{"efta_number": "EFTA01006971", "page_count": 1, "url": "https://epstein-data.com/EFTA01006971", "pdf_url": "https://epstein-data.com/pdf/EFTA01006971.pdf", "pages": [{"efta_number": "EFTA01006971", "page_number": 0, "text_content": "From: Ann Rodriquez◄\nTo: \"jeffrey E.\" <jeevacation@gmail.com>\nCc:\nFraguela\nSubject: Re: priority list\nDate: Thu, 21 Dec 2017 18:17:12 +0000\nRichard Kahn\nJimmy\n1. heli house roof: Sylvester and Maho will begin on Tuesday (Monday Holiday)\n2. engineering gates. Boniface & James will begin on Tuesday(Monday Holiday)\n3. gym wall lights and lanterns on posts: Ordered. Awaiting arrival (I'll track today)\n4. we need new wood dial. and i need to set it: I'll ask Sylvester to work on it in between his other projects until\nour New Carpenters arrive\n5. waterfall: Chris said that he will start tomorrow morning on the Waterfall\n6. flagpole building make larger: -Jimmy-\n7. we should have extra windscreens that sylvester built re hang: Will do\n8. new birdfeeders: in stock on LSJ. I'll replace\n9. crowon moudlings: -Jimmy-\n10. grates are rusty: I'll have TJ and his guys rust buster and paint everything\n11. door hindges: Ordered. Awaiting arrival (I'll track today)\n12. lights by mosaic throw out: will do\n13. paint outside shutters.\n14. lights on master roof need repair: I'll put Danny on it\n15. METAL SHUTTERS should be closed when i am not in residience: will do\n16. MIRROR did we order? Yes, Ready for pickup tomorrow Friday. Danny have the check for pickup tomorrow\n17. above windows: Jimmy to advise\n18. tiki entry pebbles redone: will do\n19. wall colappsing: I'll have Dupson & Dalce start working on all stone walls\n20. plant a palm lat pebble beach house: will do\n21. blue house, new air con and repaint.: blue beach will be worked on Tuesday (Monday Holiday)\n22. waterfall: Chris said that he will start tomorrow morning on the Waterfall\n23. rebild dock shelter: -Jimmy-\nAnn R.\n> On Dec 20, 2017, at 10:15 PM, jeffrey E. <jeevacation@gmail.com> wrote:\n>\n> heli house roof 2 engineering gates. 3 gym wall lights and lanterns on posts 4 we need new wood dial. and i\nneed to set it. 5. waterfall. 6 flagpole building make larger. 7 we should have extra windscreens that sylvester\nbuilt re hang. 8 new birdfeeders 9 crowon moudlings. 10. grates are rusty\n> 11,door hindges. 12 lights by mosaic 13throw out 14, paint outside shutters. 15, lights on master roof need\nrepair and METAL SHUTTERS should be closed when i am not in residience 17 MIRROR did we order? 18.\nabove windows. 19, tiki entry pebbles redone 20 wall colappsing. ? 21, plant a palm lat pebble beach house\n> 24 blue house, new air con and repaint. 25. waterfall, 26, rebild dock shelter\n> --\nEFTA01006971\n", "char_count": 2472}]}