{"efta_number": "EFTA01013121", "page_count": 1, "url": "https://epstein-data.com/EFTA01013121", "pdf_url": "https://epstein-data.com/pdf/EFTA01013121.pdf", "pages": [{"efta_number": "EFTA01013121", "page_number": 0, "text_content": "From:\nTo: Zorro Ranch\nCc: \"jeffrey E.\" <jeevacation@gmail.com>, Rich Kahn <\nSubject: ZM HWR Air Pro\nDate: Tue, 18 Dec 2018 20:35:07 +0000\nAttachments: ZM_Air_Pro_HWR_Repair.pdf; IMG-0863.JPG; IMG-0862.JPG; IMG-0860.JPG; IMG-\n0861.JPG; IMG-0859.JPG; IMG-0864.JPG\nAfternoon\nFYI\nAttached invoice for payment and photo's to support work performed\nThe HWR line going to Mech Bay 1 in the Main house at Zorro developed leak\nThis was due to the line rubbing against the concrete bore hole accessing the basement\nThe other lines for CTW, CWS, HWS are all in good condition, this seems to be a one off situation\nThe Repaired Line has been Insulated, Dirt and Landscape Material has been replaced\nFor the Record, the HVAC system can not operate independently of the Hot Loop in the Winter. There is a requirement for hot water to mix\nwith the Cold Water Supply to be able to operate the Heat Pumps as a heat source. Loop Temps can get into the Low Teens without a heat\nsource.\ncan you please process for approval and payment\nany concerns let me know\nthank you\nStanley, NM\nLSJ-GSJ, USVI\nPh: (\nEFTA01013121\n", "char_count": 1095}]}