{"efta_number": "EFTA00802602", "page_count": 121, "url": "https://epstein-data.com/EFTA00802602", "pdf_url": "https://epstein-data.com/pdf/EFTA00802602.pdf", "pages": [{"efta_number": "EFTA00802602", "page_number": 0, "text_content": "APPLICATION FORMS AND ENVIRONMENTAL ASSESSMENT \nFOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE LANDING \nON GREAT ST. JAMES ISLAND \nU.S. VIRGIN ISLANDS \nPREPARED FOR \nGREAT ST. JIM, LLC. \nPREPARED BY \nBIOIMPACT, INC. \nM. BOX 132 \nKINGSHILL, ST. CROIX \nU.S. VIRGIN ISLANDS 00851 \nbioimpact@islands.vi \nJANUARY 2017 \nEFTA00802602\n", "char_count": 326}, {"efta_number": "EFTA00802602", "page_number": 1, "text_content": "Dawn L. Henry Commissioner \nDepartment of Planning and Natural Resources \nCyril E. King Airport Terminal, Second Floor \nSt. Thomas, Virgin Islands 00802 \nRe: Major Water Permit Application for the Construction of a Temporary Barge \nLanding, an Access Dock, and a Combination Dock and Barge Landing \nDear Commissioner Henry, \nGreat St. Jim, LLC wishes to make application to the Virgin Islands Government and the Secretary \nto the Army for a Coastal Zone Permit to construct two docks, one of which is a combination dock \nand barge landing and a temporary barge landing to provide access to Great St. James Island. \nA temporary barge landing is being proposed on the northwestern facing beach. This site is to the \nwest of the sand pond and the associated wetlands. This a shoreline ramp which is 25'wide and 40' \nin length extends to the Mean Water Line (MWL). Two bollards will be placed to either side of the \nramp and two moorings will be installed 75' offshore on either side of the ramp in just over 7' of \nwater depth. The moorings will be installed using helix anchors and will use floating lines as to not \ndisturb the seafloor when not in use. The landing is free of both coral and seagrass colonization, \nthis landing can be quickly constructed and utilized while the combination dock and barge landing \non the southeastern side of the island is constructed. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there was a \ndock in this location and there are still old concrete piles lying in the shallow water. The proposed \ndock will be 10' in width and 195' in length extending 187' from MLW and 193' from mean high \nwater (MHW). The dock will connect to an access slab 12' in length and 2' thick. All the ESA listed \ncoral species within the area were located and the dock footprint avoids all ESA listed species. The \ndock extends beyond the nearshore hardbottom to a depth of 15' out in the uncolonized sand to \nallow for safe dockage for deeper vessels\n... [truncated, 3128 chars — for the full page use /api/corpus/document/EFTA00802602/1 or ?id=EFTA00802602&page=1]", "char_count": 3128}, {"efta_number": "EFTA00802602", "page_number": 2, "text_content": "We also respectfully request that this application be forwarded to the U.S. Army Corps of Engineers \nAntilles District, Annex Building, Fundacion Angel Ramos, 2nd Floor, Suite 202, Franklin Delano \nRoosevelt Ave. #383, San Juan, PR 00918 for their review and approval. \nEarly advice concerning your decision in this matter will be appreciated. \nVery truly yours, \nErika Kellerhals \nEFTA00802604\n", "char_count": 395}, {"efta_number": "EFTA00802602", "page_number": 3, "text_content": "GOVERMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDEVELOPMENT PERMIT APPLICATION \nFORM L&WD-2 \nPERMIT APPLICATION \nDate Received: \nDate Declared Complete:  \n \nPermit Application No. \nApplication is hereby made for an ElEarth Change ElCoastal Zone Permit \nI. Name, mailing address, email address and telephone number of Applicant (person/entity with legal \ninterest in the property, to which permit will be issued) \nawn Ea Jim LW \n9053 Estate St. Thomas, Sues 101 \nst. Thomas, VI 00802 \n340 779.2584 \n2. Name, title, mailing address and telephone number of Owner of property and Agent (if any) \nOwner of Property(s) \nAMR \nGreat St Jim, LLC \nErika A. Kellerhals \n9053 Estate SL Thomas. Suite 101 \nIIIII••••••••••0410la Kit Sas tea et IIINalptide \nSt Thomas, VI 00002 \nSt Thomas. VI 00802 340 779 2584 \n3. Location of activity. Plot No. \"\"*\".\" —\"\"\"\"a \"\"as\"'\" \n PIN No.  icreeognoice a 109801010300 \nEstateGreat St. James \nIsland St Thomas \n4. Zoning District  \nI3/400\"\n31 tow Craft \n4.a State type of Land Uses as specified in the VI Zoning Law, which are applied for (e.g., restaurant, \nhotel, single-family dwelling, etc.) \nPrivate Doc* and Barge Ramp \n5. Name, mailing address, email and telephone number of project designer. \nJeffrey Bateman, PE. PLS. Bateman CM Spivey Company, PC, MSC Dosplva, LLC \n5001.12 cndndsrs Wharf \nChristiansed. StCrobc. VI 00820 \n340 778-7474 \n6. Summary of proposed activity. Include all incidental improvements such as utilities, roads, etc. (Use \nadditional sheets if necessary). \nA temporary barge landing is being proposed on the northwestern facing beach. This site Is to the west of the sand pond and \nthe associated wetlands. This shoreline ramp which Is 2SWlde and 40' in iength extends to the Mean Water Line (MWL). \nTwo bollards will be placed to either side of the ramp and two TOOlkl9S Will be installed 75 offshore on either side of the ramp \nContinued: \nEFTA00802605\n", "char_count": 1961}, {"efta_number": "EFTA00802602", "page_number": 4, "text_content": "FORM L&WD-2/PERMIT \nAPPLICATION \n7. Date activity is proposed to start go 'MA 'S  P ella\" in  \n ; be completed 5 moms \n8. Classification of minor or major permit. Check one: \nElMinor Permit Application \nEl Major Permit Application \nState below which criterion applies in making above check. \nSize of Project! Dock Sizes \n9. Application is hereby made for a permit to authorize the activities described herein. I agree to provide \nany additional information/data that may be necessary to provide reasonable assurance or evidence \nto show that the proposed project will comply with the applicable territorial water quality standards \nor other environmental protection standards both during construction and after the project is completed. \nI also agree provide entry to the project site for inspectors from the environmental protection agencies \nfor the purpose of making inspection regarding this application and that to the best of my knowledge \nand belief, that such information provided herein, is true, complete and accurate. I further certify that I \npossess the authority to undertake the proposed activities. \nSignature of Applicant or Agent (if not owner) \nDate \nSign \nPrint \nSign \nOwner(s) (Rquiredr---  \nDate \n) \nCriltk I fin J1) 4-4 \n \nn\nolgo-to f \nI to k tr./ \nPrint S St I,- tuatuaorfr- \nComa` \nSt. Try., u-t. \nSign \nPrint \nDate Inspected: \nFOR DEPARTMENT USE ONLY \nInspector Record \n0 Application Approved \n0 Application Disapproved \nInspector's Remarks: \nInspector \nDate \nCommissioner, Planning & Natural Resources \nDate \nEFTA00802606\n", "char_count": 1549}, {"efta_number": "EFTA00802602", "page_number": 5, "text_content": "7. Cont. \nin just over 7' of water depth. The mooring will be installed using helix anchors and will use \nfloating lines as to not disturb the seafloor when not in use. The landing is free of both coral and \nseagrass colonization, this landing can be quickly constructed and utilized while the combination \ndock and barge landing on the southeastern side of the island is constructed. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there was a \ndock in this location and there are still old concrete piles lying in the shallow water. The \nproposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from \nmean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick. \nAll the ESA listed coral species within the area were located and the dock footprint avoids all \nESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in \nthe uncolonized sand to allow for safe dockage for deeper vessels. \nThe southern dock is located off the point closest to Little St. James. Again, all the ESA corals \nwere located and the dock was designed to avoid these corals. The dock is \"L\" shaped and is 20' \nwide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from \nMHW, the \"L\" then turns east and extends 100' by 20'. A wave attenuating/reef creating system \nis proposed beneath the dock which will allow for more protected docking inside the dock when \nseas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8' \non the inside of the \"L\". The dock has been designed so that barges can approach and land on \nthe end of the dock while vessels can dock along the \"L\". \nThe existing dock in Shallow Bay which is not permitted by the USACE in its current \nconfiguration will be removed upon completion of a usable new dock. \nEFTA00802607\n", "char_count": 1914}, {"efta_number": "EFTA00802602", "page_number": 6, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDEVELOPMENT PERMIT APPLICATION \nFORM L&WD-3 \nZONING REQUIREMENTS TABLE \nThe following table shall be completed by the applicant with entries as appropriate for the zoning district in which the \nactivity is taking place. Not all the requirements will necessarily apply to a particular zone. Consult the Zoning Law for \nguidance. \nApplicants Name:  Great St. Jim, ILLC \n(Wera \ntalc lht \n \nDate:  %k1O \nLocation of Activity (Plot No.): \nEstate: Greg Si. James \n2. \n3. \n4. \nS. \nProposed use (residential etc.) Residential Access Docks/Barge Ramp \nAccessory use if any Residential Access Docks/Buge Run \nNumber of onsitc parking spaces: Existing ala \nProposed •• \nArca of lot: a \nacres \ncovered by proposed buildings \nfts \nArea covered by existing buildings dot \nft2' Area \n6. \nTotal area of disturbance (includes footprint of all buildings, structures and parking areas) Upland 1550 \nfts \n7. \nSetback of building from street property line: Required dot \nft. Proposed none \nft. \n8. \nSide yard setback: Required Na \nft. \nProposed \nft. \n9. \nRear yard setback: Required dot \nft. \nProposed \nft. \n10. \nHeight of building: RA \nft. \nStories dot \nII. \nLot width at street line (ft.) dot \n12. \nArea of usable open space: Ws \nft. \n% of lot \n13. \nPersons per acre ratio ^la \n14. \nFloor area ratio nit \nIS. \nNumber of onsite parking and loading spaces .1 \n16. \nBuilding setback (yards II, W-2 only) 46 \nZoning District: R-I \nFOR DEPARTMENT USE ONLY \nInspector: \n Date: \n Permit Application No. \nEFTA00802608\n", "char_count": 1592}, {"efta_number": "EFTA00802602", "page_number": 7, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES \nDEPARTMENT OF PLANNING AND NATURAL RESOURCES \nDEVELOPMENT PERMIT APPLICATION \nFORM L&WD-4 \nMAJOR PROJECT SUMMARY DATA \nSection I. Applicant \n1. \nName, address and telephone number of applicant. \nGnat St an. RC \n9053 Estate St. Thomas, Suite 101 \nSt. Thomas, VI 00802, 340 779-2564 \n2. \nName, address and telephone number of owner of Property and of developer. \nSame \nSection IL Summary of Proposed Development \n3. \nDescribe the proposed development \nA WIN( arY bred landing a bOirg pOpaW en ma nodlweadoin ikon* bath Inas sae is to me wed of Ma sand pond aid Ilw assOcistod wetland \nThis Morenoe ramp which is 25W de and 40' In length extends to the Mean Water Line (PAWL) Two bollards \nwill be placed to either side of the ramp and two moorings will be irtstalled 75' offshore on either side of the ramp \nin just over 7' of water depth. The mooring will be installed using helix anchors and will use floating (coot.) \nSection III. Description of Proposed Development \n4. \nName of development Great St. James Access Dock Temporary Barge Ramp and Dock/Barge Ramp \n5. \nPlot No. \n6. \nZoning District: R-1 Residential \n7. \nPWD Map No. D9-2925-184 and D9-7346-T004 \n8. \nProposed use (residential, etc. as listed in Zoning Law):  Private Dock/Barge Ramp \nfor Residential Property \n9. \nAccessory use if any Access Dock, Temporary Barge Ramp and Dock/Barge Ramp \nEFTA00802609\n", "char_count": 1423}, {"efta_number": "EFTA00802602", "page_number": 8, "text_content": "FORM L&WD-4 \nMAJOR PROJECT SUMMARY DATA \nla \nArea of Law (acreage) 80.7 Elan and 26.9 acres \nI I. \nArea covered by existing buildings (sq. It)  n/a\n12. \nArea covered by proposed buildings (sq. ft.) Na\n13. \nFloor area total n/a \n14. \nFloor area ratio (B-I, B-2 zones only) n/a\nIS. \nNumber of buildings n/a\n16. \nNumber of units total nth \nPerson \n17. \nSchedule of units: \nEfficienciesIlia \n x 1.5 Unit \n1 bedroom Ilia \n x 2 \n2 bedroom Na \n x 3 \n3 bedroom n/a \n x 4 \nOther \nTotal Persons \nPersons \nI8. \nNumber of on-site parking and loading spaces n/a\n19. \nMaximum building height (stories/ft) ^la\n20. \nAdjoining property land use(s) Private Island no Adjoining Properties \n21. \nSetback of building from street property line (ft.) Na\n22. \nSide yard setback (ft.) n/a\n23. \nRear yard setback (ft.) n/a\n24. \nDensity (perso&acre) n/a\n25. \nArea of usable open space (sq. ft. %of lot)  nia\nEFTA00802610\n", "char_count": 894}, {"efta_number": "EFTA00802602", "page_number": 9, "text_content": "FORM L&WD-4 \nMAJOR PROJECT SUMMARY DATA \nSection IV. Comments \n26. \nProposed Potable Water Supply (method & quality estimate gal/day) \nNo Potable Water Proposed \n27. \nProposed Sewage Treatment (method & quality estimate gal/day) \nNo sewage treatment proposed \n28. \nProposed Solid Waste Disposal (method & quality estimate lbs/day) \nNo solid waste should be created. Any trash brought off vessels will be disposed of in existing trash receptacles on Island \n29. \nProposed Electrical Supply (method & demand estimate KWH for single & 3 phase) \nSolar fights will be utilized on the docks \n30. \nAir Conditioning (method & demand estimate down \nNo air conditioning is proposed. \n31. \nOther Utilities  \n32. \nOther \nSection V. \n33. \nWill the development extend onto or adjoin any beach tidelands, submerged lands or public trust lands? \n1 no apple:Won is be 2 docks arel a Unwary baps_ —p MI in an beech 112 \ne \nvibe Irto subrined l.S \n34. \nWill the development maintain, enhance or conflict with public access to the shoreline and along the coast? \nThe docks will not conflict with public access to or along the shoreline \n35. \nWill the development protect or provide moderate income housing opportunities? \nWill it displace moderate income housing? \nIns prOjeC la NW no India Ca m00110)IrCOme rowing Cipaltran. \n36. \nHow will the development affect traffic on the coastal access roads? \nThe won is on a prate island and ye not ad maul mass me \nDate \nEFTA00802611\n", "char_count": 1458}, {"efta_number": "EFTA00802602", "page_number": 10, "text_content": "3. Cont. \nlines as to not disturb the seafloor when not in use. The landing is free of both coral and seagrass \ncolonization, this landing can be quickly constructed and utilized while the combination dock and \nbarge landing on the southeastern side of the island is constructed. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there was a \ndock in this location and there are still old concrete piles lying in the shallow water. The \nproposed dock will be 10' in width and 195' in length extending 187' from MLW and 193' from \nmean high water (MHW). The dock will connect to an access slab 12' in length and 2' thick. \nAll the ESA listed coral species within the area were located and the dock footprint avoids all \nESA listed species. The dock extends beyond the nearshore hardbottom to a depth of 15' out in \nthe uncolonized sand to allow for safe dockage for deeper vessels. \nThe southern dock is located off the point closest to Little St. James. Again, all the ESA corals \nwere located and the dock was designed to avoid these corals. The dock is \"L\" shaped and is 20' \nwide (to allow for barge landing) and 150' in length extending 141' from MLW and 148' from \nMHW, the \"L\" then turns east and extends 100' by 20'. A wave attenuating/reef creating system \nis proposed beneath the dock which will allow for more protected docking inside the dock when \nseas from the south are rough. The dock has 9' of water depth off the southern end and 7' to 8' \non the inside of the \"L\". The dock has been designed so that barges can approach and land on \nthe end of the dock while vessels can dock along the \"L\". \nThe existing dock in Shallow Bay which is not permitted by the USACE in its current \nconfiguration will be removed upon completion of a usable new dock. \nEFTA00802612\n", "char_count": 1809}, {"efta_number": "EFTA00802602", "page_number": 11, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED STATES DEPARTMENT OF \nPLANNING AND NATURAL RESOURCES DEVELOPMENT PERMIT APPLICATION \nFORM L&WD-5 \nPROOF OF LEGAL INTEREST \nAFFIDAVIT \nI  3\":\"C vel  e \ntere..tut \n being duly sworn depose and say that: \nrr\nrprl kat)* (or lofts Doe or tiny ApphroM) \neVV)1co-k' &• \nnow.\n) U.X.— \nI. \naariis the (check one) \n(I or rarity/Applies) \n12<ord title owner (fee simple) \nOLessee \n0Other (specify) \nOf the real property described as Parcel No(s)Great St. James Island and CI & C2 \nEstate Gent a .lamp bird \nQuarter we Hooka No SA Rod Hoot \nIsland ST. Times \n\"Applicant(s) is required to provide documentation for legal Interest stated above (e.g. deed, lease, \netc.) \n2. I have the irrevocable approvals, permission, or power of attomey from all other persons with a legal interest \nin the property to undertake the work proposed in the permit application as more fully set forth in the exhibit \nrex,: lc lit \nignature \nDate \nSignature \nDate \nreist./(0,0104.1) tipasto44 OP R y(er, Tisci\n44....5ol \n4,4% °ea& \n:Thula !   \nPrint \nPrint \nThe foregoing instrument was acknowledged before me this tO day of  -Tao/ atel \n20  11 \n by \n(Na. or Name/Tide of &airy) \nat  f,\ntsa9evK \n county \n°Rust:art \n \n\u0013 \nChrabd9) (PAW \n \nn'h het ig,O,90IR \nNotary Public \nMy Commission expires \nNAM AVOW \nNOTARY PUBLIC•STATE OP NEW YORK \nNo. 01.W6313116 \nQualified in Richmond County \nMy Commission Expires October 14, 2018 \nEFTA00802613\n", "char_count": 1452}, {"efta_number": "EFTA00802602", "page_number": 12, "text_content": "GOVERNMENT OF THE VIRGIN ISLANDS OF THE UNITED \nSTATES DEPARTMENT OF PLANNING AND NATURAL \nRESOURCES DEVELOPMENT PERMIT APPLICATION \nFORM L&WD•7 \nCORPORATION/ASSOCIATION APPLICATION \n(To be used when a corporation or association is making a Permit Application in Tier I) \nGreat St. Jim, LLC \n(Corporation or Association Name) \nPoo \nSae. Via. uec-t \nPresident or Va \nuivalent \ntWyngf tee-6(.1_, rersriaried2NeLv, L c..1 \nSole_ Vicusiawar aPc-ranc-e4-. \nu_c_.\nPrint \n1 \nWI \nES : \n1- \nie eel . A)\n-t> weiro.‘ Z..0..eiti  &stain,  RR gets tnc. 1\nSecretary Name slit Wcualtr 4 \n'ink S-4•37.6vaC \nATTEST\n-s-ea_ \nSecretary Signature \nQ_\nSeal \nThe foregoing instrument was acknowledged before me this  t 0 \n day of  rad \na V-.1 \n2011_ by  Civ-eat- fsk • 'nu \nL—Lt_ \n at  'Att.) `fosek \n(Num a Nansorille of Wiry) \noft.,. 5LL £ t.\\.-. s)..ift‘ \n0/041)(192 (Mkt/ \n \nCratkeY \n.90tE \nNotary Public \nMy Commission expires \ncounty \nHABIBE AVDIU \nNOTARY PUBLIC-STATE OF NEW YORK \nrieF104044444n000cuinents: \nQuailed In Rictimdiugtatintylener from the Bureau of Internal Revenue \nMy Commission bras OlnityltilsIteallance letter from the Lieuteaant Governor's Office. \n3 \nCorporations and Associations: Certificate of Good Standing or equivalent. organizational documents & \nAmendments (Articles, Bylaws, Operating Agreement, Declarations) \nEFTA00802614\n", "char_count": 1337}, {"efta_number": "EFTA00802602", "page_number": 13, "text_content": "(Form L&WD-8) 1:08:96 \nFlood Plain Determination and Permit Application \nTo be completed by all applicants \n1. \nOwner.  Great St Jim. LLC \nMailing Address: 9053 Estate St. Thomas, Suite 101,St. Thomas, VI 00802 \nHome Tel. N: \nBusiness Tel.340 779.2564 \n H: Cellular if: \n2. \nDesigner: Jeffrey Bateman \nLie. \n1052•E \n Tel. \n340 778 7474 \n3. \nPlot th \nC1&C2\nFlood Zonc Designation:  YE EL e \nCellularil: 340 513 4684 \nEstate: Great St. James Island \n Quarters wee & wand\n Wet \nIf your flood zone designation is Zone A, AE, AO, Al.30, A99, V, VO, Ve or VI-V30 as shown on the NFIP FIRM \nMap. then complete this section. \nNFIP Flood Zone Designatio \nI. \nType of development: \nI or 2 Family dwelling \nMobile Home \nNon-Structural K \n3 Family or more, Apartment or Condo Structure K Non- Residential Structure:M \nCommercial Structurep \nNew Construction \nNon-Structural D\nAddition to Structure E] 50% Substantial Improvement of Existing Structure K \nDescription of Activity cosuomoncianA0anOxt a TeWerf an. Lard.gGroan Mon 0cckleroP Wong \n2. \nBase Flood Elevation at the Development Site is n1a \n ft. above mean sea level (msl). \n3. Elevation of the First Floor, Basement or Flood proof level for proposed structure is WEI \n4. \nDescribe the Non Structural Activity i.e. septic tank, waste water treatment plants etc. (including the location \nand development: Ns \n5. Attach a certified copy of site plan (8.5\" x I I) showing Base Flood Elevation. See sample attached. \nKR OFFICE USE ONLY \nIs the property located in an identified Flood Hazard Area? \n( ) YES \n( ) NO \nNFIP Zone Designation: \n Forward to Flood Plain Manager: ( ) YES \n( ) NO \nApplication: \nAPPROVED ( ) \nDENIED ( ) \nRESUBMIT ( ) \nPlan Reviewer Name: \nSignature:  \n \nDate:  \nEFTA00802615\n", "char_count": 1743}, {"efta_number": "EFTA00802602", "page_number": 14, "text_content": "GOVERNMENT OF \nTHE VIRGIN ISLANDS OF THE UNITED STATES \nVIRGIN ISLANDS BUREAU OF INTERNAL REVENUE \n(DPNR FORM L&WD-6) \nAPPLICATION FOR TAX FILING AND PAYMENT STATUS REPORT\" \nDate:  \n(JO \nThe applicant identified below hereby requests a letter certifying his or her tax filing and payment status for \nthe purpose of receiving a Coastal Zone Management Permit from the Virgin Islands Department of Planning \nand Natural Resources pursuant to Act 5270, amending Sections 910 (aX2) and 911 (d)(2) of the Coastal Zone \nManagement Act (Title 12, Chapter 21, Virgin Islands Code). The applicant authorizes the Bureau of \nInternal Revenue to disclose any taxpayer information necessary to process this application to the Virgin \nIslands Department of Planning and Natural Resources, who may make such further disclosures as are \nnecessary to carry out the requirements of the Coastal Zone Management Act, as amended. \nName:Great St. Jim, LLC \nBusiness Name: Great St. Jim, LLC \nEIN/11N:  (e \n\" \nt \nWel \nSSN: \nPlease Indicate: \nB\nCorporation \nPartnership \n0 Individual \n5 \nQtther 1-441W11-Iato t• VILauts\".3 \nDate Busine \nPerson R \nSignature: \nMailing Address: \nDate:  \nt Lo I 17 \nType of Business: \nPlease check forms that you use: \n01120, \n1065, 01 040,1:1941W. \nE1722V1,0noi3, 0720VI, \nDother (list) \nen,langt- \naeloc4\nPosition: itsiSele (Maw-6•a v-- c° Carte.