{"efta_number": "EFTA01035134", "page_count": 1, "url": "https://epstein-data.com/EFTA01035134", "pdf_url": "https://epstein-data.com/pdf/EFTA01035134.pdf", "pages": [{"efta_number": "EFTA01035134", "page_number": 0, "text_content": "From: Larry Visoski\nTo: Je vacation <jeevacation@gmail.com>\nSubject: Flight time\nDate: Sat, 23 Mar 2019 12:51:02 +0000\nJeffrey\nParis to Doha is 5+55min (+27kt tailwind).\nG550, the 24 Month inspection is due by March 31st, Pete already accomplished all the 24month items while in\nTeterboro during the last few trips, the only thing he could not accomplish was the Gear inspection, this has a 15\nday grace period, which brings us to April 15th due date for the Gear.\nGIV, Requires the 36month inspection due by March 31st as well, which gives us until april 15th as well.\n***Both are calendar inspections that have a 15 day grace, the aircraft can fly after april 15th, with NO\npassengers, and requires a FAA Ferry Permit to the fly to the Mx facility for its inspection as last resort, if\nneeded.\nHope this helps\nThx\nLarry\nSent from my iPad\nEFTA01035134\n", "char_count": 853}]}