{"efta_number": "EFTA00722335", "page_count": 4, "url": "https://epstein-data.com/EFTA00722335", "pdf_url": "https://epstein-data.com/pdf/EFTA00722335.pdf", "pages": [{"efta_number": "EFTA00722335", "page_number": 0, "text_content": "Maguire Group Inc.\nArchitects/Engineers / Planners\n33 Commercial Street\nFoxborough MA 02035\nPhone:\nFax:\nE-Mail:\nJeffrey M. McCormick, PE\nProject Manager\nMAGUIRE\nGROUP\nNovember 3, 2008\nMr. Darren Indyke\nLittle St. James LLC\nSt. Thomas, USVI\nC/o NY Strategy Group\nThe Villard House\n457 Madison Ave., 4th Fl.\nNew York, NY 10022\nRE: Engineering/Architectural Services - Revised Work Order No. 13:\nStorm Water Pollution Prevention Plan (SWPPP), Drainage\nImprovements and CZM drawings\nDear Mr. Indyke:\nMaguire Group Inc. is pleased to present this proposal for revised Work Order No. 13\nunder our Master Agreement to provide engineering services for Little St. James Island.\nThis Work Order is based on the general scope of services, terms, and conditions\ndescribed in the Abbreviated Standard Form of Agreement Between Owner and Architect\nherein known as the Master Agreement, dated February 1, 2007. In general, the services\nproposed in Work Order No. 13 include site/civil engineering design to compile two\nSWPPP's (Storm Water Pollution Prevention Plans), drainage improvement plans and an\nisland-wide CZM drawing package.\nBackground and Scope\nSWPPP-The SWPPP reviews the nature of the construction activities and overall project\nsize and impacts. It is essentially a report to reinforce the controls needed for storm water\nmanagement. An overall hydrologic impact assessment, storm water calculations and best\nmanagement practices for construction activities will be compiled for submission to\nDPNR. The SWPPP is required for sites disturbing over one acre of land as stated in\nDPNR's regulations:\n\"Construction activities disturbing less than one (1) acre of total land area but is part of a\nlarger common plan of development or sale that will ultimately disturb equal to or greater\nthan one (1) acre.\"\nThus far, the Little St. James construction activity permit applications submitted to the\nDPNR's CZM Department include the office pavilion, mechanical building and existing\nWinner of Two Presidential Awards for Design Excellence\nEFTA00722335\n", "char_count": 2046}, {"efta_number": "EFTA00722335", "page_number": 1, "text_content": "MAGUIRE\nGROUP\nLittle St. James LLC\nMr. Darren Indyke\nPage 2 of 4\nresidence. Building permits have been issued for both the office and mechanical building.\nHowever, DPNR now requires that a SWPPP be submitted for the above parameters on all\nnew construction prior to issuing building permits. Therefore, we will need to complete\ntwo phases of SWPPP plans. Phase 1 shall include the existing residence additions and\nalterations which will be submitted as soon as possible. Phase 2 shall include existing\nand proposed island wide construction activities, primarily parcels A and B. The phase 2\nplan will incorporate the program for all roads, drainage improvements, buildings, and\nutilities, etc. that have been or will be installed. This SWPPP will be filed with the island\nwide CZM application. The site/civil engineering required to provide the SWPPP\nincludes the following;\n⚫ Review existing hydrologic analysis completed by Bill McComb.\n• Provide hydrologic calculations for the pre- and post-construction condition\nutilizing the latest existing residence compound drawings for phase 1 and revised\nMoseley survey for phase 2.\n• Provide the existing and proposed whole island hydrologic watershed and drainage\npattern drawings with drainage subareas for phases 1 and 2.\n⚫ Fill out SWPPP forms and compile all pertinent information, maps, soils, BMP\ndata, drainage plans, descriptions, etc. required for both phase 1 and 2 applications.\nSubmit ten copies of each to John Amerling of Lafayette Contractors for filing\nwith the DPNR. Provide copies to appropriate oversight staff. Phase I work will\ncommence immediately after execution of this work order Phase 2 will commence\nafter program concurrence by owner for parcel A & B CZM drawings.