\nTelephone Number:  34O —77Q asL4 \nReply to: 6115 Estate Smith Bay, suite 225. St. Thomas VI 00802 - 340-715-I040(phone), 340-774-2672(fax) \nor 4008 Estate Diamond, St. Croix VI 00820 - 340-773-1040(phone), 340-773-I006(fax) \n° Partnership and/or Corporations must list partners corporate officers, social security numbers and addresses \non a separate sheet and attach it to this application. \nTHIS FORM IS TO BE SUBMITTED TO VIBIR UPON COMPLETION \nEFTA00802616\n", "char_count": 1816}, {"efta_number": "EFTA00802602", "page_number": 15, "text_content": "GOVERNMENT OF THE U.S. VIRGIN ISLANDS \nBUREAU OF INTERNAL REVENUE \n6115 EST. SMITH BAY-\nST. THOMAS, VI 00802 \nTel: (340) 714-9320 \nFax: (340) 714-9341 \nGREAT ST. JIM, LLC \n9053 ESTATE THOMAS \nSUITE 101 \nST THOMAS, VI 00802-0000 \nDear Taxpayer: \n7/13/2016 \n4008 ESTATE DIAMOND - PLOT 7-B \nCHRISTIANSTED, VI 00820 \nTel: (340) 773-1040 \nFax: (340) 773-1006 \nBusiness EIN: 660848875 \nRE: CZM ONLY \nPlease Submit This Letter To Your CZM Authority \nThis is in response to your application of 6/21/2016 in which you requested \na letter of clearance for a Costal Zone Management Permit pursuant to Title 12, \nV. I. Code, Section 910 (a) (c). \nBased on the information in our files, we find that you are current in the \nfiling and payment of your tax obligation. This Certification is for Costal \nZone Permit purposes only and does not absolve you of any subsequent revelation \nof tax obligation past or future. \nSincerely, \nDelinquent Accounts & Returns \nEFTA00802617\n", "char_count": 960}, {"efta_number": "EFTA00802602", "page_number": 16, "text_content": "‘4144Es v64<est \nGOVERNMEM Of \n044 UNITED SIAM V39GIN MAWS \nOFFICE OF THE LIEUTENANT GOVERNOR \nDIVISION OF REAL PROPERTY TAX \nH0S King 51,4944 • Chtlionsted, Vegan blonds 00820 • 340 773.6449 • Fox 340.773.0330 \nIS Noncom God. • Cholollo Amok,. Vier Islondi 00602 • 343 7747991 • lox 340.7746953 \nREAL PROPERTY TAX CLEARANCE LETTER \nTO: \nRecorder Of Deeds \nFROM: \nOffice of the Tax Collector \nIn accordance with Title 28, Section 121, as amended, this shall certify that \nthere are no outstanding Real Property Tax obligations for the following: \nPARCEL NUMBER \n1-09801-0101-00 \nLEGAL DESCRIPTION \nGREAT ST JAMES ISLAND \nRED HOOK QTR. \nOWNER'S NAME \nKJAER, CHRISTIAN \nTaxes have been researched up to and including  \n2016\nCERTIFIED TRUE AND CORRECT BY \nLUDENCE ROMNEY \nTAX COLLECTOR \n,C1L \n7-nATURE \n11/04/2016 \nDATE \nEFTA00802618\n", "char_count": 831}, {"efta_number": "EFTA00802602", "page_number": 17, "text_content": "GOVERNMENT OF \nTHE UNITED STATES VIRGIN GLANDS \nOFFICE OF THE LIEUTENANT GOVERNOR \nDIVISION OF REAL PROPERTY TAX \nHOS King Shoot • Chathambd. Vsspin blonds 00620 • 310 773.640 • Fax 310 773 0130 \n16 Kciertns God* • Ghorlotl• Amon. Vier tslorAh 00502 • 340 2112991 • Fox 310.7746953 \nREAL PROPERTY TAX CLEARANCE LETTER \nTO: \nRecorder Of Deeds \nFROM: \nOffice of the Tax Collector \nIn accordance with Title 28, Section 121, as amended, this shall certify that \nthere are no outstanding Real Property Tax obligations for the following: \nPARCEL NUMBER \n1-09801-0102-00 \nLEGAL DESCRIPTION \nB-18B-2 GREAT ST JAMES ISLAND \nRED HOOK QTR. \nOWNER'S NAME \nGSJ PROPERTIES CORP \nTaxes have been researched up to and including  \n2016\nCERTIFIED TRUE AND CORRECT BY \nLUDENCE ROMNEY \nTAX COLLECTOR \nnte 4 -,) \nSIGNATURE \n11/03/2016 \nDATE \nEFTA00802619\n", "char_count": 834}, {"efta_number": "EFTA00802602", "page_number": 18, "text_content": "GOVERNMENT Of \nWE UNITED STATES VIRGIN ISLANDS \nOFFICE OF THE LIEUTENANT GOVERNOR \nDIVISION OF REAL PROPERTY TAX \n1106 King Street • Christiansted. Warn blond 00620 • 340173.6449 • fax 340.773.0U) \n16 Keeton. God. • Charlotte MS \nVirgin blonds 00602 • 34.7742991 • fax 340.774.6953 \nREAL PROPERTY TAX CLEARANCE LETTER \nTO: \nRecorder Of Deeds \nFROM: \nOffice of the Tax Collector \nIn accordance with Title 28, Section 121, as amended, this shall certify that \nthere are no outstanding Real Property Tax obligations for the following: \nPARCEL NUMBER \n1-09801-0103-00 \nLEGAL DESCRIPTION \nC-1&C-2 GREAT ST JAMES ISLAND \nNo.6A RED HOOK QTR. \nOWNER'S NAME \nFURST, JOHN K. , KIM & NINA \nTaxes have been researched up to and Including  \n2016\nCERTIFIED TRUE AND CORRECT BY \nLUDENCE ROMNEY \nTAX COLLECTOR \nSIGNATURE \n11/04/2016 \nDATE \nEFTA00802620\n", "char_count": 837}, {"efta_number": "EFTA00802602", "page_number": 19, "text_content": "ENVIRONMENTAL ASSESSMENT \nFOR THE CONSTRUCTION OF TWO DOCKS AND A BARGE \nLANDING \nON GREAT ST. JAMES ISLAND \nU.S. VIRGIN ISLANDS \nPREPARED FOR \nGREAT ST. JIM, LLC. \nPREPARED BY \nBIOIMPACT, INC. \nM. BOX 132 \nKINGSHILL, ST. CROIX \nU.S. VIRGIN ISLANDS 00851 \nbioimpact@islands.vi \nJANUARY 2017 \nEFTA00802621\n", "char_count": 305}, {"efta_number": "EFTA00802602", "page_number": 20, "text_content": "TABLE OF CONTENTS \nSECTION \n1.00 NAME AND ADDRESS OF APPLICANT \nPAGE \n1 \n2.00 LOCATION OF PROJECT \n1 \n2.00.1 Location and Agency Review Map \n1 \n2.00.2 Vicinity Map \n2 \n3.00 ABSTRACT \n2 \n4.00 STATEMENT OF OBJECTIVES SOUGHT BY THE \nPROPOSED PROJECT \n3 \n5.00 DESCRIPTION OF PROJECT \n4 \n5.01 Summary of Proposed Activity \n5 \n5.0Ia Purpose of Project \n5 \n5.01b Presence and Location of Any Critical Areas and Possible Trouble Spots 5 \n5.OIc Method of Construction \n8 \n5.OId Provisions to Limit Site Disturbance \n9 \n5.01e Sediment Control Methods to be Implemented \n9 \n5.01 f Schedule for Construction Activities and Implementation \nof Sediment Control Measures \n9 \n5.OIg Maintenance of Sediment and Siltation Control Measures \n9 \n5.02 Exhibits and Drawings \n10 \n5.03 Project Work Plan/Schedule \n14 \n6.00 ECOLOGICAL SETTING AND PROBABLE PROJECT IMPACT \nON THE NATURAL ENVIRONMENT \n15 \n6.01 Climate and Weather \n15 \n6.02 Landform, Geology, Soils and Historic Land Use \n19 \n6.03 Drainage, Flooding and Erosion Control \n24 \n6.04 Fresh Water Resource \n29 \n6.05 Oceanography \n29 \n6.06 Marine Resources and Habitat Assessment \n37 \n6.07 Terrestrial Resources \n47 \n6.08 Wetlands \n49 \n6.09 Rare and Endangered Species \n54 \n6.10 Air Quality \n55 \nEFTA00802622\n", "char_count": 1243}, {"efta_number": "EFTA00802602", "page_number": 21, "text_content": "SECTION \nPAGE \n7.00 IMPACT OF THE PROPOSE PROJECT ON THE HUMAN \nENVIRONMENT \n56 \n7.01 Land and Water Use Plans \n56 \n7.02 Visual Impacts \n56 \n7.03 Impacts of Public Services and Utilities \n56 \n7.04 Social Impacts \n57 \n7.05 Economic Impacts \n57 \n7.06 Impacts on Historical and Archaeological Resources \n57 \n7.07 Recreational Use \n57 \n7.08 Waste Disposal \n57 \n7.09 Accidental Spills \n58 \n7.10 Potential Adverse Effects, Which Cannot be Avoided \n58 \n8.00 MITIGATION PLANS \n58 \n9.00 ALTERNATIVES TO PROPOSED ACTION \n58 \n10.00 RELATIONSHIP BETWEEN SHORT AND LONG TERM \nUSES OF MAN'S ENVIRONMENT \n59 \n11.00 REFERENCES \n60 \nAppendix A \nQualification Statements of Preparers \nBioimpact, Inc. \nBCSC Dispova \nAppendix B \nCoral Relocation and Mitigation Plan \nAppendix C \nWater Quality Monitoring \nAppendix D \nTree Boa Protection Plan \nii \nEFTA00802623\n", "char_count": 841}, {"efta_number": "EFTA00802602", "page_number": 22, "text_content": "1.0 NAME AND ADDRESS OF APPLICANT \nGreat St. Jim, LLC \n9053 Estate St. Thomas, Suite 101 \nSt. Thomas, VI 00802 \n2.0 LOCATION OF PROJECT \nGreat St. James Island is located to the southeast of the island of St. Thomas. The \ngeographic coordinates of the island are 18° 18.583' N and 64° 49.752' W. The \nTemporary Barge Landing is located at 18° 18.902' N and 64° 49.802'W, the western \nChristmas Cove Dock is located at 18° 18.804' N and 64° 49.876' W, and the southern \nbarge landing/dock is located at 18° 18.355' North L and 64° 49.659' W. The Location \nand Agency Review Ma. and Vicinity Map follow. \nMealier \na. \nPsis. \nCalf \nRock \nC•1141til POInt \nGreet Bay \nSt JINNI Bay \ne‘. \nCu 'Tent \nFl\netz \nocy-\n( \nRi \n1 Sam St Maui \nMind \n4. 1\nFM \nCac \nTM Summits \nS \nwit\nWK \nRoof \n-0 c\n. \n1. \nFigure 2.01 Agency Review Map, the entire island of Great St. James is within CZM first \ntier jurisdiction. The dock locations on the island are indicated. \n1 \nEFTA00802624\n", "char_count": 961}, {"efta_number": "EFTA00802602", "page_number": 23, "text_content": "•At\n \nRol Hook \nfib \nke4, 00, \nPt \nRedhook \nNOY \n-^. \nnt..,t. \n!qt.-\n4.14, \ntt.\nGnat \nguy \na • \ntil \nc \nNom\naw.,. \nNAY \ni‘on \nCa, \nea \nSteven C.y \nC-. \n'I. \nC \nLittle \nSi Jan'\n I \n...• \n..,4 \n••• • \n— \n. . Dog \nw \na \n- \na —*V \n \n• lb \n7- \n \nIsland \n\\ \n/ \n.\\--- j \nruN\nFigure 2.02 Vicinity Map showing Great St. James Island in relationship to the \nsurrounding area. \nOP \n3.00 ABSTRACT \nGreat St. Jim, LLC is seeking to construct two docks, one of which is a combination \ndock/ barge landing, and a temporary barge landing to provide access to Great St. James \nIsland. \nThere is currently a small pile-supported dock located within Shallow Bay on the north \nside of the island. The bay is very shallow and vessels accessing the dock have damaged \nthe shallow seagrass beds within the bay. At one time, there had been a concrete \nbulkhead at the shoreline with a small floating dock. The previous owner submitted an \napplication for the existing dock which was approved by DPNR's Division of Coastal \n2 \nEFTA00802625\n", "char_count": 1015}, {"efta_number": "EFTA00802602", "page_number": 24, "text_content": "Zone Management, but was not approved by the U.S. Army Corps of Engineers due to \nobjections by National Marine Fisheries because of the shallowness of the bay. The dock \nwas constructed by the previous owner despite not receiving the federal permit and \nnotices were issued by the USACE requesting the removal of the unpermitted structure. \nThe dock however was never removed. The applicant, understands the issues with the \nexisting dock and is proposing to remove the dock as soon as another dock is constructed \nand usable. \nA detailed study was done around the entire island to determine suitable locations for \ndock location. All ESA listed corals were located and docks and barge landings were \ndesigned to avoid these corals. \nA temporary barge landing is being proposed on the northwestern facing beach. This site \nis to the west of the salt pond and the associated wetlands. This a shoreline ramp which is \n25 feet (ft) wide and 40ft in length extends to the Mean Water Line. The landing is free \nof both coral and seagrass colonization. The landing is excellent for short term transfer of \nmaterial or equipment. The site is well protected from normal wave action but is \nperiodically impacted by wave action from ferries which travel through current cut \nbetween Great St. James and St. Thomas. The wakes from these vessels make it an \nunattractive site for mooring a barge for any length of time at the site. This landing can be \nquickly constructed and utilized while the combination dock and barge landing on the \nsoutheastern side of the island is constructed. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there \nwas a dock in this location and there are still old concrete piles lying in the shallows of \nthis site. The proposed dock will be 10ft in width and 195ft in length extending 187ft \nfrom mean low water (MLW) and I 93ft from mean high water (MHW). The dock \nextends beyond the nearshore hardbottom to a depth of 15ft out in the uncoloni\n... [truncated, 2961 chars — for the full page use /api/corpus/document/EFTA00802602/24 or ?id=EFTA00802602&page=24]", "char_count": 2961}, {"efta_number": "EFTA00802602", "page_number": 25, "text_content": "and a combination barge landing/dock on the southeast side of the island on the point \nclosest to Little St. James. The existing dock in Shallow Bay will be removed as soon as \none of the docks is functional. \n5.0 SUMMARY OF PROPOSED ACTIVITY \nGreat St. Jim, LLC is seeking to construct two docks, one of which is a combination \ndock/barge landing, and a temporary barge landing to provide access to Great St. James \nIsland. A detailed study was done around the entire island to determine suitable locations \nfor the dock locations and the sites with the least environmental impact were chosen. \nA temporary barge landing is being proposed on the northwestern facing beach. This site \nis to the west of the salt pond and the associated wetlands. This a shoreline ramp which \nis 25 feet (ft) wide and 40ft in length extends to the Mean Water Line. Two bollards will \nbe placed to either side of the ramp and two moorings will be installed 75ft offshore on \neither side of the ramp in just over 7ft of water depth. The mooring will be installed \nusing helix anchors and will use floating lines will be used to avoid seafloor disturbance \nwhen the moorings are not in use. The landing is free of both coral and seagrass \ncolonization. The landing is excellent for short term pick up and drop off of material or \nequipment. The site is well protected from normal wave action but is periodically \nimpacted by wave action from ferries which travel through current cut between Great St. \nJames and St. Thomas. The wakes from these vessels make it an unattractive site for \nmooring a barge for any length of time at the site. This landing can be quickly \nconstructed and utilized while the combination dock and barge landing on the \nsoutheastern side of the island is constructed. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there \nwas a dock in this location and there are still old concrete piles lying in the shallows of \nthis site. The proposed dock will be 10ft in \n... [truncated, 3054 chars — for the full page use /api/corpus/document/EFTA00802602/25 or ?id=EFTA00802602&page=25]", "char_count": 3054}, {"efta_number": "EFTA00802602", "page_number": 26, "text_content": "\"L\". The dock has been designed so that barges can approach and land on the end of the \ndock while vessels can dock along the \"L\". \n5.0Ia Purpose of Project \nThe purpose of this application is to provide access to the island of Great St. James. \nGreat St. Jim, LLC is proposing to construct a temporary barge landing to be used during \nthe construction of the other docks, an access dock on the western side of the island to be \nused for worker and guest access to the island, and a combination barge landing/dock on \nthe southeast side of the island on the point closest to Little St. James. The existing dock \nin Shallow Bay will be removed as soon as one of the docks is functional. \n5.01b Presence and Location of any Critical Areas and Possible Trouble Spots \nThe island of Great St. James is within the Vessup Bay/ East End Red Hook Area of \nParticular Concern (APC) (Figure 5.01.1). The Vessup Bay/Red Hook APC is located on \nthe eastern end of St. Thomas and includes Nazareth, Muller, Vessup, Red Hook, Great \nBay, Cowpet Bay, Cabrita, Beck and Water Point, Great St. James, Little St, J, and Dog \nIsland. \nFigure 5.01.1 Areas of Particular Conem (STEER (2011) St. Thomas East End Reserve \nManagement Plan. St. Thomas, USVI. \n5 \nEFTA00802628\n", "char_count": 1251}, {"efta_number": "EFTA00802602", "page_number": 27, "text_content": "The island also lies within the St. Thomas East End Reverse (STEER). STEER was \ndeveloped to help protect coastal resources including seagrass beds and coral reef \ncommunities. The island of Great St. James is in area C of the reserve and is referred to \nas St. James (Figure 5.01.2). \nSe Th \nThe UvIna Omens \nHal \n(2001) \nSal ter* pftgewm \nSalrack assay S ca-w. en. \n011•8 *ran \nan tadredt \nOmit nen II snowing \n<- \nWars \nMal a paalallta \nSOWSnotala Spa Sri cove,\n*WIN Mais l Ws algal ow& \nMean Se/ SM. \n* \nWean nal \nUS at Safi \nRune \nSeal \nUMW aatensfas \nSndol est I I enewans \nNatural Resource Inventory \nSI Thomas East End Ramon Cannunic \nDecember 4. 2008 \nRaw Cadi \n\"or Mean Wawa Gay \nMentnena Mace. \nP \nRaab \nMane linen* \nA len thingame Lagoon \nOa Cr Cay Manarowl Uwe \nsow. ewes \nCIC St into \nhand cay sn'utAwsl \nSOY Sal Kest \nTuel Gland  laspore \nCORISS PSI Mil Peal \nCli\n?--\nI\nS \n\" a\" .\nVegenseen Ca \nnow \na\n▪ s,. \nDm*, \n▪ \nascsacue best \nCoital raw! \n1.Astre tent \nAsia,\nRock ponevnt \nkiervo.•• \ninane pera \nCoss Ns* \nlams leo \n*minimise \nFigure 5.01.2 STEER boundaries. (STEER (2011) St. Thomas East End Reserve \nManagement Plan. St. Thomas, USVI. \n6 \nEFTA00802629\n", "char_count": 1175}, {"efta_number": "EFTA00802602", "page_number": 28, "text_content": "The regulations for the St. James are as follows: \nSt. lames \nMarine \nReserve and \nWildlife \nSanctuary \nSubchapter \n96, Section \n96-3 \nProhibited Activities within the St. James MRWS: \n• It is unlawful to remove any marine or other wildlife without \na permit or specific authorization from the Commissioner \nSubchapter \nPermitted Activities within the St. James MRWS: \n96, Section \n964 \nActs permitted, provided a permit is first obtained from the \nCommissioner: \n• Scientific collecting in support of and for use in a research \nproject with an approved protocol \n• The use of castnet with a minimum square mesh size of X \ninch to capture baldish (fry) within 50 feet of the shoreline, \nexcept for Cow and Calf rocks \n• Fishing with hook and line \nThe marine habitats around Great St. James have abundant coral and seagrass resources. \nThere are numerous ESA listed corals species near the proposed dock locations. \nAcropora palmata, Acropora. cervicornis, Orbicella amzularis, Orbicella franksi and \nOrbicella faveolata as well as Dendrogyra cylindrus are found off all the beach from \nwhich the proposed docks and barge landings are planned. At the northern temporary \nbarge landing site, these corals are located primarily to the west in an area of coral \nboulders and coral rubble. However, there are several small A. palmata and several 0. \nammlans located on the shoreline cobble which extends out to a depth of 6.5ft. The \npresence of these species as well as several non-ESA listed Porites astreoides has \ndictated the location of the ramp. The proposed temporary barge landing position avoids \nall coral and seagrass resources. \nLocation of the western dock has a cobble beach between two areas of emergent bedrock \nand boulders. A. palmata occur on the emergent bedrock to the north. Offshore the \nseafloor quickly gives way to exposed pavement. There is a long linear depression right \noffshore and an old piling lies within this area. The fractured pavement then extends to \napproximately\n... [truncated, 2787 chars — for the full page use /api/corpus/document/EFTA00802602/28 or ?id=EFTA00802602&page=28]", "char_count": 2787}, {"efta_number": "EFTA00802602", "page_number": 29, "text_content": "The southern dock also extends from a cobble beach which gives way to rock pavement \nand has emergent bedrock and boulders on either side of the beach. There are Acropora \ncolonies to the east and farther to the south on the bedrock and boulders. There are \nOrbicella and Dendrogyra within the embayment and their locations have dictated the \nlocation of the dock. The dock avoids all ESA listed corals but will require the relocation \nof approximately 75 corals. \nThis southern dock will include a combination wave attenuator and reef building system. \nA mitigation plan has been prepared and is found in Appendix B. \nBecause of the rock occurring in the area, some of the pilings may require socketing and \nif this is required special water quality measures will be taken. If at all possible a vibra-\nhammer will be used to drive the piles. A water quality monitoring program has been \nproposed and the plan is found in Appendix C. \nThe area is known habitat to protect sea turtles and marine mammals and as such \nNOAA's Sea Turtle and Smalltooth Sawfish Construction Conditions will be followed as \nwell as NOAA's Vessel Strike Avoidance Measures and Reporting for Mariners. \nThe property contains 6 salt ponds. The wetland around the salt ponds have been \ndelineated and the delineations were approved by the U.S. ACOE during a previous \napplication for development of the island. This delineation is more than 5 years old, but \nno wetland disturbance will occur as a result of this project. \nThe island is known to be habitat to the St. Thomas Tree Boa that is a listed rare and \nendangered species. The boa as well as another species of snake have been seen during \nthe field studies. There will be special corridors and preservation areas set aside on the \nisland for these species. The access ways to the western and southern docks already \nexist, but the branch that will need to be developed to the temporary barge landing will be \ncleared by hand to limit impacts to the tree boas. A tree \n... [truncated, 2921 chars — for the full page use /api/corpus/document/EFTA00802602/29 or ?id=EFTA00802602&page=29]", "char_count": 2921}, {"efta_number": "EFTA00802602", "page_number": 30, "text_content": "required, seafloor length curtains will be used and monitored and not removed until water \nquality within the curtains has fallen to acceptable limits. All corals within the curtain \nlimits will be removed to prevent damage by settling sediments. Once the pilings have \nbeen placed, re-enforcing steel will be placed and concrete poured. Turbidity controls \nwill be installed and water quality monitoring will occur during all concrete pouring. \nOnce the piles are completed the pile caps and decking will be placed. \nAccess slabs will be constructed from shore and silt fencing will be placed seaward of all \nexcavations. \n5.0Id Provisions to Limit Site Disturbance \nThe dock locations have been located to minimize impact on the marine environment by \navoiding all ESA listed corals and seagrass beds. Corals which cannot be avoided will be \nrelocated out of the footprint and potential area of impact and turbidity control and water \nquality monitoring will be implemented. The branch of the road to the temporary barge \nlanding will be first cleared by hand to minimize impact to the VI Tree Boa. A Tree Boa \nprotection plan is found in Appendix D. \n5.00e Sedimentation Control Methods to be Implemented. \nSilt fencing will be placed seaward of all upland excavation and construction. Turbidity \nbarriers will be installed around all areas of in-work, including pile driving and concrete \npouring overwater. If pile socketing is required two rows of turbidity barriers will be \ninstalled and these curtains will be seafloor length. These curtains will be maintained \nuntil the interior water quality has fallen to acceptable levels. \n5.00f Schedule for Construction Activities and Implementation of Sediment Control \nMeasures \nSilt fencing will be installed prior to any upland excavation and maintained throughout \nconstruction. All construction will be occurring in cobble areas without vegetation, so \nfencing will be maintained until such time no exposed soil is within the area. \nSilt fencin\n... [truncated, 2582 chars — for the full page use /api/corpus/document/EFTA00802602/30 or ?id=EFTA00802602&page=30]", "char_count": 2582}, {"efta_number": "EFTA00802602", "page_number": 31, "text_content": "progress (over weekends/holidays). Turbidity bathers will be monitored throughout the \nday and will be repaired and adjusted as necessary as part of the water quality monitoring \nplan. Curtains will be maintained throughout the day and removed or secured as \nnecessary when no in-water work is ongoing. \n5.02 \nEXHIBITS AND DRAWINGS \nDrawing \nPage \nProposed Temporary Barge Landing \n11 \nWestern Access \n12 \nSouthern Access Dock/Barge Access \n13 \n10 \nEFTA00802633\n", "char_count": 462}, {"efta_number": "EFTA00802602", "page_number": 32, "text_content": ".