{"efta_number": "EFTA00906751", "page_count": 2, "url": "https://epstein-data.com/EFTA00906751", "pdf_url": "https://epstein-data.com/pdf/EFTA00906751.pdf", "pages": [{"efta_number": "EFTA00906751", "page_number": 0, "text_content": "From: Jeffrey Epstein <jeevacation@gmail.com>\nTo:\nSubject: Fwd:\nDate: Fri, 18 Mar 2011 15:49:06 +0000\nForwarded message\nFrom: ion nicola\nDate: Fri, Mar 18, 2011 at 8:46 AM\nSubject: RE:\nTo: Jeffrey Epstein <jeevacation@gmail.com>\n>, Brice Gordon <\nhi jeffrey,\n..i've just remembered about the lighting in the library..on the island. probably you saw many pictures of the\nceiling(sky with clouds) but its hard to notice the differences of the light on different sides of the ceiling. in fact\nwhen you get inside thru the door, the front side has very strong and cold light and the left side too. the right side\nand the the side with the doors are darker. probably they put different bulbs(tubes) and some are not working\ntoo.\nso if the sky looks too light in some parts is because the lightning. you can turn off the light see the real color\nwhich is kind if dark..but i did it that way because i of the lightning.\nanyway, i think the ceiling looks nice.\nthen in the other rooms were more things i couldnt finish because they told me in the last day.\nwith a few days before i left, brice came to me and asked me how many more days i need to finish everything\nbecause he wanted to buy my airplane ticket,.. he said i have to finish | office(the doors and window) and\nthe vestibule doors and thats it. so i told him i need like two three days for that. but then in the last day\ncame and she told me i have to fix the wall in the bathroom in cabana no2 because they moved the rack is on top\nof the toillete. then another guy came in the morning telling me that i have to mach the frame of two mirrors he\nbuilt for the master bathroom, then the electrician came with more switcher plates for office and he told\nme that i have to match those like the wall.., besides that i scheduled to do those two doors in the vestibule in\nlast day, but then when i got there in the morning one door was not finished..then someone came and started\npatching and sanding the door, and then primering..and then painting... so thats why i couldnt finish both doors.\nanyway, i told when she told me about fixing the bathroom wall in cabana no 2, that i need maybe one or\ntwo days to finish everything, so i told her to cancel my flight..but then she called and they decided that i\nprobably have to come back for more touch ups..because now all the cabanas,1,2,3 are full with a lot of\nfurniture.. so probably when they are going to move the furniture again..will going to damage the walls.\nbut untill they are going to move the furniture..and while i am in new york, do you want me to start something\nat the house on 71st st or take a brake for a while?\nwhat do you think?\nthank you.\nion\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nEFTA00906751\n", "char_count": 2835}, {"efta_number": "EFTA00906751", "page_number": 1, "text_content": "the use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA00906752\n", "char_count": 451}]}