{"efta_number": "EFTA01007591", "page_count": 1, "url": "https://epstein-data.com/EFTA01007591", "pdf_url": "https://epstein-data.com/pdf/EFTA01007591.pdf", "pages": [{"efta_number": "EFTA01007591", "page_number": 0, "text_content": "From: Kyle reavis\nTo: \"jeffrey E.\" <jeevacation@gmail.com>\nCc:\nMichael Glidden\n, Richard Kahn\n, Daphne Wallace\n>, LSJ\nSubject: Concrete Pour 8-24-18: Canceled\nDate: Fri, 24 Aug 2018 12:20:34 +0000\nGood Morning Mr Epstein,\nThe barge ramp will not be poured today. Ortalis Concrete has had multiple issues that have caused this delay,\nyesterdays big issue was them not showing up to barge pick-ups on schedule, sometimes 1-2 hours late. The\nbiggest today one is that both of their self mixing trucks came into their yard last night broken down around 10\npm. This morning they are being repaired and computers are being re-calibrated and I am told they will be up\nand running this afternoon. If they are not on island today we will have to push back until Monday. As long as\nthey are running properly we can get them onto the island in the late afternoon and ready from an early Saturday\nmorning pour. If we start at 7 am pouring and these trucks can produce the 15 yards an hour I am promised by\nOrtalis we will be done with the concrete and cleaned up around 2 pm. Please let me know if you have any\nissues with this schedule and if so I will push back the pour to Monday. Thank you!\nVery Respectfully,\nKyle W Reavis\nEFTA01007591\n", "char_count": 1229}]}