{"efta_number": "EFTA00744181", "page_count": 1, "url": "https://epstein-data.com/EFTA00744181", "pdf_url": "https://epstein-data.com/pdf/EFTA00744181.pdf", "pages": [{"efta_number": "EFTA00744181", "page_number": 0, "text_content": "From:\nTo: \"jeevacation@gmail.com\" <jeevacation@gmail.com>\nSubject: GII update\nDate: Mon, 22 Nov 2010 19:32:26 +0000\nJeffrey,\nfor your approval,.\nI am planning to do engine runs tomorrow and cockpit checks, if all goes well, I plan to test fly Wed morning, then\ncontinue to NY later that day.\nMaintenance invoice was\n$ 213,424.78\nI'm in the process of receiving a credit of $ -7,959.00\nfinal wire estimate is $205,465.78\nplease advise if this is approved?\nRich, this would be considered aircraft improvements;\n-Update Universal FMS software including $16,875.00\n-High speed data loader (replaces floppy drive to USB port) $10,350.00\nThe FMS upgrade was necessary, since no loaners or parts where available for our current FMS software. previous\ndata load was a floppy drive,.\nhigh cost Repair items breakdown:\n-replace cockpit DV window: $11,635.18\n-replace cockpit L/H side window: $14,429.05\n-replace cockpit R/Hwindow: $14,429.05\n-repair R/H spoiler board due to corrosion: $6,616.00\n-replace L/H spoiler board due to corrosion: $8,496.00 (beyond repair limits).\n-Nose landing gear corrosion on strut: $10,815.00\n-Xray rear pressure Bulk head for integrity $7,500.00\n-inspect fuselage penetration integrity $9,000.00\n-replace emergency exit Ni-cad battery's $6,788.00\n-install new Bose headset jacks and repair cockpit intercom system $5,400.00\nflat rate of inspection $87,895.00\nThere where 279 miscellaneous items for remaining cost:\nour budget was $250K, project completion price: $257,372.28 total including the $27,225.00 for FMS upgrading.\nRich, there will be some additional small cost of items that where not Invoiced at delivery, to be paid at later date,\nthank you,\nLarry\nEFTA00744181\n", "char_count": 1697}]}