{"efta_number": "EFTA01034720", "page_count": 2, "url": "https://epstein-data.com/EFTA01034720", "pdf_url": "https://epstein-data.com/pdf/EFTA01034720.pdf", "pages": [{"efta_number": "EFTA01034720", "page_number": 0, "text_content": "From: Stephanie Remington\nTo: J <jeevacation@gmail.com>, Richard Kahn\n,michael glidden\nSubject: Progress Report_032519_033119\nDate: Fri, 29 Mar 2019 19:36:24+0000\n, Daphne Wallace\n>, Patrick Cena\nPlease note:\nThis is a summary of the last week's focus, not a comprehension of all projects.\nCarpentry. Continue work on lattice frames for tiki. Assisted with added tiki tile. Tile work complete.\nBuilding new doors for FPP. Weatherproofing roof connection between tiki kitchen and main tiki on\nLSJ. Loaded F450 with all GSJ kitchen cabinets and appliances from tunnel storage and transferred to\nGSJ container.\nElectrical/Plumbing. Install new lights in FPP kitchen. Replaced lights and bulbs in library. Installed\nnew water pump at FPP cabana for bathroom and kitchen. Added landscape lighting up to LSJ\nCabana drive. Assisted with emptying and moving containers and relocating contents.\nEngineering. Fluid check - all equipment. Commissioned new lull. Tropical run for hitch, installed on\nnew tractor. Inaugural water wagon run w JD tractor to GSJ and went well. Installed hammer (again)\non Cat 325. Clean carmix. New tires, change electrical cable on bikes. Polaris work. Worked on\nPolaris, Quadski, Dump Truck. Change batteries on roller compactor. Clean F450. Clean tire changing\nroom. Put tracks back on 307 cat. Clean wreck shop and vehicle storage area.\nHeavy Equipment. Transitioned and set containers from LSJ to GSJ. Trenching for Liston at LSJ\ntower. Made more stone at pebble beach for Dupson. Clear out entire footprint of \"The Barn\" on GSJ.\nAssisted with landscaping on GSJ beach area (grass, seagrapes, ficus). Cleaned Blue Beach.\nOngoing seaweed battle.\nHousekeeping. Usual rounds. Laborers brought in to move heavy items in storage areas and clean\nunderground spaces.\nLandscaping/Masonry. Received and caring for large ABC shipment that looks mostly dead but they\nwill work their magic. Pebble beach is ongoing. Completed forming 5 Palms bunker. Will be poured\nMonday morning, weather permitting.\nMarine. Maintenance on trailers - tongues, tires, hubs, stands, wheel bearings, carpeting, derusting.\nReplaced steering cylinder on Little C. New props on Little C. Haulout and pressure wash Sportis and\nZodiac. Nanna maintenance, oil change, fuel filters.\nPainters. Continued painting hardware around main compound. Began fresh coat of paint in Cabanas.\nRO/Maintenance. Oversee cistern cleaning and sealing. Acquired pump for FPP kitchen/bath.\nStandard pool and RO maintenance.\nContractors on island:\nAbsolute Flooring - work complete.\nJeffers - Coloring shipping next week.\nEFTA01034720\n", "char_count": 2600}, {"efta_number": "EFTA01034720", "page_number": 1, "text_content": "Danny - Continuing work on MC Flower Bed.\nKitchen Solvers - Countertops scheduled for install May 3-6.\nPaul's Petroleum - added check valve to gasoline pump to eliminate delay.\nOther Notes:\nRust remediation. Attaching photo file.\nMaster cistern. Cleaned. First round of thoroseal complete. Will repeat thoroseal in one week.\n5 Palms Power. Trenching to begin Tuesday.\nRubbish. All trash bins on GSJ emptied.\nProposal for storm Shutters for RO, Generator, GSJ staff cottage, LSJ staff cottage - submitted to\nRich and was approved.\nAll interior and exterior doors for RO, generator buildings ordered.\n40X60 replacement building for engineering has been ordered.\nConstruction drawings for GSJ staff cottage have been submitted.\nNext week's focus will be putting cabanas 1-4, the flagpole pool, chillax room and bath, and library\nback together after floors have adequately cured.\nStephanie Remington\nLSJE, LLC\nEFTA01034721\n", "char_count": 919}]}