{"efta_number": "EFTA00849520", "page_count": 7, "url": "https://epstein-data.com/EFTA00849520", "pdf_url": "https://epstein-data.com/pdf/EFTA00849520.pdf", "pages": [{"efta_number": "EFTA00849520", "page_number": 0, "text_content": "From: \"jeffrey E.\" <jeevacation@gmail.com>\nTo: LAllenby\nSubject: Re: LSJ Plate Work\nDate: Mon, 03 Aug 2015 13:39:26+0000\nis that what you are reccomending?\nOn Mon, Aug 3, 2015 at 9:38 AM, LAllenby\nwrote:\nGood Morning Anna-\nUpon reviewing and inspecting the inside of the compartments, forward of the engine room, we have\ncome up with a quotation\nfor repairing all the \"wasted\" plate. Approximately 160 square feet of plate has to be cut out and\nreplaced. The square footage equals\n848LBS x $45 per pound the total would be $38,160 (This price includes all labor and material). We\nwill also have to remove both keel\ncoolers due to their location with the plate that has to be cut out. We will also have to fabricate two\nnew boxes in which they sit and\nthen remount these boxes once the new plate is welded into place. The price for this is $5850 includes\nlabor and material. Two water\ntight bulkheads are also compromised and several areas will need to be \"cropped\" out and replaced.\nLabor and materials is $3380.\nWe will also \"plug weld\" 12 more additional areas that have deteriorated and need to be addressed.\nThese two compartments have\nbeen inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge\npump system needs to be renewed\nand it is our recommendation to have Bosco undertake this job. Please note that we have not charged\nany additional lay days and\nwill continue not to. The areas that need to be cut out and replaced are very confined and difficult to\nwork in. With the savings on lay\ndays it is over $3500 so we will not be able to move on our final quotation. I have also attached a few\npictures.....\nTotal for labor and material\n..$47,390\nLeighton Allenby\nDirector of Properties\nOn Aug 3, 2015, at 9:21 AM, jeffrey E. <jeevacation@gmail.com> wrote:\nthat is only the problem,, is there a proposal for solution, ? please try to add action steps to issues, telling\nme only that there is a problem is time consumig\nEFTA00849520\n", "char_count": 1976}, {"efta_number": "EFTA00849520", "page_number": 1, "text_content": "On Mon, Aug 3, 2015 at 9:13 AM, LAllenby\nThe hull is compromised - rusted through in areas on his map.\nLeighton Allenby\nDirector of Properties\nOn Aug 3, 2015, at 9:09 AM, Richard Kahn\nwrote:\nwrote:\nBosco email off point. Disappointed with bosco on every step of this barge overhaul and concerned he is\nnot best person to care for and operate moving forward. To many surprises and then an excuse and\ndisclaimer each time. As I am sure you will say we have no choice I wanted to confirm we shall proceed\nwith latest Change order for 47,390\nPlease advise\nThank you\nSent from my iPhone\nBegin forwarded message:\nFrom: Leighton Allenby\nDate: July 31, 2015 at 3:49:39 PM EDT\nTo: Richard Kahn <\nSubject: Fwd: LSJ Plate Work\nFYI\nLeighton Allenby\nDirector of Properties\n--- Forwarded message\nFrom: Bill Hague\nDate: Fri, Jul 31, 2015 at 3:09 PM\nSubject: RE: LSJ Plate Work\nTo:\nUnderstood.\nGabe, one of his hands and I went over all the remaining cavities/compartments and found only a half\ndozen minor and repairable spots in the hull plating. The bulkheads show staggered severe pits/holes\nthat also can be dealt with reasonably.\nI agree about the surveyor.\nAlso, your email ended up in my junk mail. I have added you to my contacts to avoid that in the future.\nI regret the delay in responding.\nEFTA00849521\n", "char_count": 1299}, {"efta_number": "EFTA00849520", "page_number": 2, "text_content": "For your information, I contacted a Navy colleague and asked for the present contractors information\nconcerning construction of the latest Navy LCM8's\nI did this to quantify your question about replacement costs of the Barge. I was Refered to Kvichak\nMarine in Seattle. Art Parker there said my guess of 2 million is likely low. A build that heavy is likely\na 3 to 4 million dollar job in his opinion. His company is bidding on the Caiman design 60 and 70 for\nthe USN.\nGood Day\nBoscoe\nFrom:\nDate: Fri, 31 Jul 2015 12:22:37 -0400\nSubject: Re: LSJ Plate Work\nTo: jeevacation@gmail.com;\nCC:\nHello Anna and Boscoe,\nCan you please go over every inch of Big D and determine when the bleeding to Mr. Epstein is going to\nstop.