{"efta_number": "EFTA01021130", "page_count": 1, "url": "https://epstein-data.com/EFTA01021130", "pdf_url": "https://epstein-data.com/pdf/EFTA01021130.pdf", "pages": [{"efta_number": "EFTA01021130", "page_number": 0, "text_content": "From: Richard Kahn\nTo: Jeffrey Epstein <jeevacation@gmail.com>\nSubject: Flagpole pool\nDate: Tue, 02 Oct 2018 18:05:36 +0000\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\ntel\nfax\nce\nBegin forwarded message:\nFrom: Rick Rossi\nSubject: pool\nDate: October 2, 2018 at 2:04:37 PM EDT\nTo: Richard Kahn\nbrice gordon\n>, Kyle reavis\nGood day all, Just wanted to give an update on the status of the pool.\nThe plaster work went very well, however in the acid wash and power washing of the pool in preparation of\nputting the Kristacure (sealer) we felt that the pool would benefit from being filled with water first for a few\nweeks.(This is the normal start up procedure) During this time have Smiley brush it daily or as often as he's\nable, to even up the surface a little better so when it's sealed the pool looks the best it can.\nThe Blue and other colored plasters are very difficult to get the finish uniform and I'm confident this additional\nstep before sealing will do the trick.\nIt is important that the PH stay at or close to 7.0 for 30 days .(this is done with the addition of Muratic acid)\nAdditionally chlorine can be added on Friday. No calcium is to be used. The salt system should not be used\nduring this time as well.\nAfter this period the pool can then be drained and sealed as planned.\nPlease call me or email if you have any questions.\nThank you\nRick Rossi\nEFTA01021130\n", "char_count": 1413}]}