{"efta_number": "EFTA00736014", "page_count": 4, "url": "https://epstein-data.com/EFTA00736014", "pdf_url": "https://epstein-data.com/pdf/EFTA00736014.pdf", "pages": [{"efta_number": "EFTA00736014", "page_number": 0, "text_content": "From: Warwick Wicksman <\nTo: Jeffrey Epstein <jeevacation@gmail.com>, Ken-Hao Hsu\nCc: Gary Kerney <\n>, Doug Schoettle\nSubject: RE: LSJ Update\nTom Sze\n>, Bryan Oakes\nDate: Fri, 06 Aug 2010 15:41:10 +0000\nAttachments:\nview_from_garden_towards_screening_room_.pdf; 100715_040.pdf\nHi Jeffrey,\nWe will continue to work on these items. I sent the sketches to Gary and Doug as a preview, to get\ncomments before issuing formally to you for review. The purpose of the 3D views and the plans is to show\nthe revised programmatic layout-circulation, plans, and the relationship between areas. The \"look and\nfeel\" of the spaces is something we would focus on once the layouts are approved.\nWe can prepare view showing the arched window. Our initial thought was that it may not relate to the rest\nof the architecture. But we may have ruled it out prematurely, and we will get prepare a sketch with it for\nreview. We will send that as soon as it is ready.\nOur current thought for the screening room was that it would be viewed as a \"garden wall\" from the upper\nlevel. Please see the attached pdf, and image of similar condition in the existing garden area. The wall is\nabout 8' tall on the garden side, and can be further masked with a lower planter and landscaping, similar to\nthe current attached photo. As we move forward, we will also study this with a visible roof, similar to the\nmain residence, as we discussed on the Island.\nThanks,\nWarwick\nWarwick Wicksman, AIA\nPrincipal\nGensler\n2500 Broadway\nSuite 300\nSanta Monica, California 90404\nUSA\nFrom: Jeffrey Epstein [mailto:jeevacation@gmail.com]\nSent: Thursday, August 05, 2010 8:03 PM\nEFTA00736014\n", "char_count": 1639}, {"efta_number": "EFTA00736014", "page_number": 1, "text_content": "To: Ken-Hao Hsu\nCc: Gary Kerney; Doug Schoettle; Warwick Wicksman; Tom Sze; Bryan Oakes\nSubject: Re: LSJ Update\nI would like to see arch kitchen windows., less long straight stair cases. more romantic. roof for screening roon,\nOn Thu, Aug 5, 2010 at 8:25 PM, Ken-Hao Hsu\nTeam,\nTo follow up Warwick's email, please see attached revised images for your reference.\nwrote:\nThese images reflect smaller screening room.\nThanks,\nKen-Hao Hsu LEED AP\nAssociate\nGensler\n2500 Broadway\nSuite 300\nSanta Monica CA 90404\nFrom: Gary Kerney [mailto:\nSent: Thursday, August 05, 2010 4:30 PM\nTo: Warwick Wicksman; Doug Schoettle\nCe: Tom Sze; Bryan Oakes; Ken-Hao Hsu; Jeffrey Epstein\nSubject: RE: LSJ Update\nWarwick\nThese look good, we'll understand all the stairs in the screen complex better when we see the 3D renderings, as well the scale of the\nscreening room.when the renderings are ready send to all.\nThanks\nGary\nEFTA00736015\n", "char_count": 914}, {"efta_number": "EFTA00736014", "page_number": 2, "text_content": "From: Warwick Wicksman [mailto:\nSent: Thu 8/5/2010 6:17 PM\nTo: Gary Kerney; Doug Schoettle\nCc: Tom Sze; Bryan Oakes; Ken-Hao Hsu\nSubject: LSJ Update\nGary,\nPlease review these draft sketches, and let me know if you need me to add any more info before you present them to Mr. Epstein this\nweekend! I have not sent them to him yet. Ken-Hao will be sending you the 3D views later today - as soon as they are ready. I\nhave attached the plan views only.\nWith these sketches, we have exhausted the re-design services approved Work Authorization 1. These are intended to be programmatic\nconceptual drawings. When we move forward with the next phase, we will refine the layouts, and get into the details of the design.\nPlease note:\n•\nThe layouts are based upon previous Option 1, sent 7/28/10.\n•\nWe have revised the exterior stairs and circulation per our discussions.\n•\nWe have provided options for the Kitchen windows.\nWe have revised the road, to reflect the corrected site plan we received yesterday, 8/4/10, with the relocated service road. Note,\nthis did impact the previous layout a bit.\nI added the door at the north end of the east wall of the kitchen addition, per my conversation with Doug this morning.\nThe two \"partial site plans\" attached reflect the two different screening room sizes. One has a 30' screen, per our original design. The\nother has a 25' screen, as I discussed with Gary. I recommend someone mock up the two sizes for Mr. Epstein's review, perhaps in the\nliving room, to confirm the desired screen size. The screening room area is not completely laid out, as we need to dig into the design of\nthat area in greater detail, once we set the location and screen size.\nIf this layout is approved, we can prepare a new proposal to provide complete construction documents, based on this layout, including\nall of our consultants. If we need to make minor adjustments, we can accommodate that as we move forward. If we need to make\nmajor adjustments, I can prepare a new proposal for additional conceptual re-design services.\nPlease call me or email me if you have any questions!\nThanks,\nWarwick\nWarwick Wicksman, AIA\nPrincipal\nEFTA00736016\n", "char_count": 2153}, {"efta_number": "EFTA00736014", "page_number": 3, "text_content": "Gensler\n2500 Broadway\nSuite 300\nSanta Monica, California 90404\nUSA\nThe information contained in this communication is\nconfidential, may be attorney-client privileged, may\nconstitute inside information, and is intended only for\nthe use of the addressee. It is the property of\nJeffrey Epstein\nUnauthorized use, disclosure or copying of this\ncommunication or any part thereof is strictly prohibited\nand may be unlawful. If you have received this\ncommunication in error, please notify us immediately by\nreturn e-mail or by e-mail to jeevacation@gmail.com, and\ndestroy this communication and all copies thereof,\nincluding all attachments.\nEFTA00736017\n", "char_count": 647}]}