{"efta_number": "EFTA00723402", "page_count": 1, "url": "https://epstein-data.com/EFTA00723402", "pdf_url": "https://epstein-data.com/pdf/EFTA00723402.pdf", "pages": [{"efta_number": "EFTA00723402", "page_number": 0, "text_content": "11:26 AM\n02/02/10\nLSJ, LLC\nJob Estimates vs. Actuals Detail for 1012 - Island Trails\nAll Transactions\nEst. Cost\nAct. Cost\n(S) Diff.\nService\nIsland Trails\n01 Gen. Requirements\n01-610-Material Handling\n1.00\n0.00\n01-621- Temporary Protection\n0.00\n429.18\n-1.00\n429.18\n01-624-Construction Cleaning\n0.00\n140.40\n140.40\n01-645 Expendables\n0.00\n0.00\n0.00\n01-646-Small Tools\n0.00\n0.00\n0.00\nTotal 01 Gen. Requirements\n1.00\n569.58\n568.58\n02 - Sitework\n02-005-Layout\n0.00\n1,048.80\n1,048.80\n02-050-Demolition\n0.00\n1,935.20\n1,935.20\n02-112-Storm Drainage\n0.00\n0.00\n0.00\n02-200-Earthwork\n0.00\n2,287.12\n2,287.12\n02-530- Concrete Paving\n0.00\n13,793.52\n13,793.52\nTotal 02-Sitework\n0.00\n19,064.64\n19,064.64\n03 Concrete\n03-130 - Concrete\n0.00\n703.20\n703.20\n03-301\nAdmixtures\n0.00\n54.60\n54.60\nTotal 03 Concrete\n0.00\n757.80\n757.80\n04 Masonry\n04-450-Stone Veneer\n0.00\n4,991.44\n4,991.44\nTotal 04 Masonry\n0.00\n4,991.44\n4,991.44\nTotal Island Trails\n1.00\n25,383.46\n25,382.46\nTotal Service\nTOTAL\n1.00\n25,383.46\n25,382.46\n1.00\n25,383.46\n25,382.46\n☹ =\n4,471.18 In material cost\n20,912.28 Island grounds fabr\nPage 1\nEFTA00723402\n", "char_count": 1097}]}