\n.\n.\nl\no\nt\n \ns\ne\na\ns\na\n-\nSAL 1 POND LIM! s \n09.21 2016 \nA/MU VA Lfil1 \nWIC 411. SA\n001140 \nIMO \neAC \nViC41A/541 \nar \n- - \nNWT X \nMOORING \n, 117 L•41 \ne \n• tor nig \ngalOal \n0011PALNOTM \nrer.r.a=r\"\" \nuw \nSITE OVERVIEW (I' • 80 ft) \n0I \n; \n5 \nyyy'\n7\nDa\n1 \n; \nGS.I \nEFTA00802634\n", "char_count": 276}, {"efta_number": "EFTA00802602", "page_number": 33, "text_content": "ZI \nEFTA00802635\n", "char_count": 17}, {"efta_number": "EFTA00802602", "page_number": 34, "text_content": "V \nS \nate • \nPITS \nSITES \n.Ave AZISSellt \nMS SWISS 17 MP \nPINS111.01 \n4SIPCIOUTFIC \nCOCS 0001•001 \n7 \nO \nSITE PLAN VIEW \n00.•••••••• \n_\nN ISMS \nOCISII•a \n......... \nPILING CONFIGURATION \n••••••••Vre.ttete.CIPM1.4 \n..r.01,1••••••• Farina. \n•-••••••••••• \n*--. ..,••••••••Sulaa \nWAVE ATTENUATION SETUP \nGSJ 3 \nC. • \nEFTA00802636\n", "char_count": 327}, {"efta_number": "EFTA00802602", "page_number": 35, "text_content": "5.03 Project Work Plan/Schedule \n• \nTemporary Barge Landing \nI. Placement of silt fencing \n2. Excavation of footings \n3. Framing of slab \n4. Placement of bollards \n5. Pouring of concrete \n6. Removal of silt fencing once all areas are stabilized \n7. Placement of moorings \n• \nSouthern Dock \nI. Placement of turbidity bathers \n2. Placement of piles - vibra-hammer or socketing \n3. Placement of re-enforcing steel and pouring of concrete \n4. Placement of pile cabs and deck slabs \n5. Turbidity barriers moved/removed as necessary once interior water quality is \nacceptable \n6. Placement of silt fencing \n7. Excavation of footing \n8. Framing of slab \n9. Pouring of concrete \n10. Removal silt fencing once all areas are stabilized \n• \nWestern Dock \nII. Placement of turbidity barriers \n12. Placement of piles/vibra-hammer or socketing \n13. Placement of re-enforcing steel and pouring of concrete \n14. Placement of pile cabs and deck slabs \n15. Turbidity barriers moved/removed as necessary once interior water quality is \nacceptable \n16. Placement of silt fencing \n17. Excavation of footing \n18. Framing of slab \n19. Pouring of concrete \n20. Remove silt fencing once all areas are stabilized \n14 \nEFTA00802637\n", "char_count": 1205}, {"efta_number": "EFTA00802602", "page_number": 36, "text_content": "6.00 ENVIRONMENTAL SETTING AND PROBABLE PROJECT IMPACTS \n6.01 Climate and Weather \nPrevailing Winds \nThe Virgin Islands lie in the \"Easterlies\" or \"Trade Winds\" which traverse the southern \npart of the \"Bermuda High\" pressure area, thus the predominant winds are usually from \nthe east-northeast and east (IRF, 1977). These trade winds vary seasonally (Figure \n6.01.1) and are broadly divided into 4 seasonal modes: I) December to February; 2) \nMarch to May; 3) June to August; and 4) September to November. Below are the \ncharacteristics of these modes as taken from Marine Environments of the Virgin Islands \nTechnical Supplement No. I (IRF, 1977). \nDecember - February \nDuring the winter the trade winds reach a maximum and blow with great regularity from \nthe east-northeast. Wind speeds range from eleven to twenty-one knots about sixty \npercent of the time in January. This is a period when the Bermuda High is intensified \nwith only nominal compensation pressure changes in the Equatorial Trough. The trade \nwinds during this period are interrupted by \"Northerners\" or \"Christmas Winds\" which \nblow more than twenty knots from a northerly direction in gusts from one to three days. \nSuch outbreaks average about thirty each year. They are created by strengthening of \nhigh-pressure cells over the North American continent, which, in turn, allow weak cold \nfronts to move southeastward over the entire Caribbean region. Intermittent rains, clouds \nand low visibility accompany these storms. \nMarch - May \nDuring the spring, the trade winds are reduced in speed and blow mainly from the east. \nWinds exceed twenty knots only thirteen percent of the time in April. The change in \nspeed and direction is the result of a decrease of the Equatorial Trough. \nJune - August \nTrade winds reach a secondary maximum during this period and blow predominantly \nfrom the east to east-southeast. Speeds exceed twenty knots twenty-three percent of the \ntime during July. The trend for increasing winds results\n... [truncated, 2481 chars — for the full page use /api/corpus/document/EFTA00802602/36 or ?id=EFTA00802602&page=36]", "char_count": 2481}, {"efta_number": "EFTA00802602", "page_number": 37, "text_content": "especially during late August through mid-October, the normal trade wind regime is often \nbroken down by easterly waves, tropical storms, and hurricanes. \nStorm and Hurricanes \nThere are numerous disturbances during the year, especially squalls and thunderstorms. \nThese occur most frequently during the summer, lasting only a few hours, and causing no \npronounced change in the trade winds. \nA tropical cyclone whose winds exceed 74 miles per hour is termed a hurricane in the \nnorthern hemisphere, and significantly affects the area. These hurricanes occur most \nfrequently between August and mid-October (Figure 5) with their peak activity occurring \nin September. The annual probability of a cyclone is one in sixteen years (Bowden, \n1974). \nClimate \nNo rainfall data is available for Great St. James. However, based on the vegetation on the \nisland the island which is dry adapted, it is probable that the island gets between 36-45 \ninches of rainfall a year. Rainfall usually occurs in brief, intense showers of less than a \nfew tenths of an inch and major rainfall events are associated with weather systems \n(USGS 1998). The Virgin Islands have no sharply defined wet season. The wettest \nperiod generally is from September to November, and the driest period is from January to \nJune (USGS 1998). The Cruz Bay which is the closest monitored station receives \nbetween 39 inches of rainfall annually. The average rainfall received between 1972 and \n2012 is found in the table below. \nCRUZ BAY, VIRGIN ISLANDS (671980) \nPeriod of Record Monthly Climate Summary \nPeriod of Record : 1/ 1/1972 to 3/31/2012 \nJan \nFeb Mar Apr May Jun \nJul \nAug Sep \nOct \nNov Dec \nAnnual \nAverage Max. \nTemperature (F) \nAverage MM. \nTemperature (F) \nAverage Total \nPrecipitation (in.) \nAverage Total \nSnowFall (in.) \nAverage Snow Depth \n(in.) \nPercent of possible observations for period of record. \nMax. Temp.: 71.2% MM. Temp.: 71.8% Precipitation: 88.2% Snowfall: 93.3% Snow Depth: 93.2% \nCheck Station Metadata  or\n... [truncated, 2499 chars — for the full page use /api/corpus/document/EFTA00802602/37 or ?id=EFTA00802602&page=37]", "char_count": 2499}, {"efta_number": "EFTA00802602", "page_number": 38, "text_content": "The difference between the mean temperatures of the coolest and warmest month is only \n5 to 7 degrees F. The highest temperatures August or September and the lowest are in \nJanuary or February. The highest average daytime temperature in the warmest months is \nabout 88 degrees F, and in the coolest months is in the low 80's. Nighttime lows are \nusually in the mid 70's during the warmer months and in the high 60's during the cooler \nmonths (USGS 1998). In general, air temperature in the Virgin Islands ranges between \n77 degrees and 85 degrees. \nnV \n7O' \n27- \nn'• \nvw \n, \nare \nCO,  \n' \nitime \ntrw \nUV \nWs \n01 \nSIV \nal \n \n ........ \n•,. 3 \nes \nt \n. \nv \n(., ,:, .......,,........ \n......__.____.....,.. \n..................„..._............. C=7- \"-;\nrale \nji\n. • \nL \nL.L.J ...=::.==.\n1....\n0•100 \nC.. \n*... \n0 \nt \nO \nL000401 \nto \nv \n\". \n'..av o.\n—........e.......0 \n............---. \na \nrnaltRY \nC \ntfrc;\nr. \nIthatai \nCI \nIttfOl \n0 \namsaul \n41( \nFrit \nQ\nI ,\n0 \n3,\n2, \n7-1 \n'\nHAY \nIV \n1, 4 \nJut \nWV \n\\ \nWM \nSURFACE WINDS \nen. \n% \nNV \nO1 \nPry \nar \nO. \nOV \n01 \n1, 1 \n4(1 \nO1 \n((V \nUV \n0%. \ntno \n&no \n0V \n00.4 flt01.10 SA VI- \nMAID{ \nMOW MON La -. -, \nFigure 6.01.1. Prevailing Winds in the U.S. Virgin Islands, January through June \n17 \nEFTA00802640\n", "char_count": 1248}, {"efta_number": "EFTA00802602", "page_number": 39, "text_content": ".11r...• \n„\n-......-.....--.---- \nww \n1/.1 \nKW \nrk• \n— \nIn \nIn\ntr. \nIN \nire \n7).• \nrrw \nrev \nIt* \nIts \nIn \nWit \nart' \n.• \nlire Ire \n•.nd les \nIn \nyew \nr. \n• \nno \nVW \ntr. \nn, \nm\nI\n, \n-.. \nvv \nrot \n.-N__.\n`` ' ' \nt-,\".±.:\".5\n- \n••••• \n \n . r ............ \n,........\n............-.6.......\n•••••••••,-..---• ..-----.•-••-• \n7 ::r.....„._. \n....-....... .„-......-„....„... \n..„ \n,_..............,....... \n''. L-......J ::=7:::=.7.7.r\n.\n. \n•.....r .............,......... \n..... • • ................... \n-...-....-..... \n..„..,_ \n....• , \n.........-. \n...\"'\" .. --•\"'. \"\"' \n•-•-• \n..t:.: ...., \nc_77.......e' \n.Par,, \n••• \nCil \nC\n \n.... JIM \n. \nes \nIS\" \n0 • \nCA \nCfr• \nCO \nWawa \nst,i \nWIMP \n4 \n2 \n0 \n'MON \n/ \n\\ \nWV \net \nteiWAll \nWM! \n• \nvam.,A \nCCM\" \n C:. \nCa \nOW\nMOW \nIlk \nS \nSURFACE WINDS \nere \nwto \nwt. cr. \nr.v \nrn \nrn \nm \nMt \n• \ncnt \nars \nIts \nGry \nors \nvine \nMAI \nPIIISIM IS. ILL MS NIAM \nAU nos teas et sr, \nFigure 6.01.2. Prevailing Winds, U.S. Virgin Islands July through December. \n12 \n11 \n10 \n9 \na \n7 \n6 \nS \n4 \n3 \n2 \n1 \nATLANTIC BASIN \nAVERAGE CUMULATIVE NUMBER OF \nSYSTEMS PER YEAR \nPt RIOD OF RI (ORO 1944. Z001 \nU ?JAE \nCAT 3 OR GREATER \n0 \no \n10. I \nFigure 6.01.3. Tropical Hurricane Frequencies in the Virgin Islands (National Weather \nService . \n18 \nEFTA00802641\n", "char_count": 1276}, {"efta_number": "EFTA00802602", "page_number": 40, "text_content": "0 \na) \na) \n0 \nOn \n0 \nCl, \nO \n0 \nHurricanes and Tropical Storms \nHurricanes \nO \no \nO \n(.4 \n0 \nz \na \nV \nO \n(-4 \n-110 \n-100 \n- 90 \n• 80 \n-70 \n- 60 \n• 50 \n-40 \n-30 \n- 20 \n-10 \n0 \nNumber of Storms per 100 Years \nNOAA \nFigure 6.01.4. Tropical Storm and Hurricane Occurrences in the Atlantic (National \nWeather Service) \n6.02 Landforms, Geology, Soils, and Historic Use \nGEOLOGY OF ST. THOMAS, ST JOHN AND SURROUNDING CAYS \nThe Virgin Islands are near the northeastern corner of the present Caribbean Plate, a \nrelatively small trapezoidal-shaped plate that is moving eastward relative to the North and \nSouth American continents carried on the American plate. The arc of the Lesser Antilles \nis an active volcanic arc above a subduction zone in which the Atlantic oceanic crust of \nthe American Plate is carried downward under the Caribbean Plate. The closest volcano \nto the Virgin Islands that is still active is Saba, about 160 km. to the east. \nSt. John is 7 miles long and 3 miles wide for a total of 12,000 acres or 19 square miles. \nThe oldest rocks of St. John are submarine lavas (keratophyre and spilite), beds of \nvolcanic debris and chert. Associated intrusive rocks of the Water Island Formation is \noverlain by andesitic volcanic and volcanoclastic rocks of the Louisenhoj Formation \nwhich underlies the island of St. Thomas to the east and much of the northwestern portion \nof St. John. Donnelly (1966) suggested that the Louisenhoj Formation was deposited \nunconformably on the Water Island Formation after a period of emergence, tilting and \nerosion, on the slopes and environs of a subaerial volcanic island located roughly \nbetween St. Thomas and St. John, an area now occupied by Pillsbury Sound. The \nyoungest layered deposits on St. Thomas are volcaniclastic rocks of the Tutu Formation. \nFossils contained in the Tutu Formation suggest that those deposits are of the Early \nCretaceous (Albain) Age (Donnelly et. al. 1971). It appears that all of the volcaniclastic \nrocks of St. Thom\n... [truncated, 2173 chars — for the full page use /api/corpus/document/EFTA00802602/40 or ?id=EFTA00802602&page=40]", "char_count": 2173}, {"efta_number": "EFTA00802602", "page_number": 41, "text_content": "GEOLOGY OF GREAT ST. JAMES \nThe island which lies off the eastern tip of St. Thomas is irregularly shaped, and has two \nfault lines running across the island. The island is comprised of 162 acres and rises to an \nelevation of 186 feet above sea level. The island is a part of the Water Island Formation \nthat was lain down in the Lower Cretaceous. The northern tip is tonalite, gabbro and \ngranite from the tertiary period, the north-western tip as well as the southeastern tip of the \nisland is basalt, and the southwestern tip is undivided, mostly keratophyra. The central \nportion of the island and the northeastern point is part of the Louisenhoj Formation. The \nshorelines are a combination of sandy beach, cobble beach and shear rocky cliffs. There \nare 6 salt ponds on the island. \nSOILS OF THE PROJECT SITE \nThe Custom Soil Survey of the Unites State Virgin Islands has classified 6 soil types on \nthe islands of Great St. James. Cinnamon Bay gravelly loam (CgC), 5 to 12 percent \nslopes, occasionally flooded is usually found on alluvial fans and terraces adjacent to \nvolcanic uplands. It has a surface layer which is 0 to 5 inches deep that is a very dark \ngrayish brown gravelly loam, the subsurface is 5 to 10 inches deep and is a dark brown \ngravelly loam. Redhook extremely stony sand (RdB), 0 to 5 percent slopes, rubbly, \nrarely flooded is usually found on coast beaches that are composed of calcareous sand. It \nhas a surface layer 0 to 7 inches deep of dark brown extremely stony sand, underlain with \n7 to 10 inches of brown very stony and 10 to 16 inches of very pale brown very gravelly \nsand below which is 16 to 60 inches of white very gravelly sand. Salt flats ponded \n(SaA) consist of area of unvegetated saline flats, saline marshes and salt ponds. The soils \nare very deep and poorly drained, strongly saline and frequently ponded for very long \nperiods. Southgate-Rock outcrop complex (SrE), 20 to 40 percent slopes is found on \nthe summits and side slopes of volcanic hi\n... [truncated, 2819 chars — for the full page use /api/corpus/document/EFTA00802602/41 or ?id=EFTA00802602&page=41]", "char_count": 2819}, {"efta_number": "EFTA00802602", "page_number": 42, "text_content": "CuSICX,  SW Resource Repal \nSO, Map \nNX-TE \nSeSt \nlEfrtf \nat. \nI \nI \nI \nI \nI \nI \nI \nI \nKOS \nNola \nI 72000.0.008080'•000 \nl \ne \na \na \na \n0 \n110 \nA.. \nKO m \nNW \n20 \n41•5 \nWegoOSII MOSKINK ONINFSIIS IONS INISIManallemOrm \nFigure 6.02.1 Custom Soils map of the project area (USGS Custom Soil Survey \n(https://websoilsurvey.sc.egov.usda.gov/App/WebSoilSurvey.aspx) \nHISTORIC USE \nThe archeological survey found no evidence of prehistoric habitation. There are no \nstructures shown on the island before 1760 on any of the historic maps. The island is \nreported to have been under cultivation since the 1760. Around 1770, a cotton plantation \nwas established and cotton was cultivated until approximately 1815. Great St. James was \ncontinuous occupied between 1760 and 1911. Today there is a house and complex \nlocated off the northern bay which is often referred to as Shallow Bay \nADVERSE SITE CONDITIONS \nThe island is protected by its location between St. Thomas and St. John and the \nsurrounding cays. The northern temporary barge landing is protected by the other cays to \nthe north, and St. Thomas and St. John to the west and east. Waves do attenuate in \nPillsbury Sound and the area can be effected by large seas and swells. However, there \nare no offshore structures other than the buoys and barges using the site should be \nmoored no more than a couple of hours. \nUnder normal sea conditions the Christmas Cove Dock and the Southeastern Dock/Barge \nLanding are well protected by their locations in relation to the prevailing seas which are \n21 \nEFTA00802644\n", "char_count": 1562}, {"efta_number": "EFTA00802602", "page_number": 43, "text_content": "usually from the east, southeast or northeast. During storms and during some periods of \nthe winter, seas can approach from the southwest. The Christmas Cove dock could be \neffected by waves approaching between 220° to 250' and the Southwest dock would be \neffected by waves coming from 210' to 240'. Waves occur from this direction primarily \nduring storm events. When seas become extremely rough or storms approach vessels \nwould be taken to more protected anchorages. \nAll three sites lie with area VE elevation 8ft where FEMA has determined that the 100-\nyear flood elevation with velocity will be 8ft as shown on FIRM maps 45 and 30 below. \n' ,wade 14.•••••• \nIMP SCALE V • 500' \n• \nPill \nVirgin \n780000 \nITS \nIslands \ngtnr-129 \n'014 glitatA3 \n'NW \nO \nNadia \nFIRM \nFLOOD NUANCE RATE IMP \nPLANDS \nPANEL 4 AWN \nat We AMA OCORRIAINIAIAVOR \nCOS \nea \na \na \n•••=1•••••••• \nOSP NURSER \n71111•X•15G \nPIP WOW \nANIL *NIT \nIran.' tans.\" •••••••••••A•••, \nFigure 6.02.2. FEMA FIRM Map Panel 45 of 94. \n22 \nEFTA00802645\n", "char_count": 1012}, {"efta_number": "EFTA00802602", "page_number": 44, "text_content": "Figure 6.02.3 FEMA FIRM Map Panel 30 of 94. \nThe U.S. Virgin Islands lie in one of the most earthquake prone areas of the world, and \nare susceptible to ground shaking, earthquake-induced ground failures, surface fault \nruptures and tsunamis (tidal waves) (Hays, 1984). The activity is mostly associated with \nlarge-scale tectonic activity or faulting, originating in the Anegada Trough to the \nnortheast of the islands. The trough and its related scarp apparently were thrown up by \nblock faulting during the late Pliocene or early Pleistocene. It is oriented generally \nnortheast to southwest, separating St. Croix from Puerto Rico and the other Virgin \nIslands. Based on shallow focus earthquakes, the Anegada Fault Trough is estimated to \nbe more than 400 miles in length. There are indications that strike slip movement is \noccurring, with St. Croix shifting northeast relative to Puerto Rico (Puerto Rico Water \nAuthority 1970). The year 2017 marks the 150th anniversary of the last major \nearthquake in the islands. This quake, which occurred on November 18, 1867 had an \nidentified intensity of VIII on the Modified Mercalli Scale. Earthquakes of this \nmagnitude have generally been associated with epicentral ground accelerations of \nbetween 0.05 and 0.35 gravities. Since the 1868 quake, there has been continuous low \nintensity activity, all below 6.0 Richter. Thousands of tiny earthquakes are encountered \nevery year on the island. \n23 \nEFTA00802646\n", "char_count": 1463}, {"efta_number": "EFTA00802602", "page_number": 45, "text_content": "IMPACT OF SITE GEOLOGY ON THE DOCK \nThe site geology will have little impact on the construction and placement of the \ntemporary barge landing. Both other docks will be impacted by the site geology which \nwill dictate how the pilings can be installed. It is probable that the pile in the pavement \nareas will have to be socketed. Once beyond the pavement a vibratory hammer can be \nutilized. \nIMPACT OF THE EXISTING DOCKS ON GEOLOGICAL RESOURCES \nNo dredging or filling is proposed, therefore there will be negligible impact on the \ngeology of the area. \n6.03 Drainage, Flooding, and Erosion Control \n6.03a Impacts of Terrestrial and Shoreline Erosion \nThe project includes the construction of 3 landing or access pads on cobble beaches \nbetween rocky headlands. These pads are all limited in size the largest being just over \n1000sqft. Due to the small size of these introduced impervious surfaces none should \nresult in any notable change in terrestrial runoff. Both docks are pile supported and in \nareas of rocky or cobble beaches. Neither dock site has sand deposition on the beach and \nthe cobbles found on both beach are moved by wave action rather than littoral transport. \nThe construction of the docks should not result in any shoreline erosion. \n6.03b Relationship of the Project to the Coastal Flood Plain \nAll three sites lie with area VE elevation 8ft. where FEMA has determined that the 100-\nyear flood elevation with velocity will be 8ft as shown on FIRM maps 45 and 30 \nprovided in Section 6.02. \n6.03c Presence and Location of any Critical Areas and Possible Trouble Spots \nThe island of Great St. James is within the Vessup Bay/ East End Red Hook Area of \nParticular Concern (APC) (Figure 5.01.1). The Vessup Bay/Red Hook APC is located on \nthe eastern end of St. Thomas and includes Nazareth, Muller, Vessup, Red Hook, Great \nBay, Cowpet Bay, Cabrita, Beck and Water Point, Great St. James, Little St, J, and Dog \nIsland. \n24 \nEFTA00802647\n", "char_count": 1960}, {"efta_number": "EFTA00802602", "page_number": 46, "text_content": "Figure 5.01.1 Areas of Particular Conem (STEER (2011) St. Thomas East End Reserve \nManagement Plan. St. Thomas, USVI. \nThe island also lies within the St. Thomas East End Reverse (STEER). STEER was \ndeveloped to help protect coastal resources including seagrass beds and coral reef \ncommunities. The island of Great St. James is in area C of the reserve and is referred to \nas St. James (Figure 5.01.2). \n25 \nEFTA00802648\n", "char_count": 422}, {"efta_number": "EFTA00802602", "page_number": 47, "text_content": "It\nThe Living Ocean* \nBenthk Habaat (2001) \nU.S., dente! asagrass \nBare bedrolt pavement \nS \nMeatettraea re.4\nBedrock. ashy 4 calwacvs aeon \nBatas \nDares 0ogontans an bodied' \nSand \nSand ow akpae \nReeve \n\" boa/Om latest \ne t. Sande( cataweous \nlaangtores \nc''' gnaw) ainto \nA War Atingtoma Lagoon \nCON4/4i fins1 aM \nFretneer ncvxl / \nDiceots on penned \nSand at warm poop:sans 0 \nB Ca COIF \"Mg OVII Lagoon \n&Sal boa). \nLio() Sapp \nis: S00144 Cal. a SP SO WAX \n S0ataa 000:0001 \nCC: St JIM, \nMSS dry shrutia-cl \nSan ftx Sae road\n! t • Sawn w \nto\ne a • doors \na, Tuff aayears kliapara CD ens , . P011840 pad\n0 3 \n0 25 \n0 \nMA.,\nMarina \nDonee mauve I. encasing \nNatural Resource Inventory \nSt T hornaa East End Reserve Committer,\nDecember 4. 