{"efta_number": "EFTA01030145", "page_count": 4, "url": "https://epstein-data.com/EFTA01030145", "pdf_url": "https://epstein-data.com/pdf/EFTA01030145.pdf", "pages": [{"efta_number": "EFTA01030145", "page_number": 0, "text_content": "From: J<jeevacation@gmail.com>\nTo: Stephanie Remington\nSubject: Re: Progress Report 02/04/19-02/17/19)\nDate: Mon, 18 Feb 2019 18:19:04 +0000\nSylvester was here\nOn Mon, Feb 18, 2019 at 1:28 PM Stephanie Remington\n> wrote:\nSir, the person's are Sylvester, Okeam, and Kyle. I haven't released anyone yet.\nOn Mon, Feb 18, 2019 at 1:19 PM J <jeevacation@gmail.com> wrote:\nwhy not now, it three names?\nOn Mon, Feb 18, 2019 at 1:15 PM Stephanie Remington\nWill cover with you when we met in the morning.\nwrote:\nOn Mon, Feb 18, 2019 at 7:56 AM J <jeevacation@gmail.com> wrote:\nclosing hindges? new carpenter? back terrrrace light. pool door handle? hirings/ pebble beach\npour?? carmix. operator jeffers start date.?. color for concretee?\nOn Mon, Feb 18, 2019 at 4:14 AM Stephanie Remington\nGood morning, Sir,\nwrote:\nThank you for this time with my mother. I'll be back to work tomorrow. Do you want to meet with me\nbefore you go?\nStephanie Remington\nLSJE, LLC\nOn Sun, 17 Feb 2019 at 17:35, J <jeevacation@gmail.com> wrote:\nnames of people to be released, ALWAYS.. pebble beach pour\"?\nOn Sat, Feb 16, 2019 at 10:04 AM Stephanie Remington\nPlease note:\nwrote:\nThis is a summary of the last two weeks' focus, not a comprehension of all projects.\nCarpentry. Repaired coral stone at chillax bath. Cut in sink, cooktop in temporary\ncountertop at FPP Kitchen. Moved kitchen equipment for tiki floor prep. Assist w Tiki\nCeiling - GSJ. Self-closing hinges on doors at MC. Replaced warped pressed wood\nlouver doors by kitchen with new wood doors and reinstalled hardware correctly.\nReoriented Grotto roof.\nElectrical/Plumbing. New landscape lighting along MC pool. Repaired landscape\nlighting everywhere including main feed where desal trench was dug. Water heater\nreplaced GSJ. Bulb replacements. Flushed water systems at master bath. Permanent\nlighting to all dock structures. Moved electrical, vanities, installed sink plumbing to ready\ncabanas - LSJ.\nEngineering. Pressure wash karts, rock crusher, car mixer. Cleaned back rooms of\nwreck shop. Changed attachment, flat tires, other maintenance on lull JLG. Continued\nEFTA01030145\n", "char_count": 2114}, {"efta_number": "EFTA01030145", "page_number": 1, "text_content": "work on ambulance. Parts order w/Daphne. Repaired water tank. Assisted w/barge runs,\nhaul away old mule, batteries, locate tech-ambulance. Assist w/removal and replacement\n- light generators from beach.\nHeavy Equipment. Closed existing pit. Grated roads - both islands. Beach Cleanup\n- both islands. Jackhammered stone, outcropping to smooth beach - GSJ, cleaned\nrocks off beach. Assist with moving shipments on barge. Fuel truck for diesel filled and to\nGSJ.\nHousekeeping. In addition to usual rounds - GSJ and LSJ, Cleaned out, moved\nCabana items out of gym, ballet room - clean and up. Cleaned out, moved furniture, set\nup Cabanas.\nLandscaping. Worked with Boschulte overall landscaping, improvements. Layout for\nnew flower bed at MC Pool. Moved rest of turpentines. Moved some palms from LSJ to\nGSJ. Cleaned roads, maintenance for boss. Orders for jasmine, trimmers from FL.\nMarine. Sportis work complete. Little C in for Maintenance. Using barge for morning\nand afternoon crew runs at this time.\nPainters. Continue paint cleaning. Cleaned glue mess from exterior MB mirrors.\nFinished epoxying tunnel floors. Paint louver doors. Paint grotto. Patching - screw and\nnail holes. Began application of Clearashield on Cabanas. Rust remediation at FPP.