{"efta_number": "EFTA00934121", "page_count": 3, "url": "https://epstein-data.com/EFTA00934121", "pdf_url": "https://epstein-data.com/pdf/EFTA00934121.pdf", "pages": [{"efta_number": "EFTA00934121", "page_number": 0, "text_content": "From: Craig Martin\nTo: Jeffrey Epstein <jeevacation@gmail.com>\nSubject: Re: Staffing Guide\nDate: Mon, 23 Apr 2012 21:34:35 +0000\nGreat\nThanks\nCraig\nFrom: Jeffrey Epstein <jeevacation@gmail.com>\nTo: Craig Martin\nSent: Monday, April 23, 2012 5:31 PM\nSubject: Re: Staffing Guide\nyou and i will discuss tomoorow.. I agree, i am not sure why we need a new shed.. plus plus\nOn Mon, Apr 23, 2012 at 5:29 PM, Craig Martin <\nwrote:\nHere is a proposed draw down of staffing. As construction ends we will have to retrain staff to fit into their\nnew roles.\nThis does not take into account retraining the boat captains to preform other duties as yet.\nProposed Staffing Guide\nMay 5th\nSept 1st\nDec 1 st\nIsland Managers 2\nHead Engineer/Maintenance\n1\n1\n1\nBoat Captains\n2\n2\n2\nBoat Mate\n1\n1\n1\nEngineering\n4\n2\n2\nMaintenance\n5\n3\n2\nHead Grounds Man\n1\n1\n1\nLandscaping\n7\n7\n5\nHousekeeping\n4\n3\n3\nPart Time Housekeeping\n1\n1\nTotal\nF\n25\n21\n18\nJeffery;\nHere are some thoughts on support staffing.\nEFTA00934121\n", "char_count": 980}, {"efta_number": "EFTA00934121", "page_number": 1, "text_content": "Engineering/Maintenance\nFor Discussion only;\nAs discussed most of the islands staffing is now involved in construction not on island maintenance. As the\nconstruction winds down the staff in engineering, maintenance and marine services should have more time\nto perform their permanent jobs. If we can teach them to multi-task we should be able to shrink the staff.\nBetween engineering and maintenance there are currently 9 people. Marine services has 3pp plus the head\nengineer position (Arran), makes the total support staff 13pp. This is an extremely large support staff for the\nisland.\nManagement is currently looking at the staffing by who is there and how they fit into the current/new\nstaffing structure. We need a new structure. If you look at the staffing from a larger/different prospective,\nthough, you would have a smaller staff that is trained in multi areas. We need more out of the box thinking.\nTo get to this point the current staff might have to be retrained or replaced. This may take several months to\naccomplish but could be done. We need a new org chart in this area.\nExamples;\nMaybe there is a marine mechanic that is the second boat driver who also runs the RO plant and is the\nisland mechanic. When the island stops maintaining construction equipment and much of the equipment\nleaves the island and there is fewer boats to maintain, this may be possible.\nHead Engineer that is also a carpenter or a plant operator.\nPainter/ Carpenter/maintenance combined.\nElectrician/plant operator/irrigation (electronic side) technician.\nThese are just suggestion for discussion, but I think you can see where we could be going.\nStructure;\nCurrently engineering reports to Aaran, maintenance to Brice, marine to both.\nFuture; There should be one person to handle all. They can then supervise all support staff and deploy them\nas needed. Landscaping might want to fall here also.\nAreas of work/Buildings. Although this may sound trivial I do not believe the staff should be spread out in\n3 or 4 different buildings. This makes is very difficult to supervise them and to have them multi task.\nCurrently, carpentry is in the building by the dock, electricians in the RO building, mechanics in the shed\nand management in a separate building. It is almost impossible to manage and supervise the staff that way.\nAll the work spaces are over sized and could be smaller and more efficient if redesigned correctly. I would\nalso avoid walls and use more fencing/windows where possible. You need to be able to see the staff working.\nExample (for discussion)\nIn the RO building have a carpenter shop, paint, electrical, plumbing and a glass enclosed managers office. I\nbelieve this may fit.\nTo accomplish this;\nQuads would go to dock side building.\nStorage to dock side building.\nElectrical shop to shrink.\nEngineering storage to the two empty generator bays.\nThe proposed new metal building would be a great asset but if you do not want to spend $250,000 on the\nbuilding you could;\nEFTA00934122\n", "char_count": 2993}, {"efta_number": "EFTA00934121", "page_number": 2, "text_content": "Clean up current mechanics building.\nThrow out much of the material there.\nKeep sensitive equipment/machinery in dockside building. There are 3 more containers in that building\nusing valuable space as well as a large carpenter shop, large marine services shop that would have to be re\npurposed/moved/reconfigured.\nLarger equipment would be kept in current engineering shed/structure.\nThese are just some ideas for discussion.\nThe point is the way the support staff is currently structured will lead to a larger staff than you want. I\nbelieve we should start with making the physical plant more efficient and then reducing the staff.\nCraig\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA00934123\n", "char_count": 1848}]}