{"efta_number": "EFTA00846509", "page_count": 2, "url": "https://epstein-data.com/EFTA00846509", "pdf_url": "https://epstein-data.com/pdf/EFTA00846509.pdf", "pages": [{"efta_number": "EFTA00846509", "page_number": 0, "text_content": "From: Daphne Wallace\nTo: Jeffrey Epstein <jeevacation@gmail.com>\nCc: ann rodriquez\nSubject: Photos - September 11, 2015\nDate: Fri, 11 Sep 2015 22:24:44 +0000\n>, Rich Kahn\nAttachments: LSJ Punchlist_9-11-15.xls; MBR_flooring_(1).JPG; MBR_flooring_(2).JPG;\nMBR_flooring (3).JPG; MBR_flooring_(4).JPG; MBR_flooring_(5).JPG;\nMBR_flooring (6).JPG; MBR_flooring_(7).JPG; Pebble_Beach_(1).JPG;\nPebble Beach_(2).JPG; Pebble_Beach_(3).JPG; Pebble_Beach_(4).JPG;\nPebble Beach (5).JPG; Pebble_Beach_(6).JPG; Pebble Beach_(7).JPG;\nPebble Beach (8).JPG; Pebble Beach (9).JPG; Pebble Beach_(10).JPG;\nPebble Beach (11).JPG; Pebble_Beach (12).JPG;\n(1).JPG;\n(2).JPG;\n(3).JPG;\n(4).JPG;\n(5).JPG;\n(6).JPG;\n(7).JPG; Waterfall_cistern.JPG; Gym_A-\nC_shed (1).JPG; Gym_A-C_shed_(2).JPG; Gym_A-C_shed_(3).JPG; Gym_A-\nC_shed (4).JPG; Dining_Terrace_ceiling_fans_changed.JPG; Fuel_Depots_(1).JPG;\nFuel Depots_(2).JPG; Fuel_Depots_(3).JPG; Fuel_Depots_(4).JPG; Fuel_Depots_(5).JPG;\nFuel Depots (6).JPG; Fuel_Depots_(7).JPG; Fuel_Depots_(8).JPG; Fuel_Depots_(9).JPG;\nFuel Depots (10).JPG; Fuel_Depots (11).JPG; Fuel_Depots_(12).JPG;\nFuel Depots (13).JPG; Fuel_Depots (14).JPG; Fuel_Depots_(15).JPG;\nKitchen island_cabinetry_(1).JPG; Kitchen_island_cabinetry_(2).JPG;\nKitchen_island_cabinetry (3).JPG; Kitchen_island_cabinetry_(4).JPG;\nKitchen island_cabinetry_(5).JPG\nGreetings Sir,\nSeptember 11 photos for your review and comments:\nMBR flooring - sanding #3 completed and epoxy applied - Pokey on site 9/13 for sanding #4\nPebble Beach - clean up continues - Danny received your directive for a smooth finish - he is to calculate the\namount of yards of concrete needed and get a quote from Heavy Materials and the pump truck company - Danny\nsays the pump trucks should be able to get all the way down to the beach\nStone wall along road to Info Center - in progress\nWaterfall cistern - slab poured today - block laying on 9/14\nGym A/C shed - painting completed\nDining Terrace ceiling fans changed out from the rusty ones\nFuel Depots - RanVar came out to calibrate the fuel depots and uncovered severe rusting and 4 leaks - 3 in the\ndiesel and 1 in the premium gas depot - they will make repairs, but are strongly recommending both depots be\nchanged within the year - they are preparing the quote for the replacement in the meanwhile they will complete\nthe repairs and cleaning needed for continued function and the upcoming Terminal Facility License inspection\nEFTA00846509\n", "char_count": 2444}, {"efta_number": "EFTA00846509", "page_number": 1, "text_content": "Kitchen cabinetry in island - repairs being done on the cabinets in the island\nAttached also for your review and comments is the Punch List updated 9/11/15.\nRespectfully submitted, Daphne and Anna\nEFTA00846510\n", "char_count": 210}]}