2008 \nRM I GUI \nAMbefil WISP Ovally \nw  110^6ani) SSW)), RCP) Vegetation Cover \nSore 8 (;),C•aahl \nSt Thicket scrub \nBeach \nRock pavement \nFigure 5.01.2 STEER boundaries. (STEER (2011) St. Thomas East End Reserve \nManagement Plan. St. Thomas, USVI. \n26 \nEFTA00802649\n", "char_count": 1004}, {"efta_number": "EFTA00802602", "page_number": 48, "text_content": "The regulations for the St. James are as follows: \nSt. lames \nMarine \nReserve and \nWildlife \nSanctuary \nSubchapter \n96, Section \n96-3 \nProhibited Activities within the St. James MRWS: \n• It is unlawful to remove any marine or other wildlife without \na permit or specific authorization from the Commissioner \nSubchapter \nPermitted Activities within the St. James MRWS: \n96, Section \n964 \nActs permitted, provided a permit is first obtained from the \nCommissioner: \n• Scientific collecting in support of and for use in a research \nproject with an approved protocol \n• The use of castnet with a minimum square mesh size of X \ninch to capture baldish (fry) within 50 feet of the shoreline, \nexcept for Cow and Calf rocks \n• Fishing with hook and line \nThe marine habitats around Great St. James have abundant coral and seagrass resources. \nThere are numerous ESA listed corals species near the proposed dock locations. \nAcropora palmata, Acropora. cervicornis, Orbicella amzularis, Orbicella franksi and \nOrbicella faveolata as well as Dendrogyra cylindrus are found off all the beach from \nwhich the proposed docks and barge landings are planned. At the northern temporary \nbarge landing site, these corals are located primarily to the west in an area of coral \nboulders and coral rubble. However, there are several small A. palmata and several 0. \nannularis located on the shoreline cobble which extends out to a depth of 6.5ft. The \npresence of these species as well as several non-ESA listed Porites astreoides has \ndictated the location of the ramp. The proposed temporary barge landing position avoids \nall coral and seagrass resources. \nLocation of the western dock has a cobble beach between two areas of emergent bedrock \nand boulders. A. palmata occur on the emergent bedrock to the north. Offshore the \nseafloor quickly gives way to exposed pavement. There is a long linear depression right \noffshore and an old piling lies within this area. The fractured pavement then extends to \napproximate\n... [truncated, 2790 chars — for the full page use /api/corpus/document/EFTA00802602/48 or ?id=EFTA00802602&page=48]", "char_count": 2790}, {"efta_number": "EFTA00802602", "page_number": 49, "text_content": "The southern dock also extends from a cobble beach which gives way to rock pavement \nand has emergent bedrock and boulders on either side of the beach. There are Acropora \ncolonies to the east and farther to the south on the bedrock and boulders. There are \nOrbicella and Dendrogyra within the embayment and their locations have dictated the \nlocation of the dock. The dock avoids all ESA listed corals but will require the relocation \nof approximately 75 corals. \nThis southern dock will include a combination wave attenuator and reef building system. \nA mitigation plan has been prepared and is found in Appendix B. \nBecause of the rock occurring in the area, some of the pilings may require socketing and \nif this is required special water quality measures will be taken. If at all possible a vibra-\nhammer will be used to drive the piles. A water quality monitoring program has been \nproposed and the plan is found in Appendix C. \nThe area is known habitat to protect sea turtles and marine mammals and as such \nNOAA's Sea Turtle and Smalltooth Sawfish Construction Conditions will be followed as \nwell as NOAA's Vessel Strike Avoidance Measures and Reporting for Mariners. \nThe property contains 6 salt ponds. The wetland around the salt ponds have been \ndelineated and the delineations were approved by the U.S. ACOE during a previous \napplication for development of the island. This delineation is more than 5 years old, but \nno wetland disturbance will occur as a result of this project. \nThe island is known to be habitat to the St. Thomas Tree Boa that is a listed rare and \nendangered species. The boa as well as another species of snake have been seen during \nthe field studies. There will be special corridors and preservation areas set aside on the \nisland for these species. The access ways to the western and southern docks already \nexist, but the branch that will need to be developed to the temporary barge landing will be \ncleared by hand to limit impacts to the tree boas. A tree \n... [truncated, 2645 chars — for the full page use /api/corpus/document/EFTA00802602/49 or ?id=EFTA00802602&page=49]", "char_count": 2645}, {"efta_number": "EFTA00802602", "page_number": 50, "text_content": "A temporary barge landing is being proposed on the northwestern facing embayment. \nThe barge landing can be quickly constructed and utilized while the combination \ndock/barge landing on the southeastern side of the island is constructed. This site is to \nthe west of the sand pond and its associated wetlands. The landing includes a shoreline \nramp which is 25ft wide and 40ft in length extends to the Mean Water Line (MWL). \nTwo bollards will be placed to either side of the ramp and two moorings will be installed \n75ft offshore on either side of the ramp in just over 7ft of water depth. This will allow \nbarges to moor rather than to use their props to stay in place and will minimize bottom \ndisturbance. The moorings will be installed using helix anchors and will use floating lines \nas to not disturb the seafloor when not in use. The landing area is free of coral \ncolonization and just offshore there is very sparse seagrass colonization. \nThe western dock is proposed on the northern end of Christmas Cove. Historically there \nwas a dock in this location and there are still old concrete piles lying in the shallows of \nthis site. The proposed dock will be 10ft in width and 195ft in length extending 187ft \nfrom MLW and 193ft from mean high water (MHW). The dock will connect to an access \nslab which is 12ft xl2ft and the slab will be 2ft thick. All the ESA listed coral species \nwithin the area were located with GPS and the dock footprint avoids the ESA listed \nspecies. The dock extends beyond the nearshore hardbottom out to a depth of 15ft into \nan area of uncolonized sand to allow for safe dockage for deeper vessels and minimum \nimpact by vessels to the seafloor. The dock will require thirty-six 12in diameter piles. \nThe southern dock is located off the point closest to Little St. James. The ESA corals \nwere located by GPS and survey and the dock was designed to avoid these coral species. \nThe dock is \"L\" shaped and is 20ft wide (to allow for barge landing) and 150ft in len\n... [truncated, 3412 chars — for the full page use /api/corpus/document/EFTA00802602/50 or ?id=EFTA00802602&page=50]", "char_count": 3412}, {"efta_number": "EFTA00802602", "page_number": 51, "text_content": "ft and the spring tidal ranges reach up to 1.3ft (IRF 1977). There are no notable locally \ndriven tidal currents due to the lack of confinement within the area. NOAA has a tide \ngauge in Charlotte Amalie which is a southern exposure which has been recording water \nlevels since 1975. The high tide recorded on September 18, 1989 (Hurricane Hugo) was \n+3.35ft, and in 1995 during Hurricane Marilyn the Charlotte Amalie tide station recorded \nthe highest tide height 3.98ft above Mean Lower Low Water (MLLW). The lowest tide \nrecorded was on February 6, 1985 and was -1.44ft. The tidal ranges of the Charlotte \nAmalie station are as follows: \nMean Higher High Water 1.09ft \nMean High Water \n0.94ft \nMean Tide Level \n0.54ft \nMean Sea Level \n0.52ft \nMean Low Water \n0.13ft \nMean Lower Low Water \n0.0ft \nThere is also a Tide Station in Lameshure Bay, St. John (Station ID: 9751381), the station \nis located at latitude 18° 19.0' N and longitude 64° 43.4' W and has a mean tidal range of \n0.72 ft and a diurnal range of 0.82 ft. \nMaw/NOS/CO-CPS \nPredicted Water Level Plot \n9751381 Lameshur Bay, St. John, VI \nfrom 2011/04/13 - 2011/04/14 \n0.800 \n• 0 700 \n• \n0.600 \n▪ 0.500 \n,r,\n\" 0400 \nL 0..300 \n1 0.100 \nL.1.- 0.000 \na \n04/13 \n04/13 \n04/13 \n04/14 \n04/14 \n04/14 \n04/15 \nros \n00 00 \n08:00 \n16:00 \n00:00 \n08:00 \n16:00 \n00 00 \nDate/Time (GMT) \nPredicted BL — \nFigure 6.05.1. Tidal data from the Lameshure Tidal Station (NOAA Buoys) \nThe surface currents throughout the Caribbean are driven by the North Equatorial Current \nthat runs through the islands west-northwest and then joins the Gulf. These currents \nchange very little from season to season with the currents coming more from the south \nduring the summer months. Because of the shallowness of the Caribbean basin of less \nthan 1000m, mainly surface water from the Atlantic flows through the islands. The \nwesterly drift of the Caribbean Current sweeps into Pillsbury Sound from the Southeast, \nseeking a way North through the bather set up by the Ca\n... [truncated, 2310 chars — for the full page use /api/corpus/document/EFTA00802602/51 or ?id=EFTA00802602&page=51]", "char_count": 2310}, {"efta_number": "EFTA00802602", "page_number": 52, "text_content": "current running between Great St. James and Little St. James and through Current Cut. \n6.05C WAVES \nThe deep-water waves off Great St. James are primarily driven by the northeast trade \nwinds that blow most of the year (Figure 6.05.1). Waves average from 1 to 3ft from the \neast, 42% of the time throughout the year (IRF, 1977). For 0.6% of the time easterly \nwaves reach 12ft in height. The southeasterly swell with waves one to twelve feet high \nbecome significant in late summer and fall when the trade winds blow from the east or \nwhen tropical storms and hurricanes pass the islands at a distance to the south. During \nthe winter months, long length, long period northern swells develop to a height of 1 to 5 \nfeet. The USACE Hindcast Studies for buoys 61022 and 61025, the two buoys whose \nwaves patterns directly affect the island, show that a majority of the waves which \noccurred approach from easterly directions. \n6.05D MARINE WATER QUALITY \nThe dock locations all have excellent water quality. During baseline studies for the dock \nconstruction on Little St. James, baseline samples taken between Little St. James and \nGreat St. James found turbidities to range from 0.27 NTU to 1.17 NTU under normal sea \nconditions. Samples taken those previous studies are shown below. \nDATE \nTURBIDITY \nTURBIDITY \nTURBIDITY \nTURBIDITY \nNORTH \nEAST \nSOUTH \nWEST \n10/06/03 \n0.67 \n0.56 \n0.73 \n0.54 \n10/17/03 \n0.44 \n0.74 \n0.67 \n0.37 \n10/24/03 \n0.65 \n0.71 \n0.87 \n0.47 \n2/6/04 \n0.54 \n0.36 \n0.74 \n0.85 \n2/14/04 \n0.64 \n0.86 \n0.78 \n0.34 \n2/17/04 \n0.85 \n0.76 \n0.56 \n0.65 \n12/28/04 \n0.45 \n0.78 \n0.67 \n0.54 \n1/12/05 \n0.76 \n0.87 \n0.34 \n0.56 \n2/15/05 \n0.56 \n0.67 \n0.58 \n0.75 \n4/30/05 \n0.32 \n0.45 \n0.71 \n0.60 \n10/12/05 \n0.56 \n0.72 \n0.39 \n0.61 \n10/15/05 \n0.63 \n0.58 \n0.79 \n0.83 \n32 \nEFTA00802654\n", "char_count": 1779}, {"efta_number": "EFTA00802602", "page_number": 53, "text_content": "Turbidty measurements (NTU) during studies for this project as as follows \nDate/Location Temporary Barge Landing West Dock Southeast Dock \n3/20/2016 \n0.91 \n0.88 \n0.75 \n4/15/2016 \n0.57 \n0.71 \n0.71 \n6/1/2016 \n0.49 \n0.91 \n0.87 \n6/27/2016 \n0.80 \n0.54 \n0.66 \n7/11/2016 \n0.76 \n0.76 \n0.61 \n8/2/2016 \n0.93 \n0.79 \n0.87 \n8/23/2016 \n0.62 \n0.82 \n0.68 \n9/3/2016 \n0.63 \n0.75 \n0.74 \nThe offshore waters are classified as Class B and the best usage of the water is listed as \nthe propagation of desirable species of marine life and for primary contact recreation \n(swimming, water skiing, etc.). The quality criteria include, dissolved oxygen not less \nthan 5.5mg/1 from other than natural conditions. The pH must not vary by more than 0.1 \npH unit from ambient; at no time, shall the pH be less than 7.0 or greater than 8.3. \nBacteria (fecal coliform) cannot exceed 70 per ml, and turbidity should not exceed a \nmaximum nephelometric turbidity unit of three (3) NTU. \nIMPACT OF PROPOSED PROJECT \nThe temporary barge landing and docks will replace the use of the landing and dock in \nShallow Bay. Both frequently result in the suspension of sediment from the seafloor. \nThe upland construction associated with the docks and landing are minor and with proper \nsiltation control should not result in any impact to marine water quality. The placement \nof pilings will probably require socketing and could impact water quality. A double set \nof seafloor length turbidity barriers will be required and all corals will be relocated out \nthe barrier footprints. Barriers must be maintained until such time the interior water \nquality is acceptable. If properly implemented and monitored the socketing should have \nonly a very short-term limited impact on water quality. A Water Quality Monitoring Plan \nis proposed and is found in Appendix C. Once constructed, the docks and landing will \nhave negligible impact on water quality. The docking areas are all deep enough that there \nshould not be an issue with propwash. \nThe \n... [truncated, 2433 chars — for the full page use /api/corpus/document/EFTA00802602/53 or ?id=EFTA00802602&page=53]", "char_count": 2433}, {"efta_number": "EFTA00802602", "page_number": 54, "text_content": "/ \nMOP \n4. \n0' \n1r \n1:4' -Iilt.\";\n-: - \n\"ii-. - M -N,\nI- v. •-•Y- .9- ---9 --... -w- •-w- . v- `ac -it- `i: ' 14:-. Alt- \nA \nt\\ t, .., \ni \n.4(-)Slfe-- \n-l'-00\n1.1 \nI -V- \n- \n01\n.:4C.\"1\\;% -W- •44- \n- \n‘4C -11- \n•-•4- \nNA, \ntb \nale \n \n-4/ \nII\nANNUAL PREVAILING CURRENTS \n—J \nFame 3. \nAnnual °tweak,. caroms in the Coritown. From US. Pia* Oceanographic Ollae.S.WireeDlocriona. 1063. \nFigure 6.05.1. Prevailing currents in the Caribbean, IRF 1975. \nSion& anl WA* Hatt weh Wwe Direction \n1:1Foe Ace07.201 le 00 OW \nIf tity \n \n\"1/4,,Attantsi \n.fres'ishs. aPse. \nWW \nIOW \nothaanweratherene \n70W \n0.0600 ,aa.I M•0100000 \na \nI \n2 \n3 \n4 6 \n0 \na \n0 0 II II \nlieriaam 00000 000000 \n34 \nN \nNN \n24N \n60 W \nWW \n_e.., \nMonne \nN \nEFTA00802656\n", "char_count": 727}, {"efta_number": "EFTA00802602", "page_number": 55, "text_content": "Duck 4. \nS \nFri., I V \n4u \nlOw \n65 w \neseeary x.- -yeker \nSOW \nAfu \noceverierhe tic \nIrks. W.. nein 14•0 \nFigure 6.05.2. Currents in the Caribbean April 2011 and January 2017. \nCOSI \n10.3 lawn _6'52' \nbare acOula \nDank, \nknglosh \nAn \nan dyke \n2C, glil e, \n.^ \n'flan \nDodo 00 \naz,\nff.?.\n. \ne V.) \nit \n/ \ngot& \n. \nbeef \nc3 eyes le lit..\n+tv.. \nI \n• \nD.arttcyl, ..4)\\‘ ,!\n-\n00..3;13 5;2; 4.“\n/ \nrf\nMien:3,n e\n• I r encixair \n/ 4\" \n; barracuda \nJANUARY \nvirgin \nislands \nFigure 6.05.3 Prevailing currents off St. John, IRF 1975. \n35 \nEFTA00802657\n", "char_count": 543}, {"efta_number": "EFTA00802602", "page_number": 56, "text_content": "••••,•••=••S \nSas \nin Id' \n••••••=. \nWON NM \natm \n•-• \n=e-\nm \n••••••••••••••• \nN.M. 1St \nlams \n9.• \n•••••••••• \n!Mee ••• \n•••• \n\"...-4._,„2„.1 -.\n\"'\" \n• \nobey.. omen \n• \n•• \n_.••••••••••.-_\na•\n \n.immali \n- -ark—\n. \nI \n• \nFigure 6.05.4. Wave Roses from the USACE Wave Information Studies for buoy 61022. \n36 \nEFTA00802658\n", "char_count": 321}, {"efta_number": "EFTA00802602", "page_number": 57, "text_content": "6.06 MARINE RESOURSES \nBenthic Habitat Description \nGeneral \nSandy beaches, cobble beaches and steep rocky shorelines surround great St. James \nIsland. All three of the proposed dock and barge landing sites will extend from cobble \nbeaches. The northern shore where the temporary barge landing is proposed has cobble \nwhich extends down to a depth of approximately 7ft and has sparse seagrass colonization \nwithin the barge approach. There are scattered corals in the bay to the east and dense \nseagrasses offshore beyond the landing site. The cobble within the landing site is only \ncolonized by fire coral. The emergent bed rock to both the east and west sides of the bay \nare colonized by corals species including ESA corals. \nThe northern portion of Christmas Cove where the Access Dock is located has emergent \nbedrock to either side of the small embayment which are colonized by coral and sponge \nspecies. Rock pavement and scattered boulders extends offshore to a depth of 11.5ft \nwhere it gives way to a sandy bottom. Corals and sponges colonize the rock pavement \nand scattered boulders. There is seagrass off shore but it begins beyond the terminus of \nthe proposed dock. \nThe southern facing dock is off a cobble beach between to rocky shorelines. There is \nrock pavement extending off shore and then broken rock pavement further out. Corals \nand sponges colonized the rock pavement. \nESA listed coral species are found at all three locations and the Nassau Grouper \n(Epinephelus striatus) was seen off both the Christmas Cove and southern dock site. \nMethods \nThe NOS St. John and St. Thomas Habitat map Tile 16 (Figure 6.06.1) of the Great St. \nJames area shows the colonized rock pavement and bedrock as well as the offshore \nseagrass beds. The seagrass beds are not as continuous near the shoreline as shown, and \nthe offshore area at both Christmas Cove and the southern dock site are colonized \npavement rather than bedrock right off the cobble beaches and on the northern facing \nbe\n... [truncated, 2476 chars — for the full page use /api/corpus/document/EFTA00802602/57 or ?id=EFTA00802602&page=57]", "char_count": 2476}, {"efta_number": "EFTA00802602", "page_number": 58, "text_content": "IMMO \n1=•+••.n.• \n....... \nMg ••••\n•.••••••• \n/\n...\n4i.\n.. \n0.••••••1% \nhemaleh \n........t........ \nle mmr... \ns....e•a• \n...,.............. \nmom, \n•••••••••• \n=la \nsismoression \nM.... \n• \nFigure 6.06.1 NOAA Benthic Habitat Map \nBenthic Resources \nGreat St. James is located off Water Point on the eastern end of St. Thomas. This oddly \nshaped island has a variety of shoreline types and six salt pond/wetland habitats. There is \na well-protected shallow northern bay where an existing dock is located. Shallow Bay is \ncolonized by seagrass which includes Thalassia testudinum, Syringodiutn filzforme and \nHalodule wrightii. Recently the sea vine Halophila stipulacea has colonized areas which \nhave been disturbed. The densest seagrass beds once lay near shore and to the east of the \ndock. Over the last several years these beds have been highly disturbed. The peninsula to \nthe east of this point is surrounded by rocky headlands and is a very exposed \nenvironment. The rocky cliffs extend below the sea surface and due to the intense wave \naction, the shallowest areas are not colonized. By a depth of 80-10ft the rocky substrate \nbecomes colonized by a wide variety of corals and sponges. The slope is steep offshore \nand the water reaches a depth of 40ft to 50ft relatively close to shore. The rocky slope \ngives way to a cobble then sand bottom and there are sparse to moderately dense seagrass \nbeds that extend seaward. The rocky shoreline continues around to the south, with coral \ncolonized nearshore hardbottom and seagrass colonized sand and cobble further offshore. \nThere are two cobble beaches further to the south divided by a small rocky headland, \nthere is some colonized beach rock nearshore and shallow seagrass beds off shore. The \nshoreline facing St. James Cut and the southern end of the island is rocky. This area has \nlimited coral colonization in the inner tidal zone giving way to an abundant diverse coral \ncommunity on the submerged rocky slopes. The rock is relatively\n... [truncated, 2388 chars — for the full page use /api/corpus/document/EFTA00802602/58 or ?id=EFTA00802602&page=58]", "char_count": 2388}, {"efta_number": "EFTA00802602", "page_number": 59, "text_content": "diversity increasing with depth. The western shoreline is well protected and is a \ncombination of rock and sandy beach. The water deepens much more gradually on this \nside of the island. In the areas with rock along the shoreline are colonized by corals and \nsponges. The less colonized inner tidal area is much less defined here due to the more \nprotected nature of the site. Within Christmas Cove there is a rock groin like structure \nthat extends into the bay near the center of the embayment. Offshore to the north of the \ngroin there is a small beach rock shelf and then a strip of uncolonized sand before sparse \nto moderately dense seagrass beds begin. The site is currently used by boats anchoring \nadjacent to the beach. \nTo the south of the groin there is a beach rock shelf with moderate coral colonization \nwhich falls off to depth of over 6ft only 40ft from shore and there is a board area of \nuncolonized sand out to a depth of 10ft before reaching the moderately dense seagrass \nbeds and open sandy plains. The shoreline becomes rocky again to the north along \nCurrent Cut and the area is more subject to wave and current action. There is coral \ncolonization along the rocky shoreline and on the rock pavement that extends off shore. \nThe north-facing bay to the east of Current Cut is a mixture of cobble and rocky shoreline \nwith a small sandy beach in front of the salt pond. Where rock is present there is coral \ncolonization and in the open sandy areas there is moderate to dense seagrass colonization. \nThe temporary barge landing is located at the western end of the north-west bay. The \nlanding. The beach is cobble and the cobbles extend out to a depth of 7ft at the landing \nsite. The landing site contains some scattered Millepora cornplanata, but no hard-coral \nspecies. There are scattered corals to the east in the cobble including a few Orbicella \nannularis and Acropora painrata. Porites astreoides is the most abundant coral in the \ncobble to the east. The location fo\n... [truncated, 2582 chars — for the full page use /api/corpus/document/EFTA00802602/59 or ?id=EFTA00802602&page=59]", "char_count": 2582}, {"efta_number": "EFTA00802602", "page_number": 60, "text_content": "Northern site \nSubstrates \nGcx-)sle earth \n400 ft \nLegend \nCobble \no \nbeacck \n7 sand \nA \nFigure 6.06.2. Benthic habitats at the barge landing. \nobble in footprint of barge mooring site \neagrass offshore well beyond the cobble \n41 \nEFTA00802662\n", "char_count": 244}, {"efta_number": "EFTA00802602", "page_number": 61, "text_content": "approach \nSparse seagrass in the immediate barge \nThe access dock in Christmas Cove is near the location of an old historic dock. The beach \nis a mixture of sand and cobble. There is rock pavement extending offshore and there is \nan area of cobbles in the center of this area which is uncolonized out to a depth of 5ft. \nThe rock pavement has various depressions and breaks and within one of these \ndepression is a pile from the old concrete dock. Beyond the depression, the water deepens \nquickly out to a depth of 12ft. The rock pavement is colonized by Diplona strigosa, D. \nlabyrinthifonnis, Orbicella annularis, 0. franksi, Porites astreoides, P. porites, \nDendrogyra cylindrus, Gorgonia sp. and Millepora sp. and the sponges Aplysinafidva, \nAmphimedon compressa and Ircinia sp. Coral colonization increases on either end of the \nsmall embayment and with depth. Beyond the nearshore hard bottom, approximately \n120ft off shore the bottom becomes sandy. There is a minimally colonized area before the \nbottom begins to become colonized by Syringodiztmfilifonne which slowly grades into a \nmixed bed of Thalassia testitudium and Syringodium. The exotic seavine Halophila \nstipulacea is also present. This seavine was not present in 2006. \nThere was a very large intact Acropora cerviconzis in the center of the bay just off the old \ndock piling in the depression early in 2016. However, a boat moored on the old piling \nand on a subsequent dive the Acropora was found completely broken. Pieces of this \nAcropora remain. There are Acropora palmata in the shallows to the north of the \nproposed dock location both on the cobble and bedrock. \n42 \nEFTA00802663\n", "char_count": 1660}, {"efta_number": "EFTA00802602", "page_number": 62, "text_content": "The bottom formation is dead visible this •hoto• a h. \nFi tire 6.06.3 Benthic Habitats Christmas Cove \nobble with minimal colonization \n43 \nEFTA00802664\n", "char_count": 153}, {"efta_number": "EFTA00802602", "page_number": 63, "text_content": "Sand beyond colonized pavement \n Old piling \nShallow Acropora \nBroken A. cerviconzis \nThe Access Docic/Barge dock is located in the bay closest to Little St. James. Like the \nother two bays there is cobble on the shoreline which extends into the sea to 2ft to 4ft of \nwater depth. Offshore there is pavement with boulders and odd rock formation. The area \nis colonized by scattered corals which are most abundant on the boulders. Orbicella \nannulans, O. franksi, O. faveolata, Dendrogyra cylindrus, Porites astreoides, P. porites, \nDiplona strigosa, D. clivosa. D labyrinthifonnis Gorgonia sp. and Millepora sp. and \nsponges Aplysina fulva, Amphimedon compressa and Ircinia sp. are present. Acropora \npalmata is present on the headlands to the east and south. \nThere are scattered boulders and broken pieces of bedrock offshore, most of which are \ncolonized by corals and sponge species. \n44 \nEFTA00802665\n", "char_count": 906}, {"efta_number": "EFTA00802602", "page_number": 64, "text_content": "4.