{"efta_number": "EFTA01035418", "page_count": 6, "url": "https://epstein-data.com/EFTA01035418", "pdf_url": "https://epstein-data.com/pdf/EFTA01035418.pdf", "pages": [{"efta_number": "EFTA01035418", "page_number": 0, "text_content": "From: Richard Kahn\nTo: Jeffrey Epstein\nSubject: Fwd: March Barge log\nDate: Wed, 20 Mar 2019 12:51:38 +0000\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue, 4th Floor\nNew York, NY 10022\nPhone 212-971-1306\nFax 646-350-0954\nCell\nBegin forwarded message:\nFrom: Bill Hague <\nDate: March 20, 2019 at 6:48:55 AM MDT\nTo: Richard Kahn\nCc: michael glidden\n>, Stephanie Remington\nWallace\nSubject: Re: March Barge log\n>, Daphne\nGood Morning.\nTwo days ago, I had a text conversation turned to a phone conversation with Randy King about the\nBushMaster. It's my conclusion that he is not inclined to sell the boat for much less, if any less, than his asking\nprice of over $500k. I submitted the initial offer in text. The phone conversation covered all the issues and I\ninformed him that barring any significant additions or improvements, beyond a working spud and spare\nengines, that the price was in the low 400 zone.\nHe is thinking about it and I have no way to tell if this is going anywhere. This is not the last word but is\nintended to tell you where we are at this time.\nGet Outlook for iOS\nFrom: Bill Hague\nSent: Saturday, March 16, 2019 12:07:44 PM\nTo: Richard Kahn\nCc: michael glidden; Stephanie Remington; Daphne Wallace\nSubject: Re: March Barge log\nUnderstood.\nI texted him. Here's the conversation I had last night.....\nThe gears are turning. There will be purchase questions coming your way.\nMy list of the stuff I need done like the spud rigging and spare engines and gears need to be in the price.\nHope all is well up there.\nEFTA01035418\n", "char_count": 1546}, {"efta_number": "EFTA01035418", "page_number": 1, "text_content": "Everythings good bosco. Have the lcu out today delivering some steel up river..its 65 and beautiful..hopefully\nthis lasts\nYup.\nDo you have a preferred way to be contacted about purchasing the BushMaster??\nSmoke signgals\nVery Funny.\nI'm a bit freaked out here. I just got an email telling me they want ME to do the negotiation on this deal.\nI told them it would be like giving a problem child a loaded gun.\nHelp me out here. I want the boat and your spare mains and gears if you got them. I want the anchor and the\nframe so I can put it back as I'm gonna need it. I need the spud thing to work or instructions on how you'd rig it\nup. You've got a plan and I'd like to see it done. Anything else that ya got for the big dog that goes on it I'd like\nto have.\nBesides, if we go sending smoke signals, we are gonna get accused of Cultural Appropriation. It's New York\nafter all....\n(1/3) Id be a bit freaked out too. Id be inclinded to see where your sides head is at as we go forward. I do have a\nclean set of 12v71s that were to be spares f\n(2/3) or either of my boats that could go with it and im working with the hydraulics company to get my spud\nand future wireless hydraulic set up under the big q\n(3/3) uote that they gave me\nI told them what I saw and suggested a list of stuff we were gonna have to do to make it work well for us, that\nincluded adding hydraulic rams for the gate like we did on the Mike Boat. I'd like to discuss what you think of\nthe yard you use in LI and see if I can get that ramp Wouk done there?? I remember you saying something\nabout them building billable hours, so I'd like to get some clarification about whether you trust them or wether\nsomeone might have to watch them constantly??\nThey are ready to sign a big check for the boat.\nThat yard was in virginia\nYards up here are expensive\nOh.. which one?? I did a lot of work in those yards when I was as young as you.\nColonas. Norfolk Ship... before it was Tennaco...\nMoon's too.\nThis was lyon i believe\nColonas i hear good things\nOk.\nBTW.\nI think it's cool that Madeline Marine is the BushMaster !!\nVery Cool.\nI didn't mention any prices yet. gonna ask about the quote for the spud operating system and then I'll\ndeliver the offer.\nWhat do ya think, coach??\nGet Outlook for iOS\nFrom: Richard Kahn\nSent: Saturday, March 16, 2019 11:25:03 AM\nEFTA01035419\n", "char_count": 2334}, {"efta_number": "EFTA01035418", "page_number": 2, "text_content": "To: Bill Hague\nCc: michael glidden; Stephanie Remington; Daphne Wallace\nSubject: Re: March Barge log\nOur goal is to end up in the 4's but if we start there it will never happen...\nWhy don't you have another conversation with seller making him aware of all work and costs needed and then\nsay based on that we will have to purchase in the 3's...\nYou can report back on his reaction and also quantify what you imagine costs to be to make barge operational\nThanks\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue, 4th Floor\nNew York, NY 10022\nTel 212-971-1306\nFax 212-320-0381\nCell\nOn Mar 15, 2019, at 6:46 PM, Bill Hague <\nJeepas Rich.\nYou don't want me doing this....really.\nwrote:\na Goy for goodness sake. I SUCK at negotiation. It's like giving a problem child a loaded gun...\nIn a way, it kinda makes sense for me to talk to him but your gonna have go give me some insight, plus I\nthink we would be lucky to get him to sell it for 4 with another set of main engines he has in the yard.\nIs 4 a reasonable ending point or am I not focusing on the fact that the boss said 3.. ???\nGet Outlook for iOS\nFrom: Richard Kahn <\nSent: Friday, March 15, 2019 17:10\nTo: Bill Hague\nCc: michael glidden; Stephanie Remington; Daphne Wallace\nSubject: Re: March Barge log\nbosco thanks for your analysis\njee said that based on the amount of work needed that you should make an offer of $300,000\nplease advise on feedback once offer is made..