{"efta_number": "EFTA01013203", "page_count": 2, "url": "https://epstein-data.com/EFTA01013203", "pdf_url": "https://epstein-data.com/pdf/EFTA01013203.pdf", "pages": [{"efta_number": "EFTA01013203", "page_number": 0, "text_content": "From: michael glidden\nTo: J<jeevacation@gmail.com>\nCc:\nKahn\nSubject: Re: Barge\nDate: Tue, 18 Dec 2018 15:15:06 +0000\n>, LSJ GSJ\n>, Kyle reavis\n>, Richard\nGood Morning.\nWith regard to the barge, 3 weeks is the expected time needed for the exhaust work, the rub rail installation, and\nalso inspect and address rudder alignment along with propeller inspections. There is also a list of general\nmaintenance items Boscoe has that can be attended to while out of the water for that 3 weeks.\nWith regard to the scope of electrical work to be done there are two items on LSJ that will be done with a\ncombination of in house labor and local contractors. They would be the duc bank from the generator building to\nthe sea water intake building that will include the new fiber for the desal system and the repair of the 5 palms\nelectric and fiber feeds due to your request that the work be done as soon as possible.\nThe material for the duc bank is on island and the material list for 5 palms is going out today for pricing. I was\ngoing to have LSJ purchase all the material and have a local contractor install for which I am going to get two\nprices.\nThe only area where the amount of potential work is likely to interest a stateside company would be GSJ.\nThe issue with getting bids at this point is any scope of work that may be put into a list is simply an idea with no\nengineering or design to base an actual bid on.\nBefore you can issue a scope of work to be bid on there needs to be a considerable amount of time and money\nspent with an engineering and design firm to produce drawings and/or designs, on paper, that contractors can\nthen put a dollar figure to.\nI reached out to Springline for this specific purpose and they declined,as have Jaredian Design.\nA stateside contractor may be interested in doing design-build and maybe that would be a path to explore but I\ndo not have any connection with a company of that type.\nOn Dec 17, 2018, at 4:31 PM, J <jeevacation@gmail.com> wrote:\nhow many days neeeded. . what work still required barge. other boats ready\nthe scope of elecrtic jobs needed as we discussed a week aglo\nOn Mon, Dec 17, 2018 at 2:45 PM michael glidden\nGood day.\nwrote:\nmore inportantly is where is\nIs there any update as to when scheduling can be made for the maintenance and exhaust work needing to be\ndone on Big N?\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\nEFTA01013203\n", "char_count": 2617}, {"efta_number": "EFTA01013203", "page_number": 1, "text_content": "communication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA01013204\n", "char_count": 339}]}