{"efta_number": "EFTA00775455", "page_count": 2, "url": "https://epstein-data.com/EFTA00775455", "pdf_url": "https://epstein-data.com/pdf/EFTA00775455.pdf", "pages": [{"efta_number": "EFTA00775455", "page_number": 0, "text_content": "From: \"Stephen Caplinger\" <\nTo: \"Gary Kerney\"\" <\nCe: <\n, \"Jeffrey Epstein\"\" <jeevacation@gmail.com>\nSubject: FW: Revised Master Budget\nDate: Fri, 05 Jun 2009 21:38:29 +0000\nAttachments: master_suite_06-05-09_final_Sheet1.pdf; master_suite_06-05-09_final_Master_Suite.pdf\nInline-Images: image001.jpg\nGary:\nSee below from Jeffrey\nSTEPHEN M. CAPLINGER\nVice President Design & Planning\nLANDMARK LAND COMPANY\n4908 Brooksview Circle\nNew Albany, Ohio 43054\nFrom: Jeffrey Epstein [mailto:jeevacation@gmail.com]\nSent: Friday, June 05, 2009 5:31 PM\nTo: Stephen Caplinger\nSubject: Fwd: Revised Master Budget\ncan you send this on to gary\nForwarded message\nFrom: curtis\nDate: Fri, Jun 5, 2009 at 5:22 PM\nSubject: Revised Master Budget\nTo: JEE <jeevacation@gmail.com>, Brice Gordon\nDarren Indyke\nEFTA00775455\n", "char_count": 795}, {"efta_number": "EFTA00775455", "page_number": 1, "text_content": "-\nJeffrey as per your request I did the entire Master bedroom budget from scratch with new take\noffs.\n⚫. I specified as much as I could based on the existing brands of plumbing and lighting\nequipment.\n⚫ I used all LSJ labor including Gary for the electrician and Brian for the plumber - Glidden\nagreed to sign off on Gary's work, I have not got a professional to sign off for the plumbing\nas of yet.\nGensler has not reviewed the HVAC system I specified with Dave Gott, but I'm confident\nthat their specifications will not be much different.\n• Gensler has not specified the roof yet and I am not entirely sure theirs will be equivalent,\nthe one specified in this budget is based on the Office Pavilion, which in my opinion was\nover designed.\n⚫ The paint finish is a simple in house job and does not account for a Pinto or designer look.\nNo paint in the bedroom because this requires some designer repairs.\n• All stone floors and walls are Coral stone.\n• Existing bedroom floor to remain but I have allowed for refinishing.\n• All lighting and switching in the Bedroom will remain as is.\n⚫ I HAVE NO SHIPPING included in this budget, I did not have time to run it all past Emad,\nwhich I will do next week.\nCurtis\nEFTA00775456\n", "char_count": 1223}]}