{"efta_number": "EFTA00799453", "page_count": 2, "url": "https://epstein-data.com/EFTA00799453", "pdf_url": "https://epstein-data.com/pdf/EFTA00799453.pdf", "pages": [{"efta_number": "EFTA00799453", "page_number": 0, "text_content": "DARREN K. INDYKE\nDarren K. Indyke, PLLC\n575 Lexington Avenue, 4th Floor\nNew York, New York 10022\nTelephone:\nTelecopier:\nEmail:\nJune 25, 2018\nVIA Email -\nMr. Brian Walden\nDirector of Operations\nProSolar America, LLC\nDear Mr. Walden:\nI am general counsel to Great St. Jim, LLC and LSJE, LLC (\"GSJ\"), which own and operate\nGreat St. James Island in the U.S. Virgin Islands.\nI understand that GSJ purchased a 310.8 kWh solar power system from ProSolar Systems,\nLLC (\"ProSolar\") in November 2016 for a purchase price of $192,211. Included as part of that\npurchase were 12 self-contained Acquion Maintenance Free Salt Water Battery Modules for an\naggregate price of $154,338, each being sold with a 3-year warranty from ProSolar, which will\nnot expire before November 2019. I also understand that GSJ has also been paying ProSolar in\nthe amount of $350 per month for monthly maintenance/service calls which have been taking\nplace since April 2017 and that after Hurricanes Irma and Maria hit the U.S Virgin Islands in\nSeptember 2017, GSJ paid in excess of $111,000 to troubleshoot and bring the solar power\nsystem into full operation.\nDespite the purchase of a specially designed solar power system that was to provide Great\nSt. James Island with continuous power to meet its energy demands (which GSJ fully disclosed in\nadvance to ProSolar) without interruption on a full-time basis, and was warranted for three years,\nthe power system now fails regularly, shutting down like clockwork every morning at\napproximately 5AM. This then requires GSJ's representative to travel to the island to turn off\nisland-wide power drawing from the system, so that the system can recharge. Once the system\nrecharges, it then must reboot completely before GSJ's representative can reconnect power to\nGreat St. James. Obviously, this was not what was proposed by ProSolar, not what was agreed\nto and certainly not what GSJ paid almost $200,000 for ProSolar to deliver. Moreover, after more\nthan year of paid monthly service calls and an additional $111,000 of replacement and repair\nwork to bring the solar power system into full operation over the past several months, and\ndespite ProSolar's knowledge of the existing conditions on Great St. James Island and continued\nEFTA00799453\n", "char_count": 2260}, {"efta_number": "EFTA00799453", "page_number": 1, "text_content": "Mr. Brian Walden\nDirector of Operations\nJune 25, 2018\nPage 2 of 2\nreports to ProSolar of increasingly regular low voltage system failures, only recently did ProSolar\ntech personnel open the battery modules to examine the circuit boards contained therein that\nsupply the charging and discharging controls for each battery module to discover that several\nwere corroded. This is what ProSolar has advised it now believes is the source of the problem.\nProSolar has proposed a solution to modify the solar power system it designed for,\nsupplied to, and installed on Great St. James and has been servicing. It proposes to bypass the\ncircuit boards contained in each of the 12 battery modules in the system and allow the control\nfunctions that were to be performed by those circuit boards now to be performed by the existing\ninverters of the system which were also supplied, installed and serviced by ProSolar. ProSolar\nproposes to reprogram those inverters to assume the functionality of the bypassed circuit\nboards. It believes that the transfer of the control functions from the circuit boards to the\ninverters will eliminate the low voltage system failures Great St. James has been experiencing\nand will allow the system to function as contractually required and warranted.\nWe appreciate your efforts to diagnose the catastrophic failures with the solar power\nsystem you designed, supplied, assembled and have been servicing. And we are more than\nwilling to allow you at your sole cost and expense to attempt to fix the problem along the lines\nthat you propose. However, please be advised that should your proposed solution fail, we insist\nthat you honor your obligation to deliver to Great St. James Island a solar power system with the\nfull functionality you contracted to deliver and warranted by replacing the system with one that\nactually performs as agreed, or provide GSJ with a full refund of all amounts paid to ProSolar in\nconnection with the system, including, without limitation, the $192,211 paid for the system, the\n$111,000 paid to bring the system into operation and the $350 per month of ProSolar's service\ncalls that never properly diagnosed or fixed the system's problems.\nPlease advise when you will begin the necessary work to implement your proposed\nsolution, so that appropriate arrangements can be made on Great St. James Island.\nThis letter is without prejudice to the rights and claims of GSJ against ProSolar, including,\nwithout limitation, the right to bring legal action against ProSolar to recover all amounts incurred\nby GSJ in connection with the solar power system delivered by ProSolar, consequential damages\nand attorneys fees and costs, all of which rights and claims are hereby expressly reserved.\nVery truly yours,\n/s/Darren K. Indyke\nDarren K. Indyke\nEFTA00799454\n", "char_count": 2800}]}