{"efta_number": "EFTA00833508", "page_count": 2, "url": "https://epstein-data.com/EFTA00833508", "pdf_url": "https://epstein-data.com/pdf/EFTA00833508.pdf", "pages": [{"efta_number": "EFTA00833508", "page_number": 0, "text_content": "From: Richard Kahn\nTo: \"jeffrey E.\" <jeevacation@gmail.com>\nSubject: Fwd: El Brillo Way Sea Wall Bids\nDate: Tue, 23 Feb 2016 23:22:04 +0000\nAttachments: CCI23022016_2(2).pdf; seawall_repairs_El_Brillo_palm_beach.doc; Epstein_seawall.pdf\nattached are both bids:\noriginal from Dan 29,800 and new bid from Brian 64,915\nbelow Brian explains the differences between both bids\nplease advise\nthank you\nRichard Kahn\nHBRK Associates Inc.\n575 Lexington Avenue 4th Floor\nNew York, NY 10022\ntel\nfax\ncel\nBegin forwarded message:\nFrom: Brian Arrandale <arrandaleb@bellsouth.net>\nSubject: El Brillo Way Sea Wall Bids\nDate: February 23, 2016 at 4:47:07 PM EST\nTo: Richard Kahn\nRich,\nI looked at both bids closely. I did a quick sketch to help (I hope) visualize whats going on with the sea wall\nand what both Contractors are proposing.\nThe First part of both bids are relatively the same. Remove old sheet piling, pound new sheet piling into the\nlake floor a few inches out from the old concrete and pour new concrete. This is meant to help hold back the\nbase of existing sea wall.\nThis step will help hold and buy some time, and I would say that both contractors would be in the $30,000.00\nrange to complete this job.\nStep 2. This is where Pilings Plus would drill 29 manta rays approximately every 5 foot along the sea wall on\nan angle down to further reinforce the sea wall. I've enclosed a youtube video link, so you can understand what\na manta ray is and does.\nStep 3. Drill 18 weep holes approximately every 8 foot along the sea wall with well points to allow water to\ndrain out but not the soil.\nAs the tide rises the water from the lake actually flows behind the sea wall and the water in the ground\nwill rise with the tides. When the tide goes out the water is trapped behind the sea wall causing hydrostatic\npressure trying to get out. The weep holes allow it to go out reducing hydrostatic pressure.\nEFTA00833508\n", "char_count": 1908}, {"efta_number": "EFTA00833508", "page_number": 1, "text_content": "Conclusion: Labontes bid or just installing the new sheet piling and concrete is a one step approach for repair.\nPilings Plus has a multi or 3 step approach for repair that addresses 3 separate issues, and of\ncourse is more costly but likely a more permanent repair.\nI hope this helps\nThanks,\nBrian\nhttps://youtu.be/Rtq-YFgUQ60\nFrom: David Newmark\nDate: February 23, 2016 at 9:57:35 AM EST\nTo: \"arrandaleb@bellsouth.net\" <arrandaleb@bellsouth.net>\nSubject: El Brillo sea wall repair\nReply-To: David Newmark <|\nAttached is our proposal to repair the seawall at El Brillo. Much of this work have to be done under the existing dock.\nIf you have any questions, do not hesitate to call.\nEric Newmark, David Newmark\nPilings Plus, Inc.\n4856 Bocaire Blvd\nBoca Raton Florida 33487\nE-mail:\nWebsite:\nEFTA00833509\n", "char_count": 802}]}