{"efta_number": "EFTA00901536", "page_count": 1, "url": "https://epstein-data.com/EFTA00901536", "pdf_url": "https://epstein-data.com/pdf/EFTA00901536.pdf", "pages": [{"efta_number": "EFTA00901536", "page_number": 0, "text_content": "From: Richard Barnett\nTo: jeffrey Epstein <jeevacation@gmail.com>\nSubject: RE: up date\nDate: Sat, 15 Jan 2011 21:50:24 +0000\nImportance\nNormal\nHi Mr.Epstein the house cleaning and organization of all closet areas are going as planed all electronic rubbish was picked\nup except for some cpu's that Scott wants to clean up. The server room will be the next on the list when Scott integrates\nthe server to apple. The ladies have been going floor to floor cleaning every inch of the house all closets included. We left\nall storage items laid out in the catering kitchen area on C-level for you to view, to decide what is garbage, or what can\nbe sold and what can be used in other homes. I am also putting a list together with pictures of all all other items that Sara\nhas requester to be shipped to LSJ . I would like to have all shipping items picked up this coming week of 1/17/11 if\npossible, I have called Emad and we will get pricing for shipping when we have a complete list that you approve .I have\nalso been working on a hot water heating problem that I discovered when the colder weather came in last week. The\nheating system upper re heat Zones being supplied by AC-3 fan & the 5th floor fan units heating was loosing water\npressure effecting room temperatures on the 4th & 5th floors. After various trouble shooting tests I found the shell & tube\nHeat exchanger #2 has a tube leak and the re heat hot water was leaking out water pressure through the steam\ncondensate line. This was causing the Re heat hot water system pressure to drop and the re heat coils to get air bound\non the 5th & 6th floors. I have isolated heat exchanger #2 until the tube bundle can be replaced, we are operating off of\nHeat exchanger #1 with an extra steam bypass supply to make up the differencein capacity all rooms are now making set\npoints. I replaced Heat exchanger #1 tube bundle about 2 years ago, #2 tube bundle which is leaking is original to the\nhouse.The Source One project is also moving forward the full energy report and recommendations for system up\ngrades will be complete by 1/25/11 i am also waiting on Pricing for up grades that AD Winston is working on for free\ncooling & removal of the old Carrier Chiller and adding the additional 25 tons of compressors to the new Air stack Chiller. I\nam also in the process of setting up meetings with Rich Kahn and the various mechanical maintenance contractors. See\nyou soon Richard.\nDate: Sat, 15 Jan 2011 09:05:09 -0400\nSubject:\nFrom: jeevacation@gmail.com\nTo:\nhow s our project coming.\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA00901536\n", "char_count": 3144}]}