\nDrainage Improvement Plans Drawings will be developed to address drainage\nproblems causing erosion at specific locations on the island. This will encompass various\ndrainage structures to collect, convey and discharge storm water in an efficient manner\nthat will reduce erosion. Collection structures will be detailed and located on the\ndrawings and sized based on the contributing subarea watershed. Structures will be\ndesigned to accommodate a 10-year storm event. To minimize visual impacts, structures\nwill be built into exiting walls and will allow for more frequent discharge points.\nDrainage swales lined with rip rap will be used in more remote areas or where topography\nallows. Sedimentation basins will be utilized where practical. All structures will be\nreviewed with the owner's representative for approval. These drainage improvements will\nbe noted in the SWPPP and will be included in the CZM drawing package. The site/civil\nengineering required to provide the drainage improvement drawings include the\nfollowing;\nDevelop approximately six construction drawings showing location and details of\ndrainage improvements (1 overall layout drawing, 4 drainage improvement\ndrawings with 20-scale widows on specific areas and 2 detail sheets).\nWinner of Two Presidential Awards for Design Excellence\nEFTA00722336\n", "char_count": 3058}, {"efta_number": "EFTA00722335", "page_number": 2, "text_content": "Little St. James LLC\nMr. Darren Indyke\nPage 3 of 4\nMAGUIRE\nGROUP\nCZM Drawings - The CZM drawings will incorporate all of the significant, island wide\nconstruction done to date including \"temporary\" buildings, roads, road surfacing, drainage\nimprovements and other structures. Brian Moseley & Associates is currently being\nengaged to update the survey base plan to include all of theses features. The drawings\nwill also include all proposed work such as utility duct banks, road resurfacing, etc. that\nmay currently be envisioned. These drawings are exclusive of the previously permitted\nactivities on parcel C and essentially highlight the balance of remaining construction\nactivities on the island as currently perceived. The site/civil engineering required to\nprovide the CZM drawings include the following;\nDevelop approximately five permit drawings showing existing and new site\nfeatures and proposed improvements. This will include site plans (structures,\nexcavation activities, dirt roads, paved roads, drainage, erosion control plans, and\ndetails.\nDeliverables\nBudget\n•\nSWPPP (phase 1) Existing residence additions and alterations\nSWPPP (phase 2) All existing/proposed island wide construction.\nDrainage improvement construction plans.\nCZM drawings for island wide construction activities\nWe propose to engage in the above-defined design services on a not-to-exceed budget\nbased on the 2008 professional billing rates attached, plus reimbursable expenses.\nReimbursable expense budget is for planning purposes only and could be exceeded if\nadditional copies mailing etc. occur. Invoices will be submitted monthly based upon the\nhours and expenses charged directly to the project in the preceding month. Please refer to\nthe attached spread sheet for man hour distribution. We suggest the establishment of\nWork Order No. 13 budgets as follows:\nSWPPP Phase 1 (Ex. Residence)\n$10,840.00\nSWPPP Phase 2 (Island-wide)\n$13,680.00\nDrainage Improvements\n$23,480.00\nCZM Drawings (Island-wide)\n$20,290.00\nReimbursable Expenses\n$1,000.00\nTotal:\n$69,290.00\nWinner of Two Presidential Awards for Design Excellence\nEFTA00722337\n", "char_count": 2118}, {"efta_number": "EFTA00722335", "page_number": 3, "text_content": "MAGUIRE\nGROUP\nLittle St. James LLC\nMr. Darren Indyke\nPage 4 of 4\nPlease feel free to call me directly if you have any questions. We look forward to\nundertaking this important and interesting project.\nVery truly yours,\nMAGUIRE GROUP, INC.\nдружиласи\nJeffrey M. McCormick, PE\nProject Manager - Land Development\nApproved and accepted this\nday of\n2008\nDarren Indyke - for Little St. James, LLC\ncc: Thomas Hevner -MGI, Eric Douglas- MGI, Files\nWinner of Two Presidential Awards for Design Excellence\nEFTA00722338\n", "char_count": 507}]}