\nRO/Maintenance. Routine maintenance, pools. Work with Gemini. Assist with vehicle\ncleaning.\nContractors on island:\nPeter Elie - Leveled tiki kitchen, Pebble Beach materials and prep for pour\nJeffers - Work with Mike for supply deliveries - road project\nBoschulte-landscaping/tree relocations\nReefco - repairs and maintenance\nGemini - RO\nEB - GSJ\nGrand Design - Countertops\nDanny - MC Pool Wall\nMany thanks to all for all the hard work.\nOther Notes:\n• Master Deodorizing - cleaning, airing, clearing drains, Karyna-list approved\nodor eaters placed, ionizer ordered and coming on plane, meanwhile borrowed\none from Reefco. Reefco scheduled to replace old ductwork and pull apart and\nthoroughly clean air handler in attic in coming week\n• All stock on STT in black self-closing 4\" hinges purchased and installed at MC,\nmore to come on plane\n• Principal noted incorrect installation of hardware on louver door by kitchen.\nUpon further inspection pressed wood door veneer peeling, warping, so\nreplaced with wood door and installed hardware correctly\n• Principal here w/ 2 architects 02/16 - 02/19. No work except housekeeping in\nmornings - Sunday (02/17) and Monday (02/18) - holiday weekend. Capt.\nPatrick here for island grounds, boating needs. Sheridon on standby as second\nEFTA01030146\n", "char_count": 2536}, {"efta_number": "EFTA01030145", "page_number": 2, "text_content": "captain. Anna on island to address household needs. Stephanie out for\nweekend for pre-scheduled plans. Capt. Randy on vacation.\n• Cabanas 1 & 3 up but countertops subpar. Cabana 4 up except needs wifi.\nCabana 2 a/c condenser went down 02/15. Located Kitchen Solutions estimate\nafter search of KG's old email. Estimate attached. Image of Dekton countertops\nhere: https://www.mkwsurfaces.co.uk/dekton-halo/. Has this been reviewed\nalready?\n• Was left out of communication, re: Absolute Flooring scheduled for 2/18.\nFound out yesterday 02/15. Would recommend postponing if possible until\nadequate countertops in place so as not to risk damage to new floors.\n• Fran scheduled Saturday (02/16) - to look at Carmix/Concrete Truck -\npossible operator for Pebble Beach Pour, etc.\n• Tiki floor leveled by Peter Elie. Scheduled for tile this coming Wednesday.\n⚫ BOLS containing Tractor, Electric Car on LSJ\n• Jeffers - 2 pcs of equipment will be delivered this coming Tuesday (roller,\nbackhoe)\n• Replacement mirrors for master bath ready for pickup and installation\n• Expensive tool believed to be stolen. Sent recommendations to Rich for\nsecurity measures going forward. Involves turning storage room in tunnel into\ntool room with tool guy who will clean, maintain, inventory, replace tools. Tools\nwill be checked out. Responsible party will pay for replacement if lost on his\nwatch. Bag checks reinstated.\n• Sent some staffing transition recommendations to Rich. Identified carpenter\nfor projects but searching for permanent solution. In addition, recommend hire\nof four interim persons to be reviewed after 90 days: 1.) Landscaping, 2.) Rust\nRemediation Guy, 3.) Tool Guy, 4.) Admin Assistant for Stephanie (New\nRequest). Applications of interested persons are in hand. May I proceed? Will\nrelease one employee, one contractor. Second contractor under review.\nStephanie Remington\nLSJE, LLC\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA01030147\n", "char_count": 2494}, {"efta_number": "EFTA01030145", "page_number": 3, "text_content": "please note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nStephanie Remington\nLSJE, LLC\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nStephanie Remington\nLSJE, LLC\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA01030148\n", "char_count": 1867}]}