{"efta_number": "EFTA00930482", "page_count": 5, "url": "https://epstein-data.com/EFTA00930482", "pdf_url": "https://epstein-data.com/pdf/EFTA00930482.pdf", "pages": [{"efta_number": "EFTA00930482", "page_number": 0, "text_content": "From: Jeffrey Epstein <jeevacation@gmail.com>\nTo: brice gordon\nSubject: Re: FW: Heavy Material\nDate: Tue, 06 Mar 2012 11:45:25 +0000\nthese numbers are not right\nOn Tue, Mar 6, 2012 at 6:58 AM, brice gordon\nJeffrey\nRich is requesting your approval to purchase heavy material\nwe need this if we are to continue pours this week\ndo we have your approval for 38k heavy material\n-Forwarded message\nFrom: Monique Harry\nDate: Mon, Mar 5, 2012 at 10:20 AM\nSubject: FW: Heavy Material\nTo: Brice Gordon <\nCc: Rich Kahn <\nThomas Melnick\nwrote:\nBrice,\nPer your request total estimated cost for project needing aggregate on LSJ (Stone, Columbian Sand, &\nManufactured Sand) is $38,216.66. (Trucking included $6,561.00) Detail as followed below.\nGrotto 35 yards = $3,039.62\nFlag Pole 75 yards = $6,521.17\nHeli pad 40 yards = $3,178.92\nTriangle 60 yards = $5,222.34\nSundial 10 yards = $667.89\nFive Palms 65 yards = $5,901.28\nDuct Bank 80 yards @ Five Palms including 3 add loads of MFS for underground work = $11,502.72\nMisc Pour 25 yards = $2,182.72\nI can also provide the total dollar amount of sand, MFS, and stone per each job if needed.\nMONIQUE HARRY\nProject Administrator\nLSJ, LLC\nTelephone\nEFTA00930482\n", "char_count": 1193}, {"efta_number": "EFTA00930482", "page_number": 1, "text_content": "From:\nTo:\nCC:\nSubject: FW: Heavy Material\nDate: Wed, 22 Feb 2012 13:07:40 -0400\nRich,\nAverage of material used is based on type of concete mix. (ex. Devil mix dry, 4000 psi, grout mix) This\nestimation is based on an average of 1500 lbs of stone per yard, 600 lbs of columbian sand per yard, and 1200\nlbs of Manf Sand per yard. (2000 lbs = 1 ton)\nPer Tom's estimation below an approx 390 yards of concrete will be batched which breaks down to:\n293 tons of stone (requested 400 tons)\n117 tons of Col (requested 500 tons)\n324 tons of MFs (requested 500 tons)\nNote: Material that is not batch which is taken by bucket or bakkero is used in motar mix for stone walls and\nconcrete walls, dry repair of roads (holes), Lanscaping\nMONIQUE HARRY\nProject Administrator\nLSJ, LLC\nTelephone\nFax\nDate: Wed, 22 Feb 2012 10:40:53 -0500\nSubject: Re: FW: Heavy Material\nFrom:\nTo:\nMonique...good day ... a rough estimate of yards of concrete per project.....remember there are approx 4000\nlbs of materials in a yard of concrete..\n1 grotto approx 35 yds to go\n2 flag pole road 75 yds\n3 heli road approx 40 yds\n4 triangle approx 60 yds\n5 sundial 10 yds to go\n6 Five palms 65 approx 65 yds\n7 duck bank @ five palms 80 yards + 3 truck loads of MFS sand for underground work\n8 misc pours approx 25 yds...\nEFTA00930483\n", "char_count": 1293}, {"efta_number": "EFTA00930482", "page_number": 2, "text_content": "that's all i have on the schedule for concrete placement at this time..\nOn Wed, Feb 22, 2012 at 10:01 AM, Monique Harry\nwrote:\nI need your help. Rich wants an estimate of how many tons will go to each one of the projects below. 500\ntons of columbian 500 tons of MFs and 400 tons of # 57 stone.\nMONIQUE HARRY\nProject Administrator\nLSJ, LLC\nTelephone\nFax\nFrom:\nSubject: Re: Heavy Material\nDate: Wed, 22 Feb 2012 09:22:58 -0500\nTo:\nyou had asked for 500 tons of each component\ncan you please allocate estimate of use for each project\nthank you\nRichard Kahn\nHBRK Associates Inc.\n301 East 66th Street, Suite 10F\nNew York, NY 10065\ntel\nfax\ncell\nOn Feb 21, 2012, at 8:15 AM, Monique Harry wrote:\nCurrent Inventory:\nManufacturing Sand - 2 loads\nColumbian Sand - 1 load\nStone - 2 loads\nProjects Concrete will be used for:\n1. Five Palms - Side walks/terraces\n2. Grotto Steps\n3. Flagpole pool - Road\n4. Heli Pad-Road\n5. Triangle - Road\n6. Sundial - Slab\nMONIQUE HARRY\nEFTA00930484\n", "char_count": 970}, {"efta_number": "EFTA00930482", "page_number": 3, "text_content": "Project Administrator\nLSJ, LLC\nTelephone\nFax\nSubject: Fwd: Heavy Material\nFrom:\nDate: Fri, 17 Feb 2012 16:01:24 -0500\nCC:\nTo:\nCan you please provide me with inventory currently on hand in addition to specific details on what this will be used\nfor rather than misc island concrete\nthank you\nRichard Kahn\nHBRK Associates Inc.\n301 East 66th Street, Suite 10F\nNew York, NY 10065\ntel\nfax\ncell\nFrom: Monique Harry\nDate: February 14, 2012 12:04:34 PM EST\nTo: Rich Kahn\nSubject: Heavy Material\nGood Day Rich,\nAttached for your approval 3 LSJ purchase request for Heavy Material\n1. Manufacturing Sand 500 tons = $26,120.00\n2. Columbian Sand 500 tons = $40,400.00\n3. #57 Stone 500 tons = $18,360.00\nTotal = $84,880.00 (includes cost of Trucking)\nDue to my absence on Friday and Monday, currently 3 loads of stone and 3 loads of Manf. Sand is being pick up\nat Heavy Material without following the proper protocol. Estimated cost is $6,200.00 so, I'm hereby requesting\n$6,500.00 to be place on our account to cover the cost.\nMONIQUE HARRY\nProject Administrator\nLSJ, LLC\nEFTA00930485\n", "char_count": 1071}, {"efta_number": "EFTA00930482", "page_number": 4, "text_content": "Telephone\nFax\nBrice Gordon\nLittle Saint James\nUSVI\nPhone: 340 513 9855\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA00930486\n", "char_count": 682}]}