\nOIMMISPIN \nAIWA a DOCK \nPAST MOM • \nTOP Of D0O< \n411MASI. \nDID of co« \n141' FROM MIW \n144' FROM WIN \n• \n'I.( \nPM \n4•PliMr \nYAP \n• \nMa WM MI1 \n.4 \nFigure 6.06.4. All of the ESA corals in the bay were mapped by the surveyor in order to \navoid them with the dock design. \n6.06.5 Benthic Habitats in the southeastern embayment \n45 \nEFTA00802666\n", "char_count": 344}, {"efta_number": "EFTA00802602", "page_number": 65, "text_content": "Impact of Construction \nThe temporary barge landing has minimal in-water disturbance. The landing pad is \nlandward of MHW and only two moorings will be placed offshore. Moorings will be \nplaced with helix anchors and will utilize floating lines to minimize impact to the \nseafloor. There is very sparse Syringodiwn coverage in the immediate approach and the \ninstallation of the anchors should have a negligible impact. The barge will come into the \nlanding tie up to the bollards and pick up the moorings and cut off its engines to \nminimize impact. The end of the barge will be in 7ft of water at the edge of the cobble \nwhere the sand is uncolonized. By not using is engines to maintain position on shore the \nimpact to the seafloor and water quality should be minimal. The barge will not be in \nplace long enough to have a shading impact on the seafloor. \nThere are approximately 75 corals in the footprint of the Christmas Cove Dock and its \nimmediate impact area. The corals will be relocated to the hardbottom areas to the north \nprior to any construction. A Coral Relocation and Transplant Plan is found in Appendix \nB. The Christmas Cove dock will require thirty-six 12in pilings. It is probable that a \nleast V2 of those will require socketing. Double turbidity barriers will be deployed and \nwater quality monitored will be conducted during all in water work. Turbidity barriers \nwill not be opened or removed until interior water quality has settled to acceptable levels. \nAll corals will be relocated out of the area enclosed by the curtains so that they will not \nbe impacted by settling sediment. Turbidity barriers will be removed or secured when \nnot in use to limit impact to the surrounding benthos. If turbidity control is properly \nmaintained and monitored the impacts should be minimal. The dock has been designed \nto extend out into the uncolonized sand and terminate before reaching the dense \nThalassia and Syringodiwn beds offshore. The seavine Halophila stipulacea may now \n... [truncated, 3325 chars — for the full page use /api/corpus/document/EFTA00802602/65 or ?id=EFTA00802602&page=65]", "char_count": 3325}, {"efta_number": "EFTA00802602", "page_number": 66, "text_content": "6.07 Terrestrial Resources \nThe application is for the development of a temporary barge landing and two docks. All \nthree structures have access pads or landing pads which will be constructed on cobble \nbeaches which are unvegetated. The access ways to both the Christmas Cove beach and \nsoutheastern dock already exist and will not require additional clearing. Approximately \n175' of access way must be cleared in order to access the temporary barge landing. \nFlora \nThe island is a harsh dry windswept environment that supports a large variety of thorny \nspecies. There are 6 wetlands, two of the wetlands are salt ponds surrounded by \nmonocultures of black mangroves (Avicenna genninans) and two of the wetlands are salt \nponds surrounded by buttonwood mangroves (Conocarpus erectus). One of the wetlands \nis more depressional and is surrounded by manchineel (Hippomane manchineel). A plant \nspecies list follows which provides the general location for each of the species \nencountered during detailed terrestrial surveys in 2005 and 2006. Additional terrestrial \nsurveys were made in 2016, and while a notable amount of additional clearing had been \ndone the species on the island remain the same. Many of the plants were found in more \nthan one habitat. The plant communities can be divided into those on the most exposed \nareas of the coastline, the beach community, the wetland communities, the windward \nvegetation and the less exposed portions of the site. There is also a small landscaped area \nfrom around the existing buildings on the site. \nThe locally listed rare and endangered Maminalaria nivosa was noted on the exposed \nrocky cliffs within the exposed coastal vegetation. It was not as prevalent as Turks head \ncactus. Malpighia woodinuyanna, another locally listed rare and endangered plant may \nbe present but was not seen during the surveys. \nSPECIES \nBEACH \nWETLAND \nEXPOSE \nCOASTAL \nWINDWARD \nLESS \nEXPOSED \nLANDSCAPE \nAcacia tortuosa \nx \nx \nx \nx \nx \nAgave mission um \nx \nAmuse\n... [truncated, 2514 chars — for the full page use /api/corpus/document/EFTA00802602/66 or ?id=EFTA00802602&page=66]", "char_count": 2514}, {"efta_number": "EFTA00802602", "page_number": 67, "text_content": "aculeatum \nCoccotoba uvifera \nx \nx \nx \nCocoloba krugli \nx \nx \nCocoloba \nmicrostachya \nx \nX \nCocos nucifera \nx \nComocladle dodonaea \nx \nx \nx \nConocarpus erectus \nx \nx \nCrinum zeylanicum \nx \nCrossopetalum \nrhacoma \nx \nx \nCroton betulinus \nCroton discolor \nx \nx \nx \nx \nCuscuta americana \nx \nx \nDabet& \necastaphyllum \nx \nx \nDistichlis spicata \nx \n&Maks fruticosa \nx \nx \nEntwine \ncorallodendrum \nx \nEtythroxylum brevipes \nx \nx \nx \nEugenia cordata \nx \nx \nEuqenia rioustrina \nx \nx \nEuqenia sessilifiora \nx \nEuphorbia artcutata \nx \nx \nx \nEuphorbia \nmesembrianthemifolia \nx \nx \nx \nx \nGuapira /ratans \nx \nx \nx \nHeliotropium \ncurassaruium \nx \nHeteropteds purpurea \nHippomane \nmanchineei \nx \nx \nx \nIpomoea egoersii \nIpomoea pas caprae \nx \nJacquinia arborea \nx \nJacquinia berterii \nx \nx \nJatropha szossypifolia \nx \nx \nx \nKnigiodendron terreum \nx \nLantana camara \nx \nx \nx \nLantana invoucrata \nx \nx \nX \nX \nLeucaena leucocephala \nx \nx \nx \nx \nx \nMak:44Na linearis \nx \nx \nx \nMaktighia woodburyana \nMammilaria nivosa \nx \nMelocactus intonus \nx \nModnda citrifoli \nx \nx \n0plonia spinosa \nx \nx \nOpuntia dillenii \nx \nx \nx \nPictetia aculeata \nx \nx \nPilosocereus royenii \nx \nx \nx \nx \nPbonia subcordata \nx \nx \nx \nx \nPithecellobium unguis \ncall \nPlumeria alba \nx \nx \nx \nx \nPrestonia aggulatinata \nx \nx \nx \nPyschotria nervosa \nx \nRandia aculeata \nx \nx \nx \nx \nRochefartia \nacanthophora \nx \nSamyda dodecandra \nx \nScilosanthus versicolor \nx \nx \nSesuvium \nportulacastrum \nx \nx \nx \nx \nx \nSide rhombifolia \nx \nEFTA00802669\n", "char_count": 1488}, {"efta_number": "EFTA00802602", "page_number": 68, "text_content": "Solanum racemosum \nx \nx \nSporobols virginicus \nx \nSligmaphyllon \nemarginatum \nx \nx \nStigmaphyHon \npethocifolium \nx \nx \nx \nStigmaphyllon \nperiplocifolium \nx \nx \nx \nSurinam maritime \nx \nTabebuia heteephylla \nx \nx \nx \nThe \nsea \n!nee \nTillanctsia utriculata \nx \nx \n)\nfaN_,_\n___ \nx \nx \nTragic volubilis \nx \nx \nx \nUrechites lutes \nx \nFauna \nThe island has significant wildlife use. Deer, and goats were noted during the survey in \nthe dense bush in 2004 but only deer were noted in 2005 and 2006. Numerous mice \nand rats were noted on every visit and did not seem afraid of humans. No rats were noted \nin 2016. \nReptiles were abundant and tree anoles (Anolis cristatellus), grass anoles (Anolis \npulchellus), barred anoles (Anolis stratulus), dwarf geckos (Thecadactyhts sp), and \ncommon ground lizards (Sphaerodactylus macrolepis) were seen. Worm lizards \n(Amphisbaena fenestrata) have been reported but were not encountered. Puerto Rican \nracers (Alsophis portoricensis) were seen on every site visit including in 2016 and appear \nin the highest density around the salt ponds. The St. Thomas tree boa (Epicrates monensis \ngranti) is also present and two were seen during the surveys in May of 2006. One in the \nvegetation near the modem housing complex and one in the trees near Christmas Cove. \n6.08 Wetlands \nThe U.S. Army Corps of Engineers defines wetlands as \"those areas that are periodically \ninundated or saturated by surface or groundwater at a frequency and duration sufficient \nto support, and under normal circumstances do support, a prevalence of vegetation \ntypically adapted for life in saturated soil conditions. Wetlands generally include \nswamps, bogs, marshes and similar areas.\" (U.S. Army Corps of Engineers, 1986). \nIn March 2004 Amy Claire Dempsey of Bioimpact, Inc., delineated the wetlands on the \nisland of Great St. James in accordance to the 1987 Wetland Delineation Manual. \n49 \nEFTA00802670\n", "char_count": 1917}, {"efta_number": "EFTA00802602", "page_number": 69, "text_content": "Figure 6.08.1 The six salt ponds on Great St. James \nPOND 1 \nPond I is located on the northeastern point of the island. The pond is surrounded by \ncobbled beaches to the north and west and steep hillsides to the east. The southern \nside has the gentlest rise from the pond and has the greatest area of wetland outside the \narea that typically has standing water. Cobbles extend down into the pond on the two \nbeach sides and the cobbles have green stains. The pond has a monoculture of black \nmangroves, Aviennia genninans. \n50 \nEFTA00802671\n", "char_count": 542}, {"efta_number": "EFTA00802602", "page_number": 70, "text_content": "POND 2 \nPond 2 is located on the northwestern point of the island. The pond is surrounded by a \ncobble beach to the north and steep hill sides to the south, east and west. There is a \nrock wall build across the eastern corner of the pond. The pond is almost a monoculture \nof black mangrove, Aviennia germinal'. Only a few white mangroves, Laguncidaria \nracemosa were encountered along the shore side. This wetland is closest to the \ntemporary barge landing. The access roadway is 100' from the edge of this wetland. \n51 \nEFTA00802672\n", "char_count": 535}, {"efta_number": "EFTA00802602", "page_number": 71, "text_content": "POND 2 \nPOND 2 \nPOND 3 \nPond 3 is a depressional area off Christmas Cove on the western side of the island. It \nis located to the north of a larger salt pond. This wetland is primarily surrounded by \nmanchineel (Hippomane manchineel). It appears that this pond only occasionally holds \nwater. There is a lot of dead wood within this depression. \nPOND 4 \nPond 4 is located behind the cobble beach berm off Christmas Cove. The western side \nof the pond is bordered by a cobble beach and cobbles spill down into the pond. The \nnorthern, southern and eastern sides of the pond are bordered by steep hillsides. The \nwetland forms a narrow strip around the pond. The pond is a monoculture of \nbuttonwood mangroves, Conocarpus erectus. \n52 \nEFTA00802673\n", "char_count": 747}, {"efta_number": "EFTA00802602", "page_number": 72, "text_content": "POND 4 \nPOND 4 \nPOND 5 \nPond 5 is located on the eastern side of the island behind a cobble beach. Its eastern \nborder is a mixture of sand and cobble spilling over from the beach, and the northern, \nsouthern and western border are steep hillsides. The northern end of the pond has been \nfilled with coral rubble which was thrown over into the pond during stormd. The pond is \nsurrounded by buttonwood mangroves, Conocarpus erectus and the ground cover \nSesuvium portulacastrurn is present along the eastern side. \nPOND 5 \n53 \nEFTA00802674\n", "char_count": 540}, {"efta_number": "EFTA00802602", "page_number": 73, "text_content": "POND 5 \nPOND 6 \nPond 6 is located to the south of pond 5 on the other side of a knoll. It is fringed by the \nshoreline community on its eastern and northern sides. Steep hillsides surround the \npond to the south and west. White mangroves (Laguncularia racemosa) are the \ndominant species surrounding the pond. \nThe southeastern landing is closest to this pond. The access road already exist and its use \nwill not impact the wetland. \n6.09 RARE AND ENDANGERED SPECIES \nAll three rare or endangered sea turtle species; hawksbill turtles (Eretmochelys imbricata) \ngreen turtles (Chelonia mydas) and leatherback turtles (Ennochelys coriacea) occur in \nthe area but neither of the docks or landing sites are turtle nesting beaches. NOAA's Sea \nTurtle and Smalltooth Sawfish Construction Conditions will be followed as well as \nNOAA's Vessel Strike Avoidance Measures and Reporting for Mariners in order to \nprotect these species. Acoustic impacts are also a potential impact to sea turtle species \ntherefore a vibratory hammer will be used during construction to minimize this impact \nand if necessary pile will be socketed rather than impact driven. The use of an impact \nhammer is not proposed. \nThe marine habitats around Great St. James have abundant coral and seagrass resources. \nThere are numerous ESA listed corals species near the proposed dock locations. \n54 \nEFTA00802675\n", "char_count": 1378}, {"efta_number": "EFTA00802602", "page_number": 74, "text_content": "Acropora palmata, A. cerviconzis, Orbicella amzularis, O. franksi and 0. faveolata as \nwell as Dendrogyra cylindrus are found off all the cobble beaches from which the \nproposed docks and barge landings are proposed. At the northern temporary barge \nlanding site, these corals are located primarily to the east where there are coral boulders \nand coral rubble. There are few located on the shoreline cobble which extends out to a \ndepth of 6.5ft to 7ft. There are several small Acropora palmata and several Orbicella \nammlaris on the nearshore cobble and the presence of these species as well as several \nPorites astreoides dictated the location of the barge landing. The proposed temporary \nbarge landing position avoids all coral and the landing approach is over sparse seagrass. \nThe western dock location is off a cobble beach between to areas of emergent bedrock \nand boulders. Acropora palmata occur on the emergent bedrock to the north as well as \non the cobble. Offshore the seafloor quickly gives way to exposed pavement and there is \na long linear depression right offshore. An old piling lies within this area. The fractured \npavement then extends to a depth of approximately 11.5ft offshore over the next 130ft. \nThe area has some widely-scattered boulders and patchy coral colonization. There are \nscattered ESA corals including Orbicella and Dendrogyra. During the first survey, there \nwas a very large Acropora cerviconzis immediately seaward of where the old piling lay \nnear shore. However, upon the next visit by the island it was noted that an old boat was \ntied nearshore apparently attached to the old piling. During a dive several weeks later it \nwas noted that the boat was gone and the large A. cerviconzis had been badly broken. \nThe location of the ESA species has dictated the location of the dock. Approximately 75 \ncorals will require relocation to minimize impact but no listed corals will need relocation. \nThe southern dock also extends from a cobble beach which gives\n... [truncated, 3294 chars — for the full page use /api/corpus/document/EFTA00802602/74 or ?id=EFTA00802602&page=74]", "char_count": 3294}, {"efta_number": "EFTA00802602", "page_number": 75, "text_content": "contaminants, particulate matter emissions, volatile petroleum products, sulfur \ncompounds, and internal combustion engine exhaust (Virgin Islands Code Rules and \nRegulations). \nThere will be a slight increase in air emissions during the use of heavy equipment for pile \nsocketing/vibra-hammering. Once the docks are complete air quality will be impacted by \nthe periodic vessel visitations. The dock will have a negligible impact on air quality. \n7.00 IMPACTS ON THE HUMAN ENVIRONMENT \n7.01 Land and Water Use Plans \nThe property is zoned R-1, Residential Low density. The proposed structures are intended \nto provide access to the residence on the offshore cay. \n7.02 Visual Impact \nThe structures are proposed for the privately held offshore cay. The docks are all low \nprofile and will have turtle friendly solar lighting for visibility at night. Due to the locate \nof the cay the dock structures will only be visible from boats and from Little St. James. \n7.03 Impact on Public Services \n7.03a Water \nThere will be no water service to the docks or landing. \n7.03b Sewage Treatment and Disposal \nThere will no sewage associated with the docks or landing. \n7.03c Solid Waste Disposal \nThe docks and barge landing will not create solid waste. \n7.03d Roads, Traffic and Parking \nThe docks and landing are associated with an offshore cay and therefore have no impact \non roads, traffic or parking. \n7.03e Electricity \nThe docks and landing will use turtle friendly solar lighting. \n7.03f Schools \nThe construction of the 2 docks and landing will have no impact on schools. \n56 \nEFTA00802677\n", "char_count": 1591}, {"efta_number": "EFTA00802602", "page_number": 76, "text_content": "7.03g Fire and Police Protection \nThe development of the access docks and landing will improve fire department and \npolice access to the cay in the case of an emergency. \n7.03h Health \nThe construction of these features will not increase the use of the public health facilities. \nThe construction of these docks and the landing will make it easier for emergency health \ntransportation to and from the cay. \n7.04 Social Impacts \nThe construction of the docks and barge landing are proposed for a private offshore cay \nwith the intention to provide access to the owner and his staff. These activities on the \nprivately held island will not affect the islands of St. Thomas or St. John. \n7.05 Economic Impact \nThe private docks and landing are not revenue producing. The permitting of the \nstructures will result in the payment of submerge land fees by the applicant. \n7.06 Impacts on Historical and Archeological Resources \nThe proposed structures are in the shallow waters around Great St. James. Detailed \nsurveys were done as part of the benthic assessment. An old dislodged pile was noted \nnear the shoreline and one further offshore. These are being avoided due to coral \ncolonization. A request for a clearance letter has been sent to SHPO. A MOU is in place \nfor the upland portions of the island. \n7.07 Recreational Use \nPeople typically do not visit either the northern beach area or the southeastern dock site. \nThe Christmas Cove is however periodically visited by boaters and visitors who picnic on \nthe beach or walk on the shoreline. The docks will not interfere with public access to the \nshoreline and the public will continue to enjoy free egress within the 50' set back. \n7.08 Waste Disposal \nThe dock will not create solid waste, any trash from vessels will be disposed of in \nreceptacles on the island, and hauled off with the other trash. The temporary barge \nlanding and access dock/barge land will facilitate the removal of trash form the island. \n57 \nEFTA00802678\n", "char_count": 1986}, {"efta_number": "EFTA00802602", "page_number": 77, "text_content": "7.09 Accidental Spills \nNo fueling or repair will be allowed at the docks. The docks and landing will keep \nemergency spill kits nearby so that in the event of an inadvertent release from a vessel it \ncan be quickly contained. \n7.10 Potential Adverse Effects Which Cannot Be Avoided \nThe project will result in the alteration of an offshore cay and development on shorelines \nwhich have previously been undeveloped. There will be water quality impacts due to \npile installation, but if the turbidity control and monitoring is implemented as proposed \nimpacts should be minimized and short term. There are corals within the footprints and \nimpact area of the construction and these will be transplanted prior to construction \n(Mitigation Plan Appendix B). The docks have been designed so that the vessels