{"efta_number": "EFTA00901929", "page_count": 1, "url": "https://epstein-data.com/EFTA00901929", "pdf_url": "https://epstein-data.com/pdf/EFTA00901929.pdf", "pages": [{"efta_number": "EFTA00901929", "page_number": 0, "text_content": "From: \"Gary Kerney\"\nTo: \"Jeffrey Epstein\" <jeevacation@gmail.com>\nCe: \"William Rowles\" <\nSubject: Schedule\nDate: Thu, 13 Jan 2011 21:09:03 +0000\nCONSTRUCTION Schedule Status Jan. 13th\nKitchen\ninside ready by Feb.5\nExceptions\nbanquette\ndrawers\noutside\nExceptions\nwall sconces on columns\nhandrails in progress\nexterior painting being finished up\nMaster suite\nbedroom ready for furniture by Jan.21\nBath ready for Feb.5\nExceptions\ntemp tops and sinks on vanities\nglass walls\npair of arched doors should be delivered about the 5th\nthe outside tub will take til the 10th\nthe stair walls will be very close to done\nbedroom road should start by the 5th\nlittle office floors,material will arrive week of the 20th.will try to get in by the 5th pending labor to get it down\nMechinical buildings will be in operation April 7\nExceptions\ndecomminisioning of old plant area\nsite work as part of the new and old complex\nwork assioated with the roof function\nready for decorative painting\nEFTA00901929\n", "char_count": 985}]}