{"efta_number": "EFTA00902178", "page_count": 1, "url": "https://epstein-data.com/EFTA00902178", "pdf_url": "https://epstein-data.com/pdf/EFTA00902178.pdf", "pages": [{"efta_number": "EFTA00902178", "page_number": 0, "text_content": "From: ion nicola\nTo: Jeffrey Epstein <jeevacation@gmail.com>\nSubject: RE:\nDate: Sun, 09 Jan 2011 00:49:57 +0000\nImportance\nNormal\nhi jeffrey,\nsorry for bothering with e-mails..\nso we finished venetian plaster in master bedroom and the vestibule only. now the vestibule needs the design in top, but\nyou are not sure yet about the sample. anyway i will finish that sample monday in the morning then you can decide and i\ncan start the design in the vestibule.\nbeside this i have to do cabana no3 (close to the pool) with those vertical lines.. and the bathroom with diamonds (brown\nbags color), and then there are two small rooms in the master bedroom in the between vestibule and the master\nbathroom, they need white venetian plaster.\nnow, for the cabana no3, and the vestibule, i dont need help..if i keep my friend here i dont know what to give him to\ndo.. otherwise i would have asked you for the begening that i need help. when i have to compose things like lets say\nthose small blue cross lines like the sample i do for the vestibule in master bedroom, or even the verticals lines i have to\ndo in cabana no3, or even the dimonds in its bathroom, i like to work alone..otherwise i get distracted..i cannot\nconcentrate\nthe only thing my friend can do is the venetian plaster in those small rooms in the master bedroom, and that would take\none week for one person to do them or 2-3 days if two persons work, but we cannot do the venetian plaster in there\nbecause they are not ready for us. when i left before christmas garry told me they going to be ready at the begining of\njanuary, thats why i sgheduled my friend for one or two weeks of work.\nbut then when we got here at the begening of this week and i i saw that those two small rooms are not ready, i've i\nasked garry when are they finish the floor and instaling the counter top and the sink, and he said is going to take one\nweek to finish the floor and sanding and then they ordered the counter top and they will get it after after a week or\ntwo..so he said they will be done in two weeks.\nif i do venetian plaster before they finish instaling the counter top, basebords etc, and sending the floor, then they will\ndamage the walls. when you sand the floor it makes a brown-redish dust and gets stuck on the walls and you cannot\nremove that..you have to redo all the walls.\nanyway, after this talking to garry, i had to tell my friend that there is only one week of work, so he will go back\nsaturday or sunday. after that he sheduled a job in new york for the next week, so now he has to be in new york monday\nmorning. he works usually at the guggenheim museum as a freelancer, its his main job.\nsorry for this, and please let my friend to go back to new york tomorrow.\nthank you,\nion\nEFTA00902178\n", "char_count": 2755}]}