are in \ndeeper areas and bottom disturbance should be minimized. \nChristmas Cove is already heavily utilized by boat traffic so the additional vessel use \nshould be negligible. Neither the northern barge landing or southern site are typically \nused by boaters and this will result in increased boat traffic to both. \n8.00 Mitigation Plans \nTo abate and minimize environmental impacts the following mitigation and monitoring \nplans are proposed. \nCoral Relocation and Mitigation Plan Appendix B \nWater Quality Monitoring Plan Appendix C \nTree Boa Protection Plan Appendix D \n9.00 Alternatives to Proposed Action \nA siting study was done around the entire island. All potentially usable docking sites \nwere investigated. Site accessibility was one of the most restrictive issues. \nThe existing dock which is in Shallow Bay is far too shallow and its use has result in \ndamage to the once dense Thalassia testudinztm beds within the bay. Although barges \nhave been landed in the bay it has resulted in damage to the shallow seagrass beds. The \nbay is only 4ft deep 600ft off shore. \nThe dock in its current configuration is not approved by the USACE and the USACE has \nrequested its removal. It was \n... [truncated, 2176 chars — for the full page use /api/corpus/document/EFTA00802602/77 or ?id=EFTA00802602&page=77]", "char_count": 2176}, {"efta_number": "EFTA00802602", "page_number": 78, "text_content": "In order to provide boat access and barge access to the island a new structure or structures \nare necessary. \nMany of the shorelines are inaccessible due to steepness. The most southern embayment \ncould support a dock with similar impacts as the selected sites, access to this embayment \nwas extremely difficult and would require significant cutting and filling which would \nresult in increased environmental impact. \nOn Christmas Cove there are several areas where a dock could be extended from the \nshoreline with similar potential impacts as the proposed dock, however, the areas further \nto the south would have greater seagrass impact, could impact the salt pond and would \nhave a significant impact on the public use of Christmas Cove since the dock would \nextend into the highly used mooring area. The area selected in Christmas Cove is at the \nfar end of the cove and therefore will not result in boat traffic through the mooring field. \nAlternative Analysis for Dock Locations \nGreat St Janes \n.,.., \n7(\nS\ncShallow E A \n0\nt \n. \n/ \nSteep Exposed Shoreline \nt•6 ood AtIcessiLimited Resources \nI ,\nEn \n,' Geiod Access/Avoidable Resotu,..to. \nirelEtay Shallow/Dense'Seagrass\nSteep Shorelines \ncShallow nearshore ESA corals and heavily used by boaters \nSteep Shorelines \nSteep Shorelines \nDifficult to create usable Ecess \nGoogle Earth \nExtremely Shallow Abundant ESA listed Corals \nt \nAdequate Access. Avoidable ESA Resources \nL \nFigure 9.01 Options considered \n10.00 Relationship Between Short Term and Long Term Uses of Man's Environment \nThe existing access to the island of Great St. James is not suitable for the owners \nintended residential use. The existing dock is in too shallow of a bay and is not federally \npermitted in its current configuration. The development of a more suitable dock and \nbarge landing is in the best interest of the environment to abate impacts which are \noccurring due to the shallowness of the bay which is now being used. The development \nof adequate faciliti\n... [truncated, 2179 chars — for the full page use /api/corpus/document/EFTA00802602/78 or ?id=EFTA00802602&page=78]", "char_count": 2179}, {"efta_number": "EFTA00802602", "page_number": 79, "text_content": "11.00 REFERENCES \nLiterature Cited \nBowden, ■. et. al., 1969. Climate, water balance and climatic change in the north-west \nVirgin Islands. Caribbean Research Institute, CVI„ St. Thomas, Virgin Islands. \nBucher, K. E., ■. Littler, M. M. Littler, J. N. Norris. 1989. Marine Plants of the \nCaribbean A Field Guide From Florida to Brazil. Smithsonian Institution Press, \nWashington, M. \nDonnelly,T. 1966. Geology of St. Thomas and St. John, U.S. Virgin Islands. In: Hess, H. \n(ed.) \nCaribbean geological investigations. Geol Soc. Amer. Mem. 98:85-176. \nDonnelly, T., et al. 1971. Chemical evolution of the igneous rocks of the Eastern West \nIndies. In: Donnely, t. (ed.) Caribbean geophysical, tectonic and petrologic studies. Geol. \nSoc. Amer. Mem. 130:181-224. \nHumann, Paul. 1992. Reef Creature Identification. New World Publications, Inc., \nJacksonville, FL. \nHumann, Paul. 1993. Reef Coral Identification. New World Publications, Inc., \nJacksonville, FL. \nHumann, Paul. 1989. Reef Fish Identification. New World Publications, Inc., \nJacksonville, FL. \nIsland Resources Foundation. 1977. Marine environments of the Virgin Islands. \nTechnical Supplement No.1 1976. Prepared for the Virgin Islands Planning Office. \nSTEER (2011) St. Thomas East End Reserve Management Plan. St. Thomas, USVI. \nUSACE Wave Information Studies \nOn line Resources Referenced: \nhttp://www.nmfs.noaa.gov \nhttp://coralpedia.bio.warwick.ac.uk/ \nhttps://msc.fema.gov/portal/advanceSearch \n60 \nEFTA00802681\n", "char_count": 1479}, {"efta_number": "EFTA00802602", "page_number": 80, "text_content": "http://oceancurrents.rsmas.miami.edu/data.html \nhttp://www.spongeguide.org/ \nhttp://tidesandcurrents.noaa.gov/tide predictions \nhttp://websoilsurvey.nrcs.usda.gov/app/WebSoilSurvey.aspx \nhttp://www.ndbc.noaa.gov/ \nhttp://wis.usace.army.mil/hindcasth.html?dmn=atlantic \n70 \nEFTA00802682\n", "char_count": 286}, {"efta_number": "EFTA00802602", "page_number": 81, "text_content": "APPENDIX A \nEFTA00802683\n", "char_count": 25}, {"efta_number": "EFTA00802602", "page_number": 82, "text_content": "BIOIMPACT, INC \n■. BOX 132 \nKINGSHILL, ST. CROIX \nU.S. VIRGIN ISLANDS 00851 \nPHONE NUMBER 340 773-5881, 340 718-3246 \nFAX NUMBER 340 718-3800 \nEMAIL bioimpact@islands.vi \nBIOIM PACT, INC. \nPage 1 \nEFTA00802684\n", "char_count": 210}, {"efta_number": "EFTA00802602", "page_number": 83, "text_content": "BIOIMPACT, INC. QUALIFICATION STATEMENT \nBioimpact, Inc. is a Virgin Islands Corporation licensed to do business in the Virgin Islands \nSince 1986. \nBioimpact, Inc. is qualified to conduct and prepare both terrestrial and marine Environmental \nAssessment Report required by the Department of Planning and Natural Resources, Division of \nCoastal Zone Management, and the U.S. Army Corps of Engineers. \nAmy Claire Dempsey, principal of Bioimpact, Inc. is certified in wetland delineation by the \nNational Wetland Science Training Cooperative to establish wetland jurisdictional limits for the \nU.S. Army Corps of Engineers. \nBioimpact, Inc. is experienced in the creation and implementation of wetland mitigation \nprograms. \nBioimpact. Inc. is experienced in developing and implementing marine water quality monitoring \nprograms and long term photographic monitoring of the benthic environment. Amy Claire \nDempsey, principal of Bioimpact, Inc. is an EPA certified water sampler and analyst. \nBioimpact, Inc. has successfully designed and implemented large scale coral and seagrass \ntransplant programs. \nBioimpact, Inc. is experienced in cable landfall studies and the establishment of routes for \nundersea cables and monitoring of cable installations to minimize impact. \nBioimpact, Inc. is experienced in endangered species surveys included the endangered coral, as \nwell as terrestrial flora and fauna species and is experienced in preparing Biological \nAssessments for National Marine Fisheries and Fish and Wildlife Service. \nBioimpact, Inc. is experienced in preparing Environmental Assessments for federal permitting \nand the issuance of Findings of No Significant Impact. \nBioimpact, Inc. is experienced in the preparations of Phase I Environmental Site Assessments as \nset forth in the ASTM Standard Practice Designation E 1527-13 and All Appropriate Inquires \nand Phase II Environmental Site Assessments as set for in ASTM E1903 - 11. \nBioimpact, Inc. is experience in the development and im\n... [truncated, 2309 chars — for the full page use /api/corpus/document/EFTA00802602/83 or ?id=EFTA00802602&page=83]", "char_count": 2309}, {"efta_number": "EFTA00802602", "page_number": 84, "text_content": "PARTIAL JOB LIST \nUP-DATED November 22, 2016 \nMONITORING PROGRAMS \n2014-2016 Development and Implementation of the Environmental Monitoring Plans for the \nConversion of VIWAPA to LPG for Vitol. \n2014-2016 Development and Implementation of the Environmental Monitoring Plans for the \nDevelopment of a Dolphin Exhibit for Coral World (VI), Inc. \n2013-2016 Development and Implementation of the Water Quality and Environmental \nMonitoring related to the dredging of the Crown Bay Marine Terminal and Turning \nBasin. \n2016- Development and Implementation of the Water Quality Monitoring Plan for the WICO \nEmergency Bulkhead replacement. \n2013 —2015 Environmental Monitoring of the wetland created as mitigation for the \ndevelopment of VIWMA's St.Croix Transfer Station \n2013-2016 Development of the Monitoring Plans for VIDPW's Improvements to Veterans \nDrive St. Thomas \n2013-2014 Development and Implementation of the Monitoring Plans for VIPA's Maintenance \nDredging of Crown Bay Marina, St. Thomas \n2013-2016 Development and Implementation of the Monitoring Plans for Westin Resorts \nPermitting of the dock and Improvements of Drainage, St. John \n2012 —2016 Development and Implementation of the Monitoring Plans for viNGN's Cable \nSystem in the USVI. \n2012-2016 Water Quality and Environmental Monitoring Program for the increase in \ndischarge from the Frenchman's Reef Hotel, St. Thomas \n2011 Water Quality and Environmental Monitoring Program for the installation of a \nChiller System and reconstruction of a dock at Frenchman's Reef Hotel, St. Thomas. \n2010-2012 Development of the Water Quality and Environmental Monitoring Program for the \ndevelopment of Thatch Cay, with special emphasize on the endangered coral species \n2009 Establishment of the baseline for the dredging of Charlotte Amalie Harbor and entrance \nchannel and the filling of the dredged hole in Lindbergh Bay, St. Thomas for \nBIOIMPACT, INC. \nPage 3 \nEFTA00802686\n", "char_count": 1939}, {"efta_number": "EFTA00802602", "page_number": 85, "text_content": "West Indies Company \n2009 — 2010 Water Quality Monitoring Plan for the Construction of the dock at Frenchman's \nCove, St. Thomas for Marriott Vacation Club, Inc. \n2009-2015 Environmental Monitoring for the development of Oil Nut Bay, and YCCS Yacht \nClub, Virgin Gorda, BVI, for Victor International \n2008-2009 Environmental Monitoring of the development of Scrub Island, BVI, for MainSail \nDevelopment, LW \n2007 — 2010 Water Quality Monitoring for the development of the Calabash Boom Affordable \nHousing Complex in Calabash Boom, St. John for Reliance Housing \n2007 - 2009 Water Quality and Environmental Monitoring for the Subdivision of 77 acres in \nHansen Bay, St. John, for Flamboyant \n2006- 2008 Water Quality Monitoring for the dredging of the Sand Channel for the V.I. Water \nand Power Authority \n2006-2007 Water Quality Monitoring for the renovations to the Ritz Carlton Hotel, St. Thomas \nfor Ritz Carlton \n2006 - 2010 Environmental monitoring for the placement of undersea cables at the Global \nCrossing Cable Station in St. Croix for Global Crossing Network, ALCATEL and TYCO \n2005-2007 Water Quality Monitoring for the dredging of Crown Bay, St. Thomas for the V.I. \nPort Authority \n2005- 2006 Water Quality and Environmental Monitoring for Improvements to the Redhook \nMarine Terminal for the V.I. Port Authority \n2004 - 2011 Water Quality and Environmental Monitoring for the construction of the Pond \nBay Resort, St. John for First American Development Group \n2003 - 2006 Water Quality Monitoring for the construction of the Enighed Pond Marine \nTerminal, St. John, for the V.I. Port Authority \n2002 - 2008 Water Quality and Environmental Monitoring for the development of Marine \nAmenities on the island of Lovango, St. John, for the Joseph Markus Trust \n2003 - 2004 Water Quality Monitoring for the development of the Crown Bay Marine Terminal, \nBIOINIPACT, INC. \nPage 4 \nEFTA00802687\n", "char_count": 1904}, {"efta_number": "EFTA00802602", "page_number": 86, "text_content": "St. Thomas for the V.I. Port Authority \n2002-2005 Water Quality Monitoring for the improvements to the Gallows Bay Marine \nTerminal, St. Croix, for the V.I. Port Authority \n1999-2006 Water Quality Monitoring for repairs to the Frederiksted Pier, St. Croix, for the \nV.I. Port Authority \n2001-2008 Coral Transplant Monitoring for the Enighed Pond Marine Terminal, St. John, for the \nV.I. Port Authority \n2001- 2007 Coral Transplant Monitoring for the Mangrove Lagoon Sewage Treatment Plant \nOutfall, St. Thomas for the V.I. Department of Public Works \n2000 - 2003 Water Quality Monitoring for the dredging of Charlotte Amalie Harbor, St. Thomas, \nfor the V.I. Port Authority \n2001 - 2002 Water Quality Monitoring for Improvements to the Tropical Shipping Dock in \nCrown Bay, St. Thomas for Misener Marine \n2000 - 2006 Seagrass Transplant Monitoring for the Seagrass Transplant for the Dredging of \nCharlotte Amalie Harbor for the V.I. Port Authority \n1999- 2002 Water quality monitoring for Construction of Cable Stations at Estate Northside for \nGlobal Crossings \n1997-2002 Wetland monitoring of the Airport Mitigation Site at the Henry E. Rohlsen Airport \nfor the V.I. Port Authority \n1997 - 2002 Wetland monitoring for the Fairplains Mitigation Site at the Henry E. Rohlsen \nAirport for the V.I. Port Authority \n1997- 2005 Water quality monitoring program for Construction of the Christiansted Boardwalk \nin St. Croix prepared for the Government of the Virgin Islands \n1997-2005 Wetland monitoring of Tren Urbano, PR 5 and PR 22 Mitigation *Sites in Puerto \nRico under subcontract to Nutter and Associates for the Puerto Rico Highway Authority \n1996 Water quality monitoring program for Expansion and Improvements to the Redhook \nMarine Terminal in St. Thomas prepared for the V.I. Port Authority \n1996 Water quality monitoring program for the creation of The Enighed Pond Marine \nBIOINIPACT, INC. \nPages \nEFTA00802688\n", "char_count": 1921}, {"efta_number": "EFTA00802602", "page_number": 87, "text_content": "Terminal \nin St. John prepared for Maguire Group, Inc. for the V.I. Port Authority \n1996-1998 Water quality monitoring for the Expansion of the Molasses Pier at the Third Port St. \nCroix conducted for the V.I. Port Authority \n1995 Water quality for the Construction of the AT&T Cable Landing Facility, Estate Northside \nSt. Croix, conducted for AT&T Submarine Systems \n1992-1994 Water quality monitoring program for the Reconstruction of the Frederiksted Pier, \nconducted for the V.I. Port Authority, St. Croix \n1992-1993 Establishment of a baseline and long term monitoring of the benthic community \npotentially impacted by the Water and Power Authority Outfall from the Richmond \nPower Plant, conducted for the V.I. Water and Power Authority, St. Croix \n1992-1993 Preparation of a biological monitoring study for the Cooling Pond Discharge, and \nmonitoring of the algal bloom within the cooling ponds; development of management \nstrategies to alleviate algal and runoff problems, the V.I. Alumina Corporation, St. Croix \n1990-1992 Water quality monitoring for The Dredging Project and Related Activities in \nChristiansted Harbor, conducted for the V.I. Port Authority, St. Croix \n1989 Turtle Monitoring Program for Manchineel Beach, St. Croix \nLARGE SCALE MITIGATION PROGRAMS \nUPDATED November 22, 2016 \nDevelopment and Implementation of the relocation of 10,000 corals off the WICO bulkhead in \nHavensight for West Indies Company. \nDevelopment and Implementation of a coral transplant for the Stabilization of the Seawater \nIntake line for Marriott Frenchman's Reef. \nDevelopment and Implementation of a coral transplant to minimize construction impacts for \nLPG Improvements at the VIWAPA facilities on St. Croix and St. Thomas. \nDevelopment and Implementation of a coral transplant for Coral World (VI), Inc. in \nAssociation with the development of the dolphin exhibit. \nDevelopment of the Mitigation Plans for VIDPW's Improvements to Veterans Drive \nSt. Thomas \nBIOIMPACT, INC. \nPage 6 \nEFTA008\n... [truncated, 2006 chars — for the full page use /api/corpus/document/EFTA00802602/87 or ?id=EFTA00802602&page=87]", "char_count": 2006}, {"efta_number": "EFTA00802602", "page_number": 88, "text_content": "Development and Implementation of the Mitigation Plans for VIPA's Dredging of Crown Bay \nMarine Terminal and Turning Basin, St. Thomas \nDevelopment and Implementation of the Mitigation Plans for VIPA's Maintenance Dredging of \nCrown Bay Marina, St. Thomas \nDevelopment and Implementation of the Mitigation Plans for Westin Resorts Permitting of the \ndock and Improvements of Drainage, St. John \nVirgin Islands Waste Management Authority creation of an Herbaceous Wetland as mitigation \nfor the construction of the Transfer Station at the Anguilla Landfill, St. Croix \nMainsail Coral Transplant/Seagrass Transplant for impacts associated with the development of \nthe Scrub Island Resort BVI, Bioimpact, Inc. came in and completed the transplant and \nmonitoring began by others (Approximately 3000 Corals) \nVictor International Coral Transplant for impacts associated by the development of an access \nramp and dock at Oil Nut Bay, BVI (Approximately 300 corals) \nV.I. Port Authority Mangrove Mitigation for the construction of the Enighed Pond Terminal in \nSt. John (2.8 Acres of Mangrove Wetland) \nJoseph Markus Trust Creation of Acropora Thickets and Artificial Reefs as mitigation for the \nconstruction of a barge landing facility on the island of Lovango \nV.I. Port Authority Transplanting of coral out of the area of impact for the development of the \nCrown Bay Marine Terminal, St. Thomas (Approximately 3000 Corals) \nDepartment of Public Works Mangrove Mitigation Project for the construction of the Mangrove \nLagoon Sewage Treatment Plant, St. Thomas (Approximately 1 Acre of Mangrove \nWetland) \nV.I. Port Authority Transplanting of Coral out of the area of impact for the Enighed Pond Marine \nTerminal Project, St. John (Approximately 50,000 Corals) \nDepartment of Public Works Transplanting of Coral out of the area of impact for the placement \nof the Mangrove Lagoon Sewage Treatment Plant Outfall, St. Thomas (Approximately \n7,000 Corals) \nV.I. Port Authority Transplanting of Coral out of \n... [truncated, 2151 chars — for the full page use /api/corpus/document/EFTA00802602/88 or ?id=EFTA00802602&page=88]", "char_count": 2151}, {"efta_number": "EFTA00802602", "page_number": 89, "text_content": "V.I. Port Authority Transplanting of Seagrass from the Dredging footprint for the dredging of \nCharlotte Amalie Harbor, St. Thomas (Approximately 2 acres) \nV.I. Port Authority/Department of Public Works, Mangrove Mitigation Project for the \nconstruction of the Molasses Dock Road, St. Croix (Approximately Vz acre) \nV.I. Port Authority creation of Herbaceous Wetlands for mitigation at the Henry E. Rohlsen \nAirport, St. Croix (Approximately 1 acres) \nV.I. Port Authority mitigation plan for impact incurred in Fairplains Gut by the VIPA plan for \ncreation of 16,000 Square Feet of Wetland at the Manning Bay Site, St. Croix \nV.I. Water and Power Authority plan for creation of 4.1 Acres of Wetland as mitigation of the \nconstruction of the South Shore Power Plant, Third Port, St. Croix \nGreen Cay Plan for mitigation for the impacting of 12 Acres of Wetland for the construction of \nthe Green Cay Resort, St. Croix \nENVIRONMENTAL ASSESSMENT REPORTS 2014-2016 \nVeterans Drive Expansion with Parsons Brinkerhoff, for the Department of Public Works \nSt. Thomas \nMaintenance Dredging Krause Lagoon Channel for VIPA \nWestin Resort for a new reverse osmosis discharge line \nVI WAPA's submarine cable system to provide power to WICO Cruise Ship terminal and BVI \nShoreline Stabilization Project for Buccaneer Hotel, St. Croix \nVIWAPA's conversion to LPG in both St. Croix and St. Thomas. \nviNGN Submarine Cable Network with Acatel-Lucent for Virgin Islands Next Generation \nNetwork, Virgin Islands \nVIPA improvements to the Frederiksted Pier, St. Croix \nVIPA improvements to the Red Hook Marine Terminal, St. Thomas \nOffshore Windmills for Ocean Energy, Inc. \nBIOIMPACT, INC. \nPage 8 \nEFTA00802691\n", "char_count": 1693}, {"efta_number": "EFTA00802602", "page_number": 90, "text_content": "St. John Marina for Summers End Group, St. John \nVIPA maintenance dredging of the Schooner Channel \nVIPA remediation of hydrocarbon contamination at the VIPA Seaplane Ramp \nSt. John Marina at Summer's End \nWICO with CH2M Hill maintenance of the existing bulkhead and maintenance dredging of \nCharlotte Amalie Harbor \nENVIRONMENTAL ASSESSMENT REPORS 2009-2013 \nVIPA's dredging of Crown Bay Marine Terminal and Turning Basin. \nVIPA's maintenance dredging of Crown Bay Marina. \nVIDPW's Improvements to Bordeaux Road, St. Thomas. \nVIDPW's Improvement to Spring Gut Road, St. Croix. \nCoral World's Dolphin Exhibit for Coral World (VI), Inc., St. Thomas. \nExpansion of the Spratt Bay Homeowners Dock on Water Island. \nVeterans Drive Expansion with Parsons Brinkerhoff, for the Department of Public Works \nSt. Thomas \nChiller Cooling System, BaHaMar, HDR, Grande Bahama \nReverse Osmosis Facility at VIWAPA's St. Thomas Power Plant \nSubmarine Cable for VIWAPA between the Islands of St. Thomas and St. John \nChiller System and Dock repairs at Frenchman's Reef, St. Thomas \nExpansion of Heavy Materials Krum Bay Facility, St. Thomas \n33 Mega-Watt Waste to Energy Plant Alpine Energy Group, Inc. St. Thomas \n18 Mega-Watt Waste to Energy Plant Alpine Energy Group, Inc. St. Croix \nBIOIMPACT, INC. \nPage 9 \nEFTA00802692\n", "char_count": 1308}, {"efta_number": "EFTA00802602", "page_number": 91, "text_content": "Reverse Osmosis Facility V.I. Water and Power Authority, St. John \nSeven Hills Development, Robin Bay Partners, St. Croix \nImprovements to the Molasses Dock, V.I. Port Authority, St. Croix \nDredging of the Charlotte Amalie Harbor and the Channel and the Filling  of Lindbergh Bay, \nWest Indies Corporation, St. Thomas \nFueling Station, V.I. Water and Power Authority, St. Croix \nENVIRONMENTAL ASSESSMENT REPORTS 2005 -2008 \nPort of Mandahl, MSJ Realty, St. Thomas \nNorth Sound Yacht Club, Victor International, Virgin Gorda, BVI \nReconstruction of the Frenchman's Cove Dock, Marriott Ownership Vacation Club, Inc. St. \nThomas \nThatch Cay Development, Thatch Cay, LLC, St. Thomas \nSmith Bay Development Smith Bay Developers, Inc. Smith Bay, St. Thomas \nSubdivision of Great St. James Christian Kejer, Great St. James Island, St. Thomas \nSubdivision of Inner Brass Green Island Developers, Inner Brass Island, St. Thomas \nSubdivision of Inner Brass Byran family, Inner Brass Island, St. Thomas \nCabrita Point Major Land Permit Cabrita Point Partners, Lionstone LLC, Cabrita Point, St. \nThomas \nCabrita Point Major Water Permit Cabrita Point Partners, Lionstone, LLC, Cabrita Point, St. \nThomas \nSubdivision of 77 Acres in Hansen Bay on the East End of St. John Flamboyant Realty, St. \nJohn \nBIOIMPACT, INC. \nPage 10 \nEFTA00802693\n", "char_count": 1328}, {"efta_number": "EFTA00802602", "page_number": 92, "text_content": "Subdivision of 14 Acres in Hansen Bay on the East End of St. John Hansen Bay Development \nGroup, St. John \nExpansions and Improvements to the Ritz Carlton Hotel William Karr and Associates, St. \nThomas \nModification to Carden Beach Condominiums TK Properties, Inc. St. Croix \nDevelopment of Betty's Hope V.I. Port Authority, St. Croix \nExpansion of the Compass Point Marine Margate Management, Benner Bay, St. Thomas \nConstruction of Maintenance Buildings HOVENSA, St. Croix \nReplacement of Existing Stacks HOVENSA, St. Croix \nInstallation of a Permanent Barge Landing Facility on Lovango Cay Joseph Markus Trust, \nLovango Cay \nRelocation of the Existing Barge Landing and Construction of a Swim Dock and Beach \nEnhancing Devices on Little St. James LSJ, LLC, Little St. James \nDevelopment of Affordable Housing in Calabash Boom, Reliance Housing, St. John \nDemineralized Water System and Storage Tank Upgrades, V.I. Water and Power Authority, St. \nCroix \nDevelopment of a Pizza Bar and Miniature Golf Course, Divi Carina Bay Resort, St. Croix \nPlacement of Fuel Pipelines on the Ann E. Abramson Pier, Royal Caribbean Cruise Lines, St. \nCroix \nDevelopment of a Marine and Related Infrastructure, Coral Bay Marina LLC, St. John \nDevelopment of a Marine Mammal Encountered Facility, Coral World VI, St. Thomas \nImprovements to The \"Doc\" James Race Track, TRAXCO, St. Croix \nMaintenance Dredging and the Permitting of Permanent Moorings, Westin Resort, St. John \nConstruction of the LSF Facility, HOVENSA, St. Croix \nBIOIM PACT, INC. \nPage 11 \nEFTA00802694\n", "char_count": 1554}, {"efta_number": "EFTA00802602", "page_number": 93, "text_content": "Construction of the LSF Project on Uplands, HOVENSA, St. Croix \nConstruction of the LSF Project on Submerged Lands, HOVENSA, St. Croix \nConstruction of Modular Buildings, HOVENSA, St. Croix \nConstruction of Housing in Estate Blessing, HOVENSA, St. Croix \nPermitting of an Existing Borrow Pit, HOVENSA, St. Croix \nENVIRONMENTAL ASSESSMENT REPORTS 2000.2004 \nCompass Point Marina Expansion of the existing marina with Springline Architects, St. Thomas \nEmergency Electrical Cable to St. John V.I. Water and Power Authority, St. Thomas/St. John \nRichmond Sand Channel Dredging V.I. Water and Power Authority, St. Croix \nHassel Island Electrical Cable Replacement V.I. Water and Power Authority, St. Thomas \nGolden Resort Hotel Casino Resort Environmental Assessment Report, St. Croix \nCrown Bay Marine Terminal Improvements Environmental Assessment Report with Adams, \nInc., St. Thomas \nGlobal Crossings Environmental Assessment Report for the Placement of a Point of Presence in \nFrederiksted, St. Croix \nInnovative Telephone Environmental Assessment Report for the Burial of Fiber Optic Cable on \nthe North Shore of St. Croix \nInnovative Telephone Environmental Assessment Report for the Burial of Fiber Optic Cable on \nthe West End of St. Croix \nCallaloo Club Blowing Point Environmental Assessment for the Crasion of a marina on \nAnguilla, BWI \nV.I. Water and Power Authority Waterline Environmental Assessment for a waterline between \nSt. Thomas and St. John \nV.I. Water and Power Authority Powerline Environmental Assessment for a utility line between \nSt. Thomas and Little St. James \nBIOIM PACT, INC. \nPage 12 \nEFTA00802695\n", "char_count": 1629}, {"efta_number": "EFTA00802602", "page_number": 94, "text_content": "Global Crossings Environmental Assessment Report for the South American Crossing Cable \nStation at Estate Northside \nWater Island Ferry Dock Environmental Assessment Report for the construction of a ferry dock \non Water Island \nCuisanart Environmental Impact Assessment for Beach Renourishment, Anguilla, BWI \nCinnamon Bay Environmental Impact Assessment for Development of a Marine Facility, \nAnguilla, BWI \nCrown Bay Benthic Habitat Survey of Crown Bay and Gregerie Channel as a supplement to the \nUSACOE Feasibility Report \nFrederiksted Pier Environmental Assessment Report for the Improvements to the Existing \nFrederiksted Pier, St. Croix \nLittle St. James Environmental Assessment Report for a Private Dock on Little St. James Island \nGovernment of the Virgin Islands Environmental Assessment Report for Phase II of the \nChristiansted Boardwalk, St. Croix \nBeal Aerospace Environmental Assessment Report for Construction of the World Headquarters \nEstate Great Pond, St. Croix \nENVIRONMENTAL ASSESSMENT REPORTS 1988.2000 \nDivi Hotel Environmental Assessment Report for the reconstruction of a dock, St. Croix \nGlobal Crossing Environmental Assessment Report for the construction of a Cable Terminal \nBuilding and a corridor for 8 submarine fiber optic cables \nHOVENSA Environmental Assessment Report for the Construction of a Coker and Coker Dock \nat the Existing HOVIC Refinery \nV.I. Port Authority Environmental Assessment Report for the construction of a Mooring Dolphin \nat the Frederiksted Pier \nSeaborne Environmental Assessment Report for the Development of a Seaplane Terminal at the \nold Seaplane Ramp. St. Croix \nBIOIMPACT, INC. \nPage 13 \nEFTA00802696\n", "char_count": 1668}, {"efta_number": "EFTA00802602", "page_number": 95, "text_content": "Forest Bay Environmental Assessment Report for the Development of a Marina and related \nfacilities in Forest Bay Anguilla, BWI \nMETA Resorts Environmental Assessment Report for the development of a Dolphin Lagoon at \nMeads Bay Anguilla, BWI \nGovernment of the Virgin Islands Environmental Assessment Report for the Construction of a \nboardwalk in Christiansted, St. Croix \nV.I. Port Authority Environmental Assessment Report for the runway extension at the Henry E. \nRohlsen Airport under subcontract to LPA Group \nV.I. Port Authority Environmental Assessment Report for the expansion of the Redhook Marine \nTerminal, St. Thomas \nV.I. Port Authority Environmental Assessment Report for the creation of the Enighed Pond \nMarine Facility, St. John \nCoral World (VI), Inc. Environmental Assessment Report for the renewal of the submerged land \nlease for the Coral World Facility, St. Thomas \nCowpet Bay Environmental Assessment Report for the modification of the existing permit for \nconstruction of a seawall, St. Thomas \nWatergate East Villas Environmental Assessment Report for the Construction of a Rip-Rap \nRevetment, St. Thomas \nChristiansted Boardwalk Environmental Assessment Report for the construction of a boardwalk \non the Christiansted Waterfront, St. Croix \nV.I. Water and Power Authority Environmental Assessment Report for Improvements to the fuel \ndock at the Power Generating Facility, St. Thomas \nLa Domaine Environmental Assessment Report for the subdivision of 40 Acres of Land in Estate \nMisngunt, St. Thomas \nV.I. Port Authority Environmental Assessment Report for the expansion of the Alexander \nHamilton Airport Terminal and Highway 64 Relocation, St. Croix \nAT&T Environmental Assessment Report for the Cable Landing Facility at Estate Northside, St. \nCroix \nBIOIMPACT, INC. \nPage 14 \nEFTA00802697\n", "char_count": 1821}, {"efta_number": "EFTA00802602", "page_number": 96, "text_content": "DEVCON Environmental Assessment Report for the Dredging of the Christiansted Sand \nChannel, St. Croix \nVIALCO Environmental Assessment Report for the Expansion of the Red Mud Storage Ponds, \nVIALCO Alumina Facility, St. Croix \nVIALCO Environmental Assessment Report for the creation of a stormwater drainage system, \nVIALCO Alumina Facility, St. Croix \nVIALCO Environmental Assessment Report for the Mining of Caliche, VIALCO Alumina \nFacility, St. Croix \nMolasses Dock/VI Port Authority Consulting on the Environmental Assessment Report for the \nMolasses Dock Terminal at the Third Port Facility, subcontracted by Frank Torrez, and \nthe V.I. Port Authority, St. Croix \nSELECTED ENVIRONMENTAL ASSESSMENT REPORTS 1988 -1993 \nSt. Croix by the Sea Environmental Assessment Report for beach renourishment and the \nconstruction of jetties, St. Croix \nVieques Environmental Assessment Report for the creation of a shrimp farm in Puerto Ferro, \nVieques, Puerto Rico \nMSRC Dock Environmental Assessment Report for the construction of a pier in the HOVIC \nWest Turning Basin, St. Croix \nEden Beach Proposed hotel and condominium project Environmental Assessment Report, St. \nCroix \nTamarind Reef proposed reconstruction and expansion of the Tamarind Reef Hotel, Hotel, St. \nCroix \nV.I. Water and Power Authority Environmental Assessment Report and U.S. Corps of Engineers \nApplication for the construction of two gas turbines at the Third Port Site, St. Croix \nLovango Cay Environmental Assessment Report for the creation of a subdivision on Lovango \nCay Placement of a private dock, St. Thomas \nVIALCO Environmental Assessment Report for the construction of a well water gathering \nMOIMPACT, INC. \nPage 15 \nEFTA00802698\n", "char_count": 1712}, {"efta_number": "EFTA00802602", "page_number": 97, "text_content": "system for wells at the Virgin Islands Alumina Corporation's Plant, St. Croix \nCrawl Cay Environmental Assessment Report, Wetlands Delineation and Hammock Studies of \nCrawl Cay, Florida, for Monroe County \nJack's Bay Environmental Assessment Report for the subdivision of Approximately 300 Acres \ninto 64 lots at Estate Jack's and Isaac's Bays, St. Croix \nVIALCO Environmental Assessment Report for the Expansion of the Bauxite Building at the \nVirgin Islands Alumina Corporation's Alumina Facility, St. Croix \nCarambola Beach Club Environmental Assessment Report for the repair and improvement of the \nCarambola Beach Club facility prepared for Danested, St. Croix \nSalt River Environmental Impact Statement for the proposed National Park at Salt River, St. \nCroix, prepared for the National Park Service \nV.I. Water and Power Authority Environmental Assessment Report for the Construction of a \ndesalination unit on St. John, prepared for the V.I. Water and Power Authority, St. John \nCannel by the Sea Environmental Assessment Report for the Construction of a 95 unit \ncondominium at Estate Turner's Hole, St. Croix \nVLBA Environmental Assessment Report and Landscaping Plan for the Very Long Baseline \nArray, St. Croix \nBuccaneer Environmental Assessment Report for 20 room addition to the Buccaneer Hotel, St. \nCroix \nRitz Carlton Zoning Application and Environmental Assessment Report for a 350 report for a \n350 room hotel, Estate Davis Bay, St. Croix \nFrederiksted Pier Environmental Assessment Report for the construction of a second pier in \nFrederiksted, St. Croix \nKingston Environmental Assessment Report for Hotel and Condominium Construction, \nKingston, Tortola \nAirport Warehouse Environmental Assessment Report for construction of a Warehouse Facility \nat the Alexander Hamilton Airport, St. Croix \nGreat Pond Environmental Assessment Report, Zoning Application and COE Permit Application \nfor a Hotel and Condominium Project at Estate Great Pond. St. Croix \nBIOIM PACT, INC. \nPage 1\n... [truncated, 2016 chars — for the full page use /api/corpus/document/EFTA00802602/97 or ?id=EFTA00802602&page=97]", "char_count": 2016}, {"efta_number": "EFTA00802602", "page_number": 98, "text_content": "ENVIRONMENTAL ASSESSMENT REPORTS 1986-1988 \nSoutheast Peninsula, St. Kitts \nColumbus Landing, St. Croix \nGrapetree Beach, St. Croix \nBlue Beards Beach, St. Thomas \nSt. Croix by the Sea, St. Croix \nDivi Dive Canal, Nassau, Bahamas \nEnsenada, St. Croix \nVirgin Grand, St. Croix \nSugar Bay, St. Croix \nTurtle Run, St. Croix \nPalm Shores, St. Croix \nBaobab, St. Croix \nReflection Bay, St. Croix \nCoakley Bay, St. Croix \nGreen Cay, St. Croix \nTurquoise Bay St. Croix \nEagle Bay, St. Croix \nGranard, St. Croix \nConcordia, St. John \nENVIRONMENTAL ASSESSMENTS \nSampling of the LUST's at the VIPA's Seaplane Ramp, St. Croix 1994, 2011, 2012-2016 \nSampling for REC Estate Anna's Hope, St. Croix 2012-2-16 \nSampling for petroleum products at gasoline stations and industrial sites in St. Croix 2006-2016 \nSampling for chemical contamination in cisterns in St. Croix 2000- 2011 \nSampling for mold Renaissance Hotel, St. Thomas \nSampling for REC residential and commercial properties St. Croix, St. Thomas, St. John and \nPuerto 1990 - 2016 \nBIOIMPACT, INC. \nPage 14 \nEFTA00802700\n", "char_count": 1067}, {"efta_number": "EFTA00802602", "page_number": 99, "text_content": "APPENDIX B \nCORAL TRANSPLANT AND MITIGATION PROGRAM \nFOR THE CONSTRUCTION OF THE ACCESS DOCK AND \nACCESS DOCK/BARGE LANDING ON \nGREAT ST. JAMES \nU.S. VIRGIN ISLANDS \nGREAT ST. JIM, LLC. \nPREPARED BY \nBIOIMPACT, INC. \nM. BOX 132 \nKINGSHILL, ST. CROIX \nU.S. VIRGIN ISLANDS 00851 \nbioimpact@islands.vi \nJANUARY 2017 \nEFTA00802701\n", "char_count": 327}, {"efta_number": "EFTA00802602", "page_number": 100, "text_content": "TABLE OF CONTENTS \nI. \nINTRODUCTION \nII. \nOBJECTIVES \nIII. \nSITE SELECTION \nIV. \nSITE PROTECTION INSTRUMENT \nV. \nBASELINE INFORMATION \nVI. \nCOMPENSATION FOR UNAVOIDABLE IMPACTS \nVII. \nMITIGATION WORK PLAN \nVIII. \nMAINTENACE PLAN \nIX. \nECOLOGICAL PEFORMANCE STANDARDS \nX. \nMONITORING REQUIREMENTS \nXI. \nLONG-TERM MANAGEMENT PLAN \nXII. \nADAPTIVE MANAGEMENT PLAN \nXIII. \nFINANCIAL ASSURANCES \nThis plan follows the compensatory mitigation guidelines as set forth in 40 CFR Part \n230, Compensatory Mitigation for Loses of Aquatic Resources: Final Rule. The \nfundamental objective of compensatory mitigation is to offset environmental losses \nresulting from unavoidable impacts to the waters of the United States authorized by DA \npermits. \nEFTA00802702\n", "char_count": 749}, {"efta_number": "EFTA00802602", "page_number": 101, "text_content": "I. INTRODUCTION \nGreat St. Jim, LLC is seeking to construct two docks, one of which is a combination \ndock/ barge landing, and a temporary barge landing to provide access to Great St. James \nIsland. \nThere is currently a small pile-supported dock located within Shallow Bay on the north \nside of the island. The bay is very shallow and vessels accessing the dock have damaged \nthe shallow seagrass beds within the bay. At one time, there had been a concrete \nbulkhead at the shoreline with a small floating dock. The previous owner submitted an \napplication for the existing dock which was approved by DPNR's Division of Coastal \nZone Management, but was not approved by the U.S. Army Corps of Engineers due to \nobjections by National Marine Fisheries because of the shallowness of the bay. The dock \nwas constructed by the previous owner despite not receiving the federal permit and \nnotices were issued by the USACE requesting the removal of the unpermitted structure. \nThe dock however was never removed. The applicant, understands the issues with the \nexisting dock and is proposing to remove the dock as soon as another dock is constructed \nand usable. \nA detailed study was done around the entire island to determine suitable locations for \ndock location. All ESA listed corals were located and docks and barge landings were \ndesigned to avoid these corals. \nA temporary barge landing is being proposed on the northwestern facing beach. This site \nis to the west of the salt pond and the associated wetlands. This a shoreline ramp which is \n25 feet (ft) wide and 40ft in length extends to the Mean Water Line. The landing is free \nof both coral and seagrass colonization. The landing is excellent for short term transfer of \nmaterial or equipment. The site is well protected from normal wave action but is \nperiodically impacted by wave action from ferries which travel through current cut \nbetween Great St. James and St. Thomas. The wakes from these vessels make it an \nunattractive site for \n... [truncated, 2699 chars — for the full page use /api/corpus/document/EFTA00802602/101 or ?id=EFTA00802602&page=101]", "char_count": 2699}, {"efta_number": "EFTA00802602", "page_number": 102, "text_content": "The southern dock is located off the point closest to Little St. James. The dock is \"L\" \nshaped and is 20ft wide (to allow for barge landing) and 150ft in length extending 141ft \nfrom MLW and 148ft from MHW, the \"L\" then turns east and extends 100ft by 20ft. A \nwave attenuating/reef creating system is proposed beneath the dock which will allow for \nmore protected docking inside the dock when seas from the south are rough. The dock \nhas 9ft of water depth of the southern end and 7ft to 8ft on the inside of the \"L\". The \ndock has been designed so that barges can approach and land on the end of the dock \nwhile vessels can dock along the \"L\". \nREASON FOR MITIGATION \nThe marine habitats around Great St. James have abundant coral and seagrass resources. \nThere are numerous ESA listed corals species near the proposed dock locations. \nAcropora palmata, Acropora. cervicornis, Orbicella annularis, Orbicella franksi and \nOrbicella faveolata as well as Dendrogyra cylindrus are found off all the beach from \nwhich the proposed docks and barge landings are planned. At the northern temporary \nbarge landing site, these corals are located primarily to the west in an area of coral \nboulders and coral rubble. However, there are several small A. palmata and several 0. \namiularis located on the shoreline cobble which extends out to a depth of 6.5ft. The \npresence of these species as well as several non-ESA listed Porites astreoides has \ndictated the location of the ramp. The proposed temporary barge landing position avoids \nall coral and seagrass resources. \nLocation of the western dock has a cobble beach between two areas of emergent bedrock \nand boulders. A. palmata occur on the emergent bedrock to the north. Offshore the \nseafloor quickly gives way to exposed pavement. There is a long linear depression right \noffshore and an old piling lies within this area. The fractured pavement then extends to \napproximately 11.5ft of depth over the next 100ft heading offshore. The area has some \nw\n... [truncated, 3175 chars — for the full page use /api/corpus/document/EFTA00802602/102 or ?id=EFTA00802602&page=102]", "char_count": 3175}, {"efta_number": "EFTA00802602", "page_number": 103, "text_content": "II. MITIGATION OBJECTIVES \nIt is the objective of this mitigation project to limit the amount of coral and coral habitat \nthat is lost as a result of the dock and barge access construction. All of the coral, sponge, \nand sessile life forms within the footprint of the facility or which might be potentially \nimpacted during construction or operation will be transplanted. Approximately one \nhundred and fifty (150) corals will be relocated. \nIII. \nSITE SELECTION \nThe recipient sites were selected due to their being similar environments and being close \nto the mitigation site. \nThe corals from the Christmas Cove site will be located to the north onto the adjacent \nhardbottom areas which are at equivalent depths. The corals from the southeastern dock \nsite will be transplanted to the hardbottom to the south which are at equivalent depths. \nFigure 1. Recipient site Christmas Cove \nEFTA00802705\n", "char_count": 900}, {"efta_number": "EFTA00802602", "page_number": 104, "text_content": "k\niffrcult tocreate usabie \ncess ,frvecipient \nA \nFigure 2. Recipient site southeastern dock \nIV. \nSITE PROTECTION INSTRUMENT \nThe applicant will prepare an easement setting these areas aside as protected areas. \nV. \nBASELINE INFORMATION \nBenthic Habitat Description \nGeneral \nSandy beaches, cobble beaches and steep rocky shorelines surround great St. James \nIsland. All three of the proposed dock and barge landing sites will extend from cobble \nbeaches. The northern shore where the temporary barge landing is proposed has cobble \nwhich extends down to a depth of approximately 7ft and has sparse seagrass colonization \nwithin the barge approach. There are scattered corals in the bay to the east and dense \nseagrasses offshore beyond the landing site. The cobble within the landing site is only \ncolonized by fire coral. The emergent bed rock to both the east and west sides of the bay \nare colonized by corals species including ESA corals. \nThe northern portion of Christmas Cove where the Access Dock is located has emergent \nbedrock to either side of the small embayment which are colonized by coral and sponge \nspecies. Rock pavement and scattered boulders extends offshore to a depth of 11.5ft \nwhere it gives way to a sandy bottom. Corals and sponges colonize the rock pavement \nand scattered boulders. There is seagrass off shore but it begins beyond the terminus of \nthe proposed dock. \nThe southern facing dock is off a cobble beach between to rocky shorelines. There is \nrock pavement extending off shore and then broken rock pavement further out. Corals \nand sponges colonized the rock pavement. \nEFTA00802706\n", "char_count": 1625}, {"efta_number": "EFTA00802602", "page_number": 105, "text_content": "ESA listed coral species are found at all three locations and the Nassau Grouper \n(Epinephelus striatus) was seen off both the Christmas Cove and southern dock site. \nMethods \nThe NOS St. John and St. Thomas Habitat map Tile 16 (Figure 6.06.1) of the Great St. \nJames area shows the colonized rock pavement and bedrock as well as the offshore \nseagrass beds. The seagrass beds are not as continuous near the shoreline as shown, and \nthe offshore area at both Christmas Cove and the southern dock site are colonized \npavement rather than bedrock right off the cobble beaches and on the northern facing \nbeach the pavement doesn't extend completely across the bay as shown. Surveys were \ndone on Scuba and Acropora palmata and Acropora cerviconds, Dendrogyra cylindrus, \nOrbicella annularis, Orbicella faveolata, Orbicella franksi, and Mycetophyllia ferox were \nmapped so that they could be avoided. Habitat boundaries were marked with GPS and/or \nby the surveyor for accuracy. Percent abundance was determined along transect lines and \nutilizing a meter square. \n-2•••• \n0:1•••••••••••••••••+ \nMIns••••a••••• \ngr. \n1=12 \nFigure 1. NOAA Benthic Habitat Map \n• PE \n• MO \nla, \nBenthic Resources \nNM. \nGreat St. James is located off Water Point on the eastern end of St. Thomas. This