\nthank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\ntel 212-971-1306\nfax 212-320-0381\ncell\nEFTA01035420\n", "char_count": 1576}, {"efta_number": "EFTA01035418", "page_number": 3, "text_content": "On Mar 11, 2019, at 2:39 PM, Bill Hague\nwrote:\nI was told JEE wanted a bigger barge to handle more load. The way the Bushmaster is equipped, it can do\nlots more than just haul stuff around.\nThe present barge we have is still capable and is only limited by its size\nThe Bushmaster has many more capabilities that\nGet Outlook for iOS\nnot gonna put down in text.\nFrom: Richard Kahn\nSent: Monday, March 11, 2019 14:11\nTo: michael glidden\nCc: Stephanie Remington; Bill Hague; Daphne Wallace\nSubject: Re: March Barge log\ni appreciate everyones feedback\nmy big question is:\ndid this process start as jee wants a new barge or is it that bosco believes our barge's useful life is limited...\nor both..\nplease advise\nthank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\ntel 212-971-1306\nfax 212-320-0381\ncell\nOn Mar 11, 2019, at 1:33 PM, michael glidden\nwrote:\nBosco is recommending we enter into negotiations to purchase this boat based on it's merits and the other\noptions out there that are anywhere close to what would work for us. Geographical location has also been\ntaken into consideration regarding the other options.\nWe would like to discuss this with JE while he is here this week.\nYour thoughts?\nEFTA01035421\n", "char_count": 1250}, {"efta_number": "EFTA01035418", "page_number": 4, "text_content": "Begin forwarded message:\nFrom: Bill Hague\nSubject: March Barge log\nDate: March 3, 2019 at 8:17:18 PM AST\nTo: Michael Glidden <\n>, mike grysko\nMarch Barge log\n3-1 Friday\nHead installed and engine started.\nFly to NY to inspect Bush Master.\n3-2 Saturday\nSnow hampers inspection of exterior.\nVessel sound but not Bristol. Plenty of system documentation. Systems have age, are not pretty, but are\nneat. Fire fighting system is not tested by present owner. This system is reported to be a crash bilge\npumping system as well but remains untested. Upgraded propulsion controls reported and felt.\nElectronics reportedly functional.\nIt's a big vessel. It has a lot of systems. Reportedly the hydraulic controls need to have the flow control\nincreased to increase response time. Engines and generators appear neat and well maintained. In frame\nmain engine rebuilds reported performed while owned by the NCDOT.\nSome exfoliation corrosion visible in the steering compartment.\nWiring and races show age but no visible sign of defect.\nInsulation. Vessel built in 1976. It is assumed it is compliant with the 1975 ban on asbestos use.\nHVAC is functional in galley and berthing areas. Galley equipment present and reported functional\nincluding refrigeration and a big freezer.\nStarboard engine muffler shows evidence of an exhaust leak. Rear anchor and mounting bracket\nstarboard side, removed but held by owner. Anchor windlass and cable appear good. Port fed side holds a\ndeployable heavy steel stabilizer pylon that reportedly has a new winch and controller to be installed.\nMain cargo deck has been plated over with reportedly 1/2\" steel plate for previous loose material\ntransportation missions. Other modifications have been made to bulwarks for utility. Cargo deck shows\nplenty of evidence of use, wear and tear and also shows corrosion control efforts and good coating to\nprevent more wastage. (Not structural)\nSea trial Sunday AM\n3-4 Sunday\nGreatly improved weather. Inspected ramp, loading deck and all interior spaces forward and amidship.\nSolid condition throughout but work needed on the paint or coatings due to damage from heat from\nexterior plating work that was noted in inspection. Hatch doors on wing wall access at gate need work.\nSome interior exfoliation was observed midship port side in Tank room. Sewage treatment system NFG,\nsmells a bit and is used only as a holding tank for waste.\nWorkshop is full of spare parts and electrical equipment too numerous to mention tools, grinders and\npainting gear.\nDuring sea trail gen 1 had a heating issue and gen 2 brought on line. Stbd main stalled at shift and had to\nbe restarted in the engine room. Vessel is strong and smooth underway.\nNo smoke when at operating temp.\nWith a two ton load of industrial refuse forward and a half load of fuel, BushMaster made 9 knots\nsmoothly at 1600 rpm with a less than clean bottom. Very good for a 200 ton boat. It's nearly silent\ncompared to the LSJ Barge.\nEFTA01035422\n", "char_count": 2960}, {"efta_number": "EFTA01035418", "page_number": 5, "text_content": "Spud deploy/recover system needs completion.\nFuel gauges have an electrical flutter that needs diagnosis.\nAnchoring needs to be addressed. The original anchor and mounting is removed but available. Reinstall\nStart and stop capability of all power producing equipment needs installed in pilot house.\nRadar operation is questionable and should be considered NFG. Autopilot should be tested and all\nelectronics, including chart plotter should be confirmed compatible for communication and function.\nConsideration should be given to changing the existing ramp cable hoist lifting system to one similar to\nthe one we made for the LSJ Barge. Additionally, with design and construction work, the rear ramp can\nbe made to allow rear, roll on capability wherever draft at the ramp is sufficient.\nConclusion.\nThis boat works. It needs upgrades and modification to be more ideal for our application but it's a worthy\ncandidate, and it's location is really handy.\nReturn flight canceled and rebooked due to weather. Newark/ Charlotte/St Thomas beginning 08:30\nMonday.\nEFTA01035423\n", "char_count": 1069}]}