\nI know I am coming in late in the last quarter but there should have been a survey recommended so this\nadditional work outside of the original budget did't occur and a 10 to 15% mic added for unforeseen. I see\nno other option but to\nrecommend to Mr. Epstein and Richard that this\nwork be completed. Please thank Gabriel for the savings on the lay days\nMr. Epstein and Richard,\nI this additional $47,390 expenditure approved?\nBest,\nLeighton\nGood Morning Anna-\nUpon reviewing and inspecting the inside of the compartments, forward of the engine room, we have\ncome up with a quotation\nfor repairing all the \"wasted\" plate. Approximately 160 square feet of plate has to be cut out and replaced.\nThe square footage equals\n848LBS x $45 per pound the total would be $38,160 (This price includes all labor and material). We will\nalso have to remove both keel\ncoolers due to their location with the plate that has to be cut out. We will also have to fabricate two new\nboxes in which they sit and\nthen remount these boxes once the new plate is welded into place. The price for this is $5850 includes\nlabor and material. Two water\ntight bulkheads are also compromised and several areas will need to be \"cropped\" out and replaced.\nLabor and materials is $3380.\nWe will also \"plug weld\" 12 more additional areas that have deteriorated and need to be addressed.\nThese two compartments have\nbeen inspected by both Gabriel, the project manager, and Bosco. In addition, the emergency bilge pump\nsystem needs to be renewed\nand it is our recommendation to have Bosco undertake this job. Please note that we have not charged\nany additional lay days and\nwill continue not to. The areas that need to be cut out and replaced are very confined and difficult to work\nin. With the savings on lay\ndays it is over $3500 so we will not be able to move on our final quotation. I have also attached a few\npictures.....\nTotal for labor and material....\n.$47,390\nEFTA00849522\n", "char_count": 2662}, {"efta_number": "EFTA00849520", "page_number": 3, "text_content": "Leighton Allenby\nDirector of Properties\nOn Fri, Jul 31, 2015 at 11:43 AM, Ann Rodriquez\nAnn R.\nBegin forwarded message:\nFrom: gene kral ◄\nDate: July 31, 2015 at 11:19:19 AM AST\nTo: Ann Rodriquez <\nSubject: Fw: LSJ Plate Work\nReply-To: gene kral\n> wrote:\nGood Morning Anna-\nUpon reviewing and inspecting the inside of the compartments, forward of the engine room, we have\ncome up with a quotation for repairing all the \"wasted\" plate. Approximately 160 square feet of plate\nhas to be cut out and replaced. The square footage equals 848LBS x $45 per pound the total would be\n$38,160 (This price includes all labor and material). We will also have to remove both keel coolers due\nto their location with the plate that has to be cut out. We will also have to fabricate two new boxes in\nwhich they sit and then remount these boxes once the new plate is welded into place. The price for this\nis $5850 includes labor and material. Two water tight bulkheads are also compromised and several\nareas will need to be \"cropped\" out and replaced. Labor and materials is $3380. We will also \"plug\nweld\" 12 more additional areas that have deteriorated and need to be addressed. These two\ncompartments have been inspected by both Gabriel, the project manager, and Bosco. In addition,\nthe emergency bilge pump system needs to be renewed and it is our recommendation to have Bosco\nundertake this job. Please note that we have not charged any additional lay days and will continue not\nto. The areas that need to be cut out and replaced are very confined and difficult to work in. With the\nsavings on lay days it is over $3500 so we will not be able to move on our final quotation. I have also\nattached a few pictures.....\nTotal for labor and material..\n..$47,390\n<resized2.jpg>\nEFTA00849523\n", "char_count": 1771}, {"efta_number": "EFTA00849520", "page_number": 4, "text_content": "<resized5.jpg>\n<resized7.jpg><resized8.jpg>\n<resized10.jpg>\n<resized12.jpg>\nEFTA00849524\n", "char_count": 89}, {"efta_number": "EFTA00849520", "page_number": 5, "text_content": "<resized8.jpg>\n<resized2.jpg>\n<resized5.jpg>\n<resized7.jpg>\n<resized12.jpg>\n<resized10.jpg>\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nEFTA00849525\n", "char_count": 221}, {"efta_number": "EFTA00849520", "page_number": 6, "text_content": "constitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nplease note\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJEE\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments. copyright -all rights reserved\nEFTA00849526\n", "char_count": 1093}]}