{"efta_number": "EFTA00728708", "page_count": 1, "url": "https://epstein-data.com/EFTA00728708", "pdf_url": "https://epstein-data.com/pdf/EFTA00728708.pdf", "pages": [{"efta_number": "EFTA00728708", "page_number": 0, "text_content": "2 d\nEpstein Residence\nNew Generator Budget for Construction\n1/20/2009\nGenerator Work\nBudget Amount\nSupervision & General Conditions\n$\n3,500\nWorth Builders Proj. Mgmt. Fee\n1,000\nStructural Engineering & Geotechnical Work\n2,200\nElectrical Engineering & Architects Work\n4,000\nElectrical Work, Equipment & Machinery\n68,000\nGarage Floor/Driveway Cutting & Repairs\n3,000\nGenerator Foundation & Mounting Slab\n3,200\nScreen Walls (if needed)\nNIC\nRemoval & Replacement of Landscaping\nNIC\nContingency for unknowns\n3,000\nPlumbing Work for New Gas Line\n3,500\nSubtotal\n91,400\nPermits\n2,742\nContractor's Overhead and Profit @10%\n11,297\nGeneral Liability Insurance @1%\n1,054\nBudget Total\n106,493\nNotes:\n1. Owner is responsible for ARCOM Approval costs, if not a staff approval\n2. Owner is responsible for meter costs, if gas meter needs to be upgraded in size\n3. Screen walls around the generator on 3 sides may be required by Code\nLocal architect to determine this & help with ARCOM approvals\n4. This is a Time and Material Budget-Cost plus 10%+1%\nThis not a Guaranteed Maximum Contract Proposal.\n5. Energy Efficient Electric Proposal is attached for your information & review.\nчова штed suaping чалот\n29:40 E06\nEFTA00728708\n", "char_count": 1210}]}