{"efta_number": "EFTA01010179", "page_count": 4, "url": "https://epstein-data.com/EFTA01010179", "pdf_url": "https://epstein-data.com/pdf/EFTA01010179.pdf", "pages": [{"efta_number": "EFTA01010179", "page_number": 0, "text_content": "From: J<jeevacation@gmail.com>\nTo: michael glidden\nSubject: Re: On going work list\nDate: Fri, 28 Dec 2018 19:12:59 +0000\nRichard Kahn\nI thought air con chillax was to be finished last week. 2 do the genarators now work, you were going to get the\nfuel parts 2 weeks ago.\nOn Fri, Dec 28, 2018 at 11:17 AM michael glidden\nGood day, I apologize for the delay.\n1. Palm tree lighting. On going.\n2. Courtyard lighting. On going\n3. Landscape lighting at Master bedroom stairs. Completed\n4. Pool cabana kitchen electric. On going\n5. Main compound cabanas, electric and lighting. Completed\nwrote:\n6. Chillax a/c renovation, chandelier removal and lighting. A/c on going, chandelier and new lighting\ncompleted\n7. Dock electric, lighting, under water lighting and wifi. On going\n8. Camera at staff cottage for dock. Pending\n9. Cistern drains for main compound. Pending\n10. WAPA switch replacement. Completed\n11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for desal\ncontrols. On going\n12. Install movie room ceiling speakers and amps. Temp completed. Awaiting permanent speakers\n13. Replace all recessed lights at pool gazebo structures completed\n14. Repair 2nd pool heater at flag pole pool new unit just arrived, pending\n15. Repair/refurbish both fuel dispensers pending\n16. Complete trouble shooting/repair Diesal pump feeding dispenser on going\n17. Install new water distribution pump system for LSJ. All equipment now on island, pending\n18. Refurbish water distribution manifold pending\n19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant. Pump on\nisland, pending\n20. Address water heating issue at staff cottage pending\n21. LSJ tiki kitchen remodel electric and plumbing ongoing\n22. Blue Beach cottage transformer replacement next job for dock electrician, pending\n23. Electric and data to 5 palms. Material out to bid, Charles Electric to look at job after 1-2-19\n24. Electrical conduit work at tower antenna. Pending\n25. Solar system and electrical at Pebble Beach cottage. New roof complete, needs to be painted/sealed,\npending\n26. Power to beach for captains. Pending\n27. Larger filter for sea water intake at library/beach well. Pending\n28. Refurbish fire suppression system in generator building. Pending\n29. Fuel truck rehab per survey. Truck to be replaced, two quotes forthcoming\n30. Generator fuel system refurbishment. Pending\n31. Replacement of electric panels in both pool pump rooms. Pending\n32. Electric out to new waterfall area. Pending.\n33. Replace all exterior light trims to white due to rust on going\n34. Replace all exterior switch and outlet covers due to corrosion. On going\n35. Staff cottage dryer to be changed to propane jetting. Pending\n36. Install lighting for library statues. Pending\nEFTA01010179\n", "char_count": 2820}, {"efta_number": "EFTA01010179", "page_number": 1, "text_content": "37. Install new awnings at both pool gazebo structures. Awaiting awnings, pending\n38. Install two new sewage treatment plants on GSJ. On going\n39. Wire new generators on GSJ. On going\n40. Install new flagpole lights on GSJ. Completed\n41. Replace water distribution pump on GSJ. Completed\n42. Install electric and plumbing in new tiki hut on GSJ. On going\n43. Batteries to be replaced in GSJ solar system. Pending\n44. Daily managing of barge schedule. On going\n45. Research and order maintenance/repair parts. On going\n46. Daily maintenance of electrical and plumbing systems for both islands. On going\n47. On going installation and refurbishment of landscape lighting island wide. On going\n48. Coordinate barge maintenance/refurbishment work. Pending\n49. Coordinate with local architects for future services. On going search for one\n50. Daily issues that cannot be anticipated or avoided. On going\nOn Dec 21, 2018, at 6:16 PM, Richard Kahn <\nMike\nCan you please update your punch list with the following descriptions:\na) completed\nb) scheduled\nc) open\nAdditionally have you completed Spec List to give out to Electricians..\nwrote:\nDid Charles Electric come out this week? If not please schedule them to review appropriate work next\nweek..\nI sent Kyle their contact info earlier this week..\nIn case you never received:\n340-998-8066\n340-714-8066\nThank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\nOn Dec 1, 2018, at 10:18 AM, Michael Glidden\nwrote:\nEFTA01010180\n", "char_count": 1503}, {"efta_number": "EFTA01010179", "page_number": 2, "text_content": "1. Palm tree lighting\n2. Courtyard lighting\n3. Landscape lighting at Master bedroom stairs\n4. Pool cabana kitchen electric\n5. Main compound cabanas, electric and lighting\n6. Chillax a/c renovation, chandelier removal and lighting\n7. Dock electric, lighting, under water lighting and wifi\n8. Camera at staff cottage for dock\n9. Cistern drains for main compound\n10. WAPA switch replacement\n11. Install ducbank/trench from generator bldg to tunnel for future electric feed to GSJ & fiber run for desal\ncontrols\n12. Install movie room ceiling speakers and amps\n13. Replace all recessed lights at pool gazebo structures\n14. Repair 2nd pool heater at flag pole pool\n15. Repair/refurbish both fuel dispensers\n16. Complete trouble shooting/repair Diesal pump feeding dispenser\n17. Install new water distribution pump system for LSJ\n18. Refurbish water distribution manifold\n19. Install new sewage lift/mascerating pump for LSJ staff cottage and piping to treatment plant\n20. Address water heating issue at staff cottage\n21. LSJ tiki kitchen remodel electric and plumbing\n22. Blue Beach cottage transformer replacement\n23. Electric and data to 5 palms\n24. Electrical conduit work at tower antenna\n25. Solar system and electrical at Pebble Beach cottage\n26. Power to beach for captains\n27. Larger filter for sea water intake at library/beach well\n28. Refurbish fire suppression system in generator building\n29. Fuel truck rehab per survey\n30. Generator fuel system refurbishment\n31. Replacement of electric panels in both pool pump rooms\n32. Electric out to new waterfall area\n33. Replace all exterior light trims to white due to rust\n34. Replace all exterior switch and outlet covers due to corrosion\n35. Staff cottage dryer to be changed to propane jetting\n36. Install lighting for library statues\n37. Install new awnings at both pool gazebo structures\n38. Install two new sewage treatment plants on GSJ\n39. Wire new generators on GSJ\n40. Install new flagpole lights on GSJ\n41. Replace water distribution pump on GSJ\n42. Install electric and plumbing in new tiki hut on GSJ\n43. Batteries to be replaced in GSJ solar system\n44. Daily managing of barge schedule\n45. Research and order maintenance/repair parts\n46. Daily maintenance of electrical and plumbing systems for both islands\n47. On going installation and refurbishment of landscape lighting island wide\n48. Coordinate barge maintenance/refurbishment work\n49. Coordinate with local architects for future services\n50. Daily issues that cannot be anticipated or avoided\nThat would be all for now.\nEFTA01010181\n", "char_count": 2556}, {"efta_number": "EFTA01010179", "page_number": 3, "text_content": "please note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA01010182\n", "char_count": 611}]}