sheeted building. So the erector opened up the left end wall to 8'2\" and the back side wall to 10'6\" but was sheeted 5'6\" past the\nroof of the 14\" slab. How deep is the retaining wall?\n• Are the (2) 12' x 14' doors on the marked up dwg you sent back (front side wall and right end wall) to be included in these locations? Are we adding a third rollup door in bay #3 of the front side wall where you currently have a 15' rough opening?\nAssuming the above is correct this is what I would propose.\nWe previously had the left end wall as a flush girt condition. I would change it to a bypass girt so that the girt would extend 10\"(depth of girt) past the face of the column. This way a) the panel would lap over the retaining wall(if it is 10\" or less deep) for a\ngood seal and b) would allow us to shift the columns in 10\". This will clear the existing anchor bolts which will be cut off and providing the pier is sufficient in width, would save a whole lot of time and labor on those (4) left end wall columns.\nI'd leave the back side wall open to 10'6\", sheet above the roof and provide a wall to roof flashing. assuming the slab is all even elevation?\nI think if we change the bay spacings slightly(less than a foot in most cases) we can avoid having to do a lot of the demolition.\nWhat do you think?\nRegards,\nBrian Buck\nPresident\nWeb\nFollow us on social media!\n<image002.png> <image003.png> <image004.png> <image005.png≥\n<image006.jpg\n6855 Lyons Technology Circle | Suite 18 | Coconut Creek FL 33073\n1107 Battlewood Street | Suite 221 | Franklin TN 37069\nLegal Disclaimer: This communication and any attachments contain information which is confidential and may also be privileged. It is for the exclusive use of the intended recipient(s). If you are not the intended recipient(s) please note that any form of disclosure, distribution, copying or use of this communication or\nthe information in it or in any attachments is strictly prohibited and may be unlawful. Where the content of this email is personal or otherwise unconnected with the firm's or its clients' business, Buck Steel accepts no responsibility or liability for such content. E-mail communications cannot be guaranteed to be secure\nor error free, as information could be intercepted, corrupted, amended, lost, destroyed, arrive late or incomplete, or contain viruses. We do not accept liability for any such matters or their consequences.\nFrom: michael glidden <\nSent: Wednesday, February 20, 2019 4:56 PM\nTo: Brian Buck-\nCc: Daphne Wallace\nSubject: Fwd: 40x60 bldg.\nGood afternoon Brian.\n; Richard Kahn <\n; Stephanie Remington\nI thought that this might help understanding how the building was installed. The only openings are as marked up.\nI will gather the information tomorrow that we discussed.\nBegin forwarded message:\nFrom: michael glidden<\nSubject: 40x60 bldg.\nDate: February 20, 2019 at 5:47:48 PM AST\nTo:\n<image001.jpg>\nSent from my iPhone\nEFTA01035838\n", "char_count": 3146}]}