{"efta_number": "EFTA00764070", "page_count": 2, "url": "https://epstein-data.com/EFTA00764070", "pdf_url": "https://epstein-data.com/pdf/EFTA00764070.pdf", "pages": [{"efta_number": "EFTA00764070", "page_number": 0, "text_content": "From: \"Stephen Caplinger\" <\nTo: \"Jeffrey Epstein'\".\nCe: \"Gary Kerney\"\"\nSubject: Office Pavilion Entry Site Plan\nDate: Mon, 22 Feb 2010 17:38:20 +0000\nAttachments: scan_20100222_0001.PDF\nInline-Images: image001.jpg\n\"\"Andrew Levy\"\nAttached is an updated site plan for the Office/Master Bedroom area.\nThis plan does not have a roadway connection all the way around as in the previous plans.\nThis is a \"flat terrace” plan and the main terrace area is the same width as the master bedroom building.\nThe stairway has been moved more to the west.\nThe lower courtyard in front of the office breezeway has been enlarged and the walls are approximately 6' ht.\nAll walls are flat & stepped instead of being sloped.\nAlso, I have shown the new stair & walk connection from the kitchen.\nPlease review and let me know if you have any thoughts.\nalso sending to Andrew and he can do a SketchUp 3D drawing if you think it's ready for that step.\nWe also will stake it out in the field for your next visit.\nRegards,\nSTEPHEN M. CAPLINGER\nVice President Design & Planning\nLANDMARK LAND COMPANY\n4908 Brooksview Circle\nNew Albany, Ohio 43054\nEFTA00764070\n", "char_count": 1131}, {"efta_number": "EFTA00764070", "page_number": 1, "text_content": "EFTA00764071\n", "char_count": 13}]}