{"efta_number": "EFTA00922416", "page_count": 2, "url": "https://epstein-data.com/EFTA00922416", "pdf_url": "https://epstein-data.com/pdf/EFTA00922416.pdf", "pages": [{"efta_number": "EFTA00922416", "page_number": 0, "text_content": "From: Jeffrey Epstein <jeevacationggmail.com> \nTo: Sarah K\nSubject: \nDate: Fri. 14 Oct 2011 14:31:20 +0000 \n1. Courtyard \n2. Grading main engineering road \n3. Finish Main pool shelter \n4. Tennis court and other main lights \n5. Cabana 4 \n6. Gym cabinet — vendor coming back on 10/13 for additional measurements \n7. Cabana 4 furnishing \n8. Flagpole bath and cabana \n9. Main pool bath \n10. Palm trees \n11. Sod \n12. Tiling \n13. Main planter \n14. Brice cottage \n15. Dock house \n16. Electrify info center \n17. Five Palms \n18. Grotto \n19. Blue beach landscaping \n20. Hell wall \n21. Curb for all roads \n22. Night lights to motor court - on order \n23. Steps to library \n24. Library path \n25. Benches \n26. Driveway entry \n27. Pool ladders \n28. Flagpole lights are too hot \n29. Flagpole grading \n30. Flagpole wall banks \n31. Stereo — Technomad speakers arrived in Palm Beach 10/11, Janusz will take to Tropical tomorrow, to sail \n10/14 \n32. Computer \n33. Molyneux desk \n34. Jet skis \n35. Midnight Express— no offers to date (10/11), JE to approve shipping to STT \n36. Library landscaping \n37. Pool palms \n38. Color in basket \n39. Waterfall \n40. Banquette \n— per Brice, shipment on STT 10/11, clearing agent is awaiting a corrected Bill of Lading \nEFTA00922416\n", "char_count": 1249}, {"efta_number": "EFTA00922416", "page_number": 1, "text_content": "41. Big wind doors \n42. High Flagpole road \n43. Main pool shelter (please see #3) \n44. St. John terrace \n45. Hangar — painting continues, floor scheduled for next week, arranging shipping of refurbished ISO tank-tarry \nwill have details later this week \n46. Motor court \n47. Archer platform \n48. Bed \n49. Plants bought from Italian woman \n50. Path from Flagpole pool to info center \n51. Steel shed for the new workshop area — contractor postponed meeting \n52. Helicopter like lights for top of the columns — per Karen, on order, expected within 10 days \n53. night lighting bench stairs path to library \n54. triangle \n55. dock house tree lights \n56. kitcehn statue, light brought out. \n57/ solar fridge light fan pebble beach \n58 humidifiers \n59 bottle palms and red thorns replace \n60 tree layout \n6lmosiac light. \nOther item: \nPainted Library wall \nThe information contained in this communication is \nconfidential, may be attorney-client privileged, may \nconstitute inside information, and is intended only for \nthe use of the addressee. It is the property of \nJeffrey Epstein \nUnauthorized use, disclosure or copying of this \ncommunication or any part thereof is strictly prohibited \nand may be unlawful. If you have received this \ncommunication in error, please notify us immediately by \nreturn e-mail or by e-mail to jeevacation@gmail.com, and \ndestroy this communication and all copies thereof, \nincluding all attachments. copyright -all rights reserved \nEFTA00922417\n", "char_count": 1473}]}