oddly \nshaped island has a variety of shoreline types and six salt pond/wetland habitats. There is \na well-protected shallow northern bay where an existing dock is located. Shallow Bay is \ncolonized by seagrass which includes Thalassia testudinum, Syringodium Monne and \nHalodule wrightii. Recently the sea vine Halophila stipulacea has colonized areas which \nhave been disturbed. The densest seagrass beds once lay near shore and to the east of the \ndock. Over the last several years these beds have been highly disturbed. The peninsula to \nthe east of this point is surrounded by rocky headlands and is a very exposed \nEFTA00802707\n", "char_count": 1913}, {"efta_number": "EFTA00802602", "page_number": 106, "text_content": "environment. The rocky cliffs extend below the sea surface and due to the intense wave \naction, the shallowest areas are not colonized. By a depth of 8ft-10ft the rocky substrate \nbecomes colonized by a wide variety of corals and sponges. The slope is steep offshore \nand the water reaches a depth of 40ft to 50ft relatively close to shore. The rocky slope \ngives way to a cobble then sand bottom and there are sparse to moderately dense seagrass \nbeds that extend seaward. The rocky shoreline continues around to the south, with coral \ncolonized nearshore hardbottom and seagrass colonized sand and cobble further offshore. \nThere are two cobble beaches further to the south divided by a small rocky headland, \nthere is some colonized beach rock nearshore and shallow seagrass beds off shore. The \nshoreline facing St. James Cut and the southern end of the island is rocky. This area has \nlimited coral colonization in the inner tidal zone giving way to an abundant diverse coral \ncommunity on the submerged rocky slopes. The rock is relatively steep with numerous \ngrottos, and caves, and gives way to a cobble/sand bottom at around 20ft to 25ft. There \nare moderate to dense seagrass beds off shore. The Stragglers lay off the southern most \npoint of the cay, and like the southern shoreline of the island there is minimal \ncolonization in the inner tidal areas of the emergent rocks with coral colonization and \ndiversity increasing with depth. The western shoreline is well protected and is a \ncombination of rock and sandy beach. The water deepens much more gradually on this \nside of the island. In the areas with rock along the shoreline are colonized by corals and \nsponges. The less colonized inner tidal area is much less defined here due to the more \nprotected nature of the site. Within Christmas Cove there is a rock groin like structure \nthat extends into the bay near the center of the embayment. Offshore to the north of the \ngroin there is a small beach rock shelf and then a strip \n... [truncated, 3833 chars — for the full page use /api/corpus/document/EFTA00802602/106 or ?id=EFTA00802602&page=106]", "char_count": 3833}, {"efta_number": "EFTA00802602", "page_number": 107, "text_content": "which the barge will extend while moored. There very sparse Syringodium colonization \nwithin the barge approach, representing less than 5% bottom coverage. \nNorthern site \nFigure 2. Benthic habitats at the bare landing. \n \n obble in footprint of barge mooring site \neagrass offshore well beyond the cobble \nEFTA00802709\n", "char_count": 320}, {"efta_number": "EFTA00802602", "page_number": 108, "text_content": "approach \nSparse seagrass in the immediate barge \nThe access dock in Christmas Cove is near the location of an old historic dock. The beach \nis a mixture of sand and cobble. There is rock pavement extending offshore and there is \nan area of cobbles in the center of this area which is uncolonized out to a depth of 5ft. \nThe rock pavement has various depressions and breaks and within one of these \ndepression is a pile from the old concrete dock. Beyond the depression, the water deepens \nquickly out to a depth of 12ft. The rock pavement is colonized by Diplona strigosa, D. \nlabyrinthifonnis, Orbicella annularis, 0. franksi, Porites astreoides, P. porites, \nDendrogyra cylindrus, Gorgonia sp. and Millepora sp. and the sponges Aplysinafidva, \nAmphimedon compressa and Ircinia sp. Coral colonization increases on either end of the \nsmall embayment and with depth. Beyond the nearshore hard bottom, approximately \n120ft off shore the bottom becomes sandy. There is a minimally colonized area before the \nbottom begins to become colonized by Syringodiztmfilifonne which slowly grades into a \nmixed bed of Thalassia testitudium and Syringodium. The exotic seavine Halophila \nstipulacea is also present. This seavine was not present in 2006. \nThere was a very large intact Acropora cerviconzis in the center of the bay just off the old \ndock piling in the depression early in 2016. However, a boat moored on the old piling \nand on a subsequent dive the Acropora was found completely broken. Pieces of this \nAcropora remain. There are Acropora palmata in the shallows to the north of the \nproposed dock location both on the cobble and bedrock. \nEFTA00802710\n", "char_count": 1656}, {"efta_number": "EFTA00802602", "page_number": 109, "text_content": "The bottom formation is dead visible this •hoto• a h. \nFi tire 3. Benthic Habitats Christmas Cove \nobble with minimal colonization \n43 \nEFTA00802711\n", "char_count": 149}, {"efta_number": "EFTA00802602", "page_number": 110, "text_content": "Sand beyond colonized pavement \n Old piling \nShallow Acropora \nBroken A. cerviconzis \nThe Access Dock/Barge dock is located in the bay closest to Little St. James. Like the \nother two bays there is cobble on the shoreline which extends into the sea to 2ft to 4ft of \nwater depth. Offshore there is pavement with boulders and odd rock formation. The area \nis colonized by scattered corals which are most abundant on the boulders. Orbicella \namiulans, O. franksi, O. faveolata, Dendrogyra cylindrus, Porites astreoides, P. porites, \nDiploria strigosa, D. clivosa. D labyrinthifonnis Gorgonia sp. and Millepora sp. and \nsponges Aplysinafidva, Amphiniedon compressa and Ircinia sp. are present. Acropora \npabnata is present on the headlands to the east and south. \nThere are scattered boulders and broken pieces of bedrock offshore, most of which are \ncolonized by corals and sponge species. \nEFTA00802712\n", "char_count": 902}, {"efta_number": "EFTA00802602", "page_number": 111, "text_content": "Figure 4. All of the ESA corals in the bay were mapped by the surveyor in order to avoid \nhem with the dock design. \nFigure 5. Benthic Habitats in the southeastern embayment \nEFTA00802713\n", "char_count": 188}, {"efta_number": "EFTA00802602", "page_number": 112, "text_content": "VII. \nMITIGATION WORK PLAN \nCORALS \nPrior to the start of the relocation project the footprint of the docks and the predicted \nimpact zone will be marked on the seafloor using small pin flags. Any coral or boulder \nwhich partially extends into this zone will be relocated. \nIndividual corals that are attached to the near shore hardbottom will be removed with \nchisels. These corals will be collected in bins and carried to recipient site. These corals \nwill be fixed in placed in their new locations with two-part underwater epoxy, which sets \nin a matter of minutes (Splashzone). The base of the coral will be carefully cleaned with \na wire brush and the new substrate will be cleaned to remove algae and any other material \nwhich might interfere with the adhesion of the epoxy or cement. The coral will be \ncarefully placed and held until the epoxy starts to set. \nDivers will then collect those corals and sessile invertebrates that colonize cobbles and \nrocks within the dock footprint that are of a small enough size to allow hand carrying. \nThese are cobbles and boulders that are in a range of I ft2 to 2.5ft2. These corals are \nusually growing on pieces of coral rubble. Divers will wear disposable gloves while \nworking with corals minimize touching live tissue and keep any coral that appear \nunhealthy or diseased away from other corals. Corals which appear to be diseased will be \nmarked, and not transplanted to the recipient area to minimize the potential of the spread \nof disease to the recipient site. The diseased corals will be photographed and will be \naddressed in the baseline report for the transplant identifying the size and location of each \nindividual colony. If a coral is handled that appears unhealthy or diseased gloves will be \nchanged prior to working with other corals. The I ft2 to 1.5112 corals will be placed in \nunderwater bins and carried by divers to the recipient sites. The larger corals will be \nplaced directly on a transport tray. Once the tray is full i\n... [truncated, 3340 chars — for the full page use /api/corpus/document/EFTA00802602/112 or ?id=EFTA00802602&page=112]", "char_count": 3340}, {"efta_number": "EFTA00802602", "page_number": 113, "text_content": "lifted and walked to the recipient site. When attaching the corals to the lift bags ropes \nwill be placed so that they avoid live coral tissue. If necessary, a plate may be placed \nunderneath corals so that it lifted without the tissue being impacted by the ropes. The \ncoral boulders and larger rocks will be placed in the recipient site in such a fashion that \nthe rock is stable which may require some excavation into the sand to create a depression \nfor the previously buried part of the rock. Care will be taken so that these transplanted \nmaterials will not impact existing organisms at the recipient site. Care will be taken to \nplace corals in the same orientation and depth as they were in their original locations. \nCOMPENSATORY MITIGATION \nTo mitigate for impacts that cannot be avoided a special reef building system will be \nplaced beneath the southeastern dock. This system serves not only as a wave attenuator \nby provides additional substrate to allow for colonization beneath the dock. Grated \ndecking will be used on the dock to facilitate light transmission. \n....\n.2 0\n0.\n.. \nID • \n• \n% \n(i),(;) \n• \n• \n1•`); II \n< • )0 • \n• \n• ...a \n....,• • \n, \nIlt•MB \n4 \n• v za \n.,•• \n• \n• \n•I • >0 \nA% I \n• se•Ni. I \n,-..\\, _ \n4a< • \n* \n• \nOf \n• \nit • \nA \n• \n? \n• ..•\n\\ t o:F\\\n• \n• \ni\ni*•>• \nP r•) \n4 \n•e.4 • • \n„•, .... \n• :e.-. • \n„•,... \nP \n• \n1•(•> 4\nW \n• \nIN • \nY• \n• \n,..\n.../ \nO C ••  * \n• \n• \n• \n/ \n... \nSO \n;te\\ \nOl t \n• \n• IP • \nCi • N\n. \n. \n• ( • , it •< • \n2 • 2. •• )2 • \nRe,  •• >so \n• \nfa ••  >It \n• \n*< ••  >ft \n• \n•C i>• \n• /„ \ne \n, \n, ••./., \n• \ni %NJ, • \n.0 N.V.. \n, 0,// \n• \n, ‘• \n, \n• \n* < •,,2 \\•,)24 10/•\\*\n.,•*<‘ •/•<,•,,\n, ,<,slys< \n• )1•<,,,Ocney• \n,* \n \n \n. \nII (1171‘1{<1• N ih••••4 • ft /No.:.)11 • if <,•>* • Nilie•Nli • iiii)iii\", \n...• \n. • \n. • \n... \n. • \nNI \nN.' \na l\n \n• \n• SAS'. \na • \nanal\n. \n• a ..11.1 a a \n•\nt......„.... . \nwe X 3/4' X1 1/2' FRP 50% OPEN DECK GRATING \n12' FRP C-CHANNEL JOISTS & BEAMS \nWAVE ATTENUATION \nEEF MAKING SYSTEM \nSETTING CLAMP\n... [truncated, 2109 chars — for the full page use /api/corpus/document/EFTA00802602/113 or ?id=EFTA00802602&page=113]", "char_count": 2109}, {"efta_number": "EFTA00802602", "page_number": 114, "text_content": "VIII. \nMAINTENACE PLAN \nDivers will survey the recipient site on a bi-weekly basis for the first 2 months after the \ntransplant to ensure that the corals have not become unattached or shifted. If for any \nreason the corals become loose or move they will be re-situated and or reattached. After \nthe first two months the corals will be monitored on a monthly basis for the first year and \nthen on a bi-monthly basis for the following 2 years then every 6 months for year 4 and 5 \nafter the transplant. During each monitoring event divers will make sure that the rocks \nhave remained stable and not shifted, and that corals and sponges have not come loose. \nIf necessary corals will be repositioned and re-attached. \nIX. \nECOLOGICAL PEFORMANCE STANDARDS \nThe object of this mitigation is to minimize impact to benthic resources which provide \nhigh quality habitat to marine species. In order to objectively evaluate the mitigation \nproject, ecological performance standards must be established. The performance \nstandards will include viability of the transplanted corals and sponges and relocated \nseagrass. \nIt is the intent of this transplanting program to obtain a minimum of 80% survival of the \ntransplanted corals and sponges. Great St. Jim, LLC is committed to put forth the \ngreatest effort to see that the relocation is successful and that they obtain the greatest \npotential survival of transplanted organisms. \nX. \nMONITORING REQUIREMENTS \nMonitoring the compensatory mitigation project site is necessary to determine if the \nproject is meeting its performance standards, and to determine if adaptive measures are \nnecessary to ensure that the project does meet its objectives. \nAs per the guidelines set forth in §230.96 Monitoring the mitigation project will be \nmonitored for a minimum period of 5 years. \nIn total twenty-five transplanted corals at each site will be marked with numbered tags for \nmonitoring. The tags will be maintained throughout the 5 year monitoring period. The \nco\n... [truncated, 2945 chars — for the full page use /api/corpus/document/EFTA00802602/114 or ?id=EFTA00802602&page=114]", "char_count": 2945}, {"efta_number": "EFTA00802602", "page_number": 115, "text_content": "activities related to construction or resort or due to natural phenomena (such as wide \nspread bleaching). If the corals appear to be stress due to the transplant, the reason for \nthe demise will be assessed, poor positioning, sand scour, light attenuation, etc. If \nnecessary, the coral or sponge will be repositioned. Every effort will be made to save the \ncoral or sponge. If the degradation is seen both in the project area non-transplanted \ncorals and the transplanted corals, the reason will be assessed for the demise. If the \nsource of the impact cannot be readily assessed by the monitoring being undertaken, the \nmonitor will work with NMFS and VI Fish and Wildlife and the other resource agencies \nto expand the monitoring so that the source of the impact can be identified. \nIn order to monitor the success of the reef creating system under the southeastern dock, it \nwill be monitored concurrently with the corals and a detailed photographic recorded will \nbe kept depicting colonization, survival and growth of coral and sponge species. \nThe monitoring results will be delivered to the agencies within two weeks of the \nmonitoring period. If negative impacts are noted the agency will be notified by phone \nand by email within 24 hours. The agencies will be apprised of what steps are being \ntaken to identify the impact and rectify the problem. The agencies will be provided a \ndetailed report on the steps that are taken and the results of those actions. \nXI. \nLONG TERM MANAGEMENT PLAN \nGreat St. Jim, LLC is committed to the survival of the transplanted coral species and the \nsuccess of the reef building system and will make every effort to ensure that both are a \nsuccess. \nXII. \nADAPTIVE MANAGEMENT PLAN \nIn the event that there are difficulties with the mitigation or if the mitigation is deemed \nunsuccessful as planned, Great St. Jim, LLC is prepared to take additional steps to see \nthat compensatory mitigation goal is achieved. If necessary, extended monitoring and \nmaint\n... [truncated, 2798 chars — for the full page use /api/corpus/document/EFTA00802602/115 or ?id=EFTA00802602&page=115]", "char_count": 2798}, {"efta_number": "EFTA00802602", "page_number": 116, "text_content": "No. 50-1, 14 February 2005, SUBJECT: Guidance on the Use of Financial Assurances, \nand Suggested Language for Special Conditions for Department of the Army Permits \nRequiring Performance Bonds. \nEFTA00802718\n", "char_count": 208}, {"efta_number": "EFTA00802602", "page_number": 117, "text_content": "APPENCIX C \nENVIRONMENTAL AND WATER QUALITY MONITORING PLAN \nFOR THE \nCONSTRUCTION OF A TEMPORARY BARGE LANDING \nAND TWO DOCKS ON \nGREAT ST. JAMES, U.S. VIRGIN ISLANDS \nINTRODUCTION \nThe following is the proposed monitoring program for the construction of a temporary \nbarge ramp and two docks on the island of Little St. James. The purpose of this \nmonitoring plan is to evaluate and minimize the impact of the proposed construction on \nmarine water quality and the benthic community. \nGreat St. Jim, LLC is seeking to construct two docks, one of which is a combination \ndock/ barge landing, and a temporary barge landing to provide access to Great St. James \nIsland. \nThe marine construction will consist of the vibra-hamming or socketingof piles and the \nplacement of docks. The impact pile driving or vibra-hammer driving will have a \nminimal potential for creating turbidity. However, where rock encountered it is possible \nthat piles may need to be socketed. Pile socketing greatly increases the potential for \nturbidity, and creates large volumes of rock flour. Based on observations in the field a \nnumber of piles may require socketing. \nTurbidity barriers (silt curtains) will be installed surrounding all pile driving/socketing \nactivities. The curtains will serve not only to maintain turbidity created by pile driving \nbut will also contain floating debris within the project area. The turbidity barriers will be \nproperly installed and will extend to within 1 ft. of the seafloor where piles are driven. If \npiles require socketing, curtains will extend to the seafloor and a double set will be \ndeployed. \nESTABLISHMENT OF BASELINE CONDITIONS AND SAMPLING POINTS \nPrior to the start of any construction activities a baseline of existing conditions will be \nassessed. Baseline samples will be conducted over a two-month period. The sampling \nlocations have been established to encompass the area most likely to be potentially \nimpacted during construction. The baseline samples sites ar\n... [truncated, 2594 chars — for the full page use /api/corpus/document/EFTA00802602/117 or ?id=EFTA00802602&page=117]", "char_count": 2594}, {"efta_number": "EFTA00802602", "page_number": 118, "text_content": "DURING CONSTRUCTION \nMARINE WATER QUALITY MONITORING \nDuring the construction of the docks water quality at the stations in the vicinity of the \nwork will be sampled on a daily basis. Three water samples will be taken 10 meters \noutside the turbidity barriers surrounding the area of work. Two control samples shown \nin Figures 1 and 2 will also be sampled. Water quality will be secchi depth and turbidity \nexpressed as NTUs. \nACTION TRIGGERS \nDuring construction if the water samples show NTUs, or secchi disk readings outside the \nallowable regulatory limits, the reviewing agencies and the applicant will be notified, in \nwriting within 24 hours of the parameter exceedance. The baseline samples will be \nutilized to determine if other parameters are elevated above normal background levels. \nControls will also be used to determine if the readings are a result of natural phenomena \nor if the monitoring sample is elevated above the ambient background as a result of the \nconstruction project. \nIf it is determined that the elevated turbidity is the result of the construction project, the \nsource of the elevated turbidity will be identified and methods worked out to abate the \ndegradation. Someone will be on hand at the construction site at all times who has the \nauthority to implement sediment control devices or other remedial actions, so that \nproblems can be resolved as quickly as possible. Once the source of the impact is \nidentified, steps will be taken immediately to abate that impact. The action that was taken \nto resolve the issue, as well as confirmatory sampling data that the degradation has been \nresolved will be included within the written report to the agencies and GSJ. A monitor \nwill be on site throughout the day during construction activities to ensure that turbidity \nbarriers are adequate maintain and that escaping sediments do not go unabated. \nREPORTING OF DATA \nIn the event of any emergency or noted degradation in any of the water quality \nparameters above \n... [truncated, 2357 chars — for the full page use /api/corpus/document/EFTA00802602/118 or ?id=EFTA00802602&page=118]", "char_count": 2357}, {"efta_number": "EFTA00802602", "page_number": 119, "text_content": "Figure 1. Christmas Cove Monitoring Stations and Controls \nFigure 2. Southeastern monitoring stations and controls \nEFTA00802721\n", "char_count": 129}, {"efta_number": "EFTA00802602", "page_number": 120, "text_content": "APPENDIX D \nVIRGIN ISLANDS TREE BOA MITIGATION PLAN — GREAT ST. JAMES ISLAND \nACCESS DOCK CONSTRUCTION \nIntroduction \nLittle St. James island habitat for the Virgin Islands Tree Boa, Epicrates monensis granti and two tree \nboas were seen in 2006 on the island. The tree boa was listed as Federally Endangered in 1979 and the \nVirgin Islands Endangered and Indigenous Species Act also protects this species. The tree boa is \nnocturnal and arboreal, the snake forages at night and seeks shelter during the day. The snakes seek \nrefuge in termite nests, debris piles and under rocks during the day. While the snakes' habitat is listed \nas dry forests, coastal scrub, moist woodlands, mangroves and rocky cliffs, the snakes can occur in any \nhabitat that allows for off ground movement. The structure of the habitat is more important than the \nspecies composition; the dock access had some structure which might be adequate for these species. \nThere is an abundant prey base of lizards on the cay, and there is refugia present; logs and rock piles. \nFish and Wildlife states that the snakes are extremely difficult to locate even for an experienced snake \nbiologist, and therefore it must be assumed that the endangered species is present, especially when \nsuitable habitat and refugia are present. Tree boas are known to be present the applicant will make \nevery effort not to take (harass, harm, pursue, shoot, wound, kill, trap, capture, or to attempt to engage \nin such conduct) any of these endangered species. The dock access way will be cleared by hand and \nrock piles will be dismantle by hand. All personnel involved in site clearing and site construction will be \ninformed of the potential presence of the snake, and the importance of protecting the snakes. \nPhotographs of the tree boas will be shown to all workers as well as a description of their behavior and \nhabitat. All workers must acknowledge that they understand the importance of protecting this rare and \nendangered species. The si\n... [truncated, 2481 chars — for the full page use /api/corpus/document/EFTA00802602/120 or ?id=EFTA00802602&page=120]", "char_count": 2481}]}