{"efta_number": "EFTA00799455", "page_count": 3, "url": "https://epstein-data.com/EFTA00799455", "pdf_url": "https://epstein-data.com/pdf/EFTA00799455.pdf", "pages": [{"efta_number": "EFTA00799455", "page_number": 0, "text_content": "DARREN K. INDYKE\nDarren K. Indvke PLLC.\nNew York, New York 10022\nTelephone\nTelecopier\nEmail:\nJuly 20, 2018\nVIA Email -\nMr. Brian Walden\nDirector of Operations\nProSolar America, LLC\nDear Mr. Walden:\nI am general counsel to Great St. Jim, LLC and LSJE, LLC (\"GSJ\"), which own and operate\nGreat St. James Island in the U.S. Virgin Islands.\nI understand that GSJ purchased a 310.8 kWh solar power system from ProSolar Systems,\nLLC (\"ProSolar\") in November 2016 for a purchase price of $192,211. Included as part of that\npurchase were 12 self-contained Acquion Maintenance Free Salt Water Battery Modules for an\naggregate price of $154,338, each being sold with a 3-year warranty from ProSolar, which will\nnot expire before November 2019. I also understand that GSJ has also been paying ProSolar in\nthe amount of $350 per month for monthly maintenance/service calls which have been taking\nplace since April 2017 and that after Hurricanes Irma and Maria hit the U.S Virgin Islands in\nSeptember 2017, GSJ paid in excess of $111,000 to troubleshoot and bring the solar power\nsystem into full operation.\nDespite the purchase of a specially designed solar power system that was to provide Great\nSt. James Island with continuous power to meet its energy demands (which GSJ fully disclosed in\nadvance to ProSolar) without interruption on a full-time basis, and was warranted for three years,\nthe power system has been failing regularly, shutting down like clockwork every morning at\napproximately 5AM. This then required GSJ's representative to travel to the island to turn off\nisland-wide power drawing from the system, so that the system could recharge. Once the system\nrecharged, it then had to reboot completely before GSJ's representative was able to reconnect\npower to Great St. James. Obviously, this was not what was proposed by ProSolar, not what was\nagreed to and certainly not what GSJ paid almost $200,000 for ProSolar to deliver. Moreover,\nafter more than year of paid monthly service calls and an additional $111,000 of replacement\nand repair work to bring the solar power system into full operation over the past several months,\nand despite ProSolar's knowledge of the existing conditions on Great St. James Island and\ncontinued reports to ProSolar of increasingly regular low voltage system failures, only recently\nEFTA00799455\n", "char_count": 2332}, {"efta_number": "EFTA00799455", "page_number": 1, "text_content": "Mr. Brian Walden\nDirector of Operations\nJuly 20, 2018\nPage 2 of 3\ndid ProSolar tech personnel open the battery modules to examine the circuit boards contained\ntherein. ProSolar advised that only after it examined these circuit boards which supply the\ncharging and discharging controls for each battery module did it discover that several were\ncorroded. It now believes that this is the source of the problems with the system.\nTwo weeks ago, ProSolar attempted to implement what it maintains is a solution to the\nrecurring problems experienced on Great St. James. The solution was to effectively bypass the\ncircuit boards, and in the process, eliminate whatever functionality they should have provided\nhad they been functioning properly. Although a full assessment needs to be completed\nconcerning the extent to which the work recently performed by Pro Solar's technicians has\nimproved the system's wholesale performance failures, improvement will not resolve the issue\nor satisfy ProSolar's contractual obligations to GSJ. A system that does not fail quite as often as\nit used to is no substitute for a fully operational, properly programmed and integrated solar\nbattery system that functions as specified and has no defects in its design, circuit boards,\nprogramming, control systems, or otherwise. GSJ paid ProSolar in full for, and ProSolar is\nobligated to provide to GSJ nothing less than, a solar power system with the full functionality you\ncontracted to deliver and warranted for three years. Moreover, the three-year warranty that GSJ\npaid for has no value at all if replacement parts for the system cease to be available during the\nwarranty period, which is what now appears to be the case.\nNor is it reasonable to blame your contractual breaches on damaged circuit boards in the\nsolar batteries that you claim are the result of environmental conditions on Great St. James\ncreated by Hurricanes Irma and Maria. ProSolar has made regular service calls to Great St. James\nafter the Hurricanes hit the Island, for which it was paid in each instance by GSJ. It was well aware\nof those conditions on Great St. James, but never once during any of the numerous service visits\nit made to Great St. James after September 2017 did ProSolar examine the circuit boards. Thus,\nif indeed the damaged circuit boards played a role in the system failures, ProSolar's own gross\nnegligence in servicing the solar battery system eliminated any possibility of early detection or\ndamage prevention. It was only after GSJ complained of the continuous, regular system failures\nand only after numerous on site visits that ProSolar then finally examined the circuit boards. But\nby then, the damage was done, and now no replacement boards are available.\nMoreover, it is our understanding that the system was never properly programmed and\nintegrated and there have always been incompatibility issues with respect to the circuit boards\nwhich ProSolar blames for the system failures. This defect in ProSolar's design of the integrated\nsystem it contracted to deliver was a problem from the very beginning that was never resolved.\nOnce again, this is not what GSJ paid for and not what ProSolar contracted to deliver and\nwarranted to GSJ.\nEFTA00799456\n", "char_count": 3230}, {"efta_number": "EFTA00799455", "page_number": 2, "text_content": "Mr. Brian Walden\nDirector of Operations\nJuly 20, 2018\nPage 3 of 3\nProSolar must take full responsibility for its defective and non-conforming system and\nprovide GSJ with the system that actually functions and performs as agreed, including as\nnecessary, by replacing the battery system in its entirety. Otherwise, ProSolar must provide GSJ\nwith a full refund of all amounts paid to ProSolar in connection with the system, including,\nwithout limitation, the $192,211 paid for the system, the $111,000 paid to bring the system into\noperation and the $350 per month of ProSolar's service calls that never properly diagnosed or\nfixed the system's problems.\nPlease coordinate with Mr. Richard Kahn to advise how you will fully and properly resolve\nProSolar's contractual breaches.\nThis letter is without prejudice to the rights and claims of GSJ against ProSolar, including,\nwithout limitation, the right to bring legal action against ProSolar to recover all amounts incurred\nby GSJ in connection with the defective and non-conforming solar power system delivered by\nProSolar, consequential damages and attorneys fees and costs, all of which rights and claims are\nhereby expressly reserved.\nVery truly yours,\n/s/ Darren K. Indyke\nDarren K. Indyke\nEFTA00799457\n", "